reference process · customer-support · 16 activities · 5 on the roster

Forecast Support Volume

Each period the support operations lead needs to know how many requests each channel will receive in each interval of the coming weeks, and how many people each interval needs to answer them inside the service levels, early enough to build the schedule and to raise a gap before it opens. The staffing-planner agent opens the period's forecast from the last version. The analytics agent reads the history of requests by channel, topic and interval with the source of each figure, and marks the days the history has to be read with care, such as an outage, a holiday or a channel opened partway through the window. The forecaster agent gathers the releases, campaigns and other events already set for the weeks ahead, sets last period's forecast beside what actually arrived, models the requests ahead for each channel and interval with each assumption beside the number it produced, and names any assumption that would change the answer on its own. The analytics agent reads how long each kind of case takes to handle, and the staffing-planner agent turns the requests into the people each interval needs to meet the service levels in force, adds the time people spend away from cases, sets the need beside the people the team has, and sets out the options for each gap. The support operations lead reviews the forecast, the head of support decides on any gap, and the forecast is published at a version. The forecast counts hours for the team as a whole and names no person. The run closes when the forecast is published to the schedule and the team leads, and every gap has a decision from a named person.

The goals
  • Keep each week's forecast within 10% of the requests that arrived
  • Publish the forecast at least 3 weeks before the schedule it feeds begins
  • Plan no more than 5% more hours than the service levels need
  • Raise each staffing gap at least 8 weeks before it opens

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

16 activities from the period's forecast falls due on the planning calendar to the forecast is published and every gap has a decision, 2 of them gates a person has to sign.

Forecast Support Volumethe period's forecast falls due on the planning calendar → the forecast is published and every gap has a decision
too much of the window is unusual tolearn froman assumption nobody can source decidesthe answeran interval needs more people than theteam hasthe lead does not accept an assumptiona gap needs a decisionthe head of support asks for anotheroptionthe period's forecast fallsdue on the planning calendar1Open the Period's Forecastthe horizon, channels andintervals, from the last version2Read the History of Requestsrequests by channel, topic andinterval, with each source3Mark the Unusual Daysoutages, holidays and gaps in thehistory, with each reason4Gather the Events Aheadreleases, campaigns, price changesand the known season5Compare the Last Forecastwith What Arrivedthe forecast against what came,and the reason for each miss6Model the Requests Aheadrequests by channel and interval,assumptions beside numbers7Name the Assumptions ThatDecide the Answerany one assumption that wouldchange the forecast on its own8Read the Time Each Case Takeshandling time by channel andtopic, from the cases closed9Turn the Requests into PeopleNeededthe people each channel andinterval needs for its level10Add the Time Away from Casestraining, coaching, meetings andusual absence, by interval11Set the Need Beside the Teamthe people needed against theteam's hours, by interval12Set Out the Options for a Gapeach option with its effect onservice levels and its cost13Review the Forecastthe support operations leadreviews assumptions and gapsa person signs · never an agent14Decide on a Gapthe head of support chooses anoption or asks for anothera person signs · never an agent15Publish the Forecastforecast and need at a version,for the schedule and leads16Record What the ForecastTaughtwhich assumptions missed, and whatthe next period changesthe forecast is published andevery gap has a decision
The roster this process needs
staffing-planner 7 forecaster 5 analytics 3 support operations lead 1 head of support 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: forecast support volume      id: <team>/forecast-support-volume   v1
from: ref/sup/forecast-support-volume v1
owner: <who>                          effective: <date>
trigger: the period's forecast falls due on <your planning calendar>, or
         <your support operations lead role> calls a forecast out of
         cycle after an event that moves volume, such as a release date
         that moved or a campaign added
         watch: record=<volume forecast> system=<your scheduling system>
                change=<the forecast date comes up, or a forecast is
                called out of cycle>
concurrency: one forecast is open at a time for each support team - a
             forecast called out of cycle replaces the period's run and
             starts from the last published version, and the day's
             queues keep running beside it
goal: a forecast of requests for each channel by <interval> for <weeks>,
      published at a version by <the day>, with each assumption beside
      the number it produced, last period's forecast set beside what
      arrived, the people each interval needs to meet the service levels
      in force, and every gap decided by a named person
phases:
  open-forecast      - system: the period's forecast opened from the last
                       published version, with the horizon, the channels,
                       the intervals and the service levels in force at
                       their version
                       owner: staffing-planner    after: trigger
                       automation: <level>
  read-history       - runs collect-and-report: the requests that arrived
                       on each channel by topic and interval over <your
                       history window>, from <your support system>, <your
                       phone system> and <your chat tool>, each figure with
                       its source
                       owner: analytics           after: open-forecast
                       automation: <level>
  mark-unusual-days  - runs assessment: each day the history has to be
                       read with care, such as an outage, a holiday, a
                       channel opened partway through or a gap in the
                       record, marked with its reason so the model can
                       leave it out or weigh it
                       owner: analytics           after: read-history
                       automation: <level>
  gather-events      - runs collect-and-report: the releases on <your
                       release calendar>, the campaigns on Marketing's
                       calendar, the price changes, the renewal dates that
                       bunch and the season, each with its date and where
                       it was read
                       owner: forecaster          after: open-forecast
                       automation: <level>
  compare-last       - runs assessment: last period's forecast set beside
                       the requests that arrived on each channel and in
                       each interval, with the reason for each miss above
                       <threshold>
                       owner: forecaster          after: mark-unusual-days
                       automation: <level>
  model-requests     - system: the requests ahead modelled for each
                       channel by interval from the history, the season
                       and the events already known, with each assumption
                       written beside the number it produced
                       owner: forecaster
                       after: mark-unusual-days + gather-events +
                       compare-last               automation: <level>
  name-assumptions   - runs assessment: each assumption that would change
                       the forecast on its own, and each rate nobody can
                       source, reported as unsourced with no figure
                       supplied in its place
                       owner: forecaster          after: model-requests
                       automation: <level>
  read-handle-time   - runs collect-and-report: how long each kind of case
                       takes to handle on each channel, and how many
                       contacts a case needs before it closes, from the
                       cases closed in the window
                       owner: analytics           after: open-forecast
                       automation: <level>
  people-needed      - runs assessment: the requests turned into the
                       people each channel and interval needs to meet the
                       service level it promises, with the method and
                       every input written down
                       owner: staffing-planner
                       after: name-assumptions + read-handle-time
                       automation: <level>
  add-time-away      - system: the hours spent away from cases added by
                       interval, such as training, coaching, meetings and
                       the usual absence, read from the last periods for
                       the team as a whole
                       owner: staffing-planner    after: people-needed
                       automation: <level>
  set-against-team   - runs assessment: the people needed set beside the
                       hours the team has in each interval, from <your
                       scheduling system>, with each gap named by channel,
                       interval and date
                       owner: staffing-planner    after: add-time-away
                       automation: <level>
  set-out-options    - runs assessment: each way to meet a gap, such as
                       moving hours between channels, cover from the
                       provider the roster names, extra hours inside <your
                       working time policy>, positions asked of Human
                       resources or a service level proposed for change,
                       with what each gives and what it costs
                       owner: staffing-planner
                       after: set-against-team, when an interval is short,
                       and decide-gap when the head of support asks for
                       another                    automation: <level>
  review-forecast    - convenes approval: <your support operations lead
                       role> reviews the assumptions, the misses and the
                       gaps, and accepts the forecast or names the lines
                       to model again
                       owner: <your support operations lead role>
                       after: set-against-team, and set-out-options when
                       it ran                     by: <days>
                       automation: never
  decide-gap         - convenes decide-and-announce: <your head of support
                       role> chooses how each gap is met, or asks for
                       another option, and each choice then runs through
                       its own process with its own approvals
                       owner: <your head of support role>
                       after: review-forecast, when a gap is open
                       by: <days>                 automation: never
  publish-forecast   - system: the forecast and the people needed
                       published at a version to <your support operations
                       lead role>, the team leads and the schedule, with
                       every gap and the decision on it
                       owner: staffing-planner
                       after: review-forecast, and decide-gap when it ran
                       by: <the day>              automation: <level>
  record-learning    - convenes debrief: which assumptions missed and by
                       how much, which events came late or were missed,
                       and what the next period's forecast does
                       differently
                       owner: forecaster          after: publish-forecast
                       automation: <level>
run-scoped:
  inputs   - runs roll-call                     owner: staffing-planner
             every: <cadence>
             from: open-forecast       until: model-requests
handoffs:
  open-forecast -> read-history / gather-events / read-handle-time
    [forecast-frame]: the horizon, the channels, the intervals and the
    service levels at their version
  read-history -> mark-unusual-days [request-history]: the requests by
    channel, topic and interval, each figure with its source
  mark-unusual-days -> compare-last / model-requests [marked-history]: the
    history with each unusual day marked and its reason
  gather-events -> model-requests [events-ahead]: each release, campaign,
    price change and season with its date and source
  compare-last -> model-requests [forecast-misses]: last period's forecast
    beside what arrived, with the reason for each miss
  model-requests -> name-assumptions [request-forecast]: the requests by
    channel and interval, each assumption beside its number
  name-assumptions -> people-needed [tested-forecast]: the forecast with
    each deciding assumption and each unsourced rate named
  read-handle-time -> people-needed [handling-times]: the handling time by
    channel and topic, and the contacts each case needs
  people-needed -> add-time-away [people-per-interval]: the people each
    channel and interval needs, with the method and its inputs
  add-time-away -> set-against-team [hours-needed]: the hours needed by
    interval with the time away from cases added
  set-against-team -> review-forecast / set-out-options [need-against-team]:
    the need beside the hours the team has, and each gap by date
  set-out-options -> review-forecast [gap-options]: each option with what
    it gives the service levels and what it costs
  review-forecast -> decide-gap / publish-forecast [reviewed-forecast]:
    the forecast as the lead accepted it, with each open gap
  decide-gap -> publish-forecast [gap-decision]: the option chosen for
    each gap, by whom, and the process it now runs through
  publish-forecast -> record-learning [published-forecast]: the forecast at
    its version, and who it went to
deviations:
  mark-unusual-days -> read-history [window-too-unusual]: too much of the
    window is unusual to learn from, so a longer window is read and the
    forecaster agent says before modelling that the data is thin
  name-assumptions -> gather-events [unsourced-assumption-decides]: an
    assumption nobody can source decides the answer, so the event behind
    it is asked of its owner and the assumption goes to the review marked
    as unsourced if no answer comes
  set-against-team -> set-out-options [interval-short]: an interval needs
    more people than the team has, so the options for meeting it are set
    out before the review
  review-forecast -> model-requests [assumption-rejected]: the support
    operations lead does not accept an assumption, so the lines it
    touches are modelled again on the assumption the lead names, and both
    versions are kept
  decide-gap -> set-out-options [another-option]: the head of support asks
    for another option, so the options are set out again with the one
    asked for
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the support operations lead and
           the head of support>
  systems: <your support system> (read), <your phone system> (read),
           <your chat tool> (read), <your scheduling system> (write),
           <your release calendar> (read), the notification channel
           (write)
  data:    <your service level policy> <version>, <your planning
           calendar> <version>, <your working time policy> <version>,
           <your history window>, Marketing's campaign calendar
           <version>
policy:
  the forecast starts from the requests that actually arrived, and every
    number beyond them names its source and the assumption behind it
  a rate nobody can source is reported as unsourced, and no agent
    supplies a figure of its own in its place
  the people needed are worked out against the service levels in force
    at their version, and a forecast never lowers a service level by
    planning fewer people than it needs
  the forecast counts hours for the team as a whole, and it names no
    person and reports no named person's time
  the choice of how to meet a gap is a human decision, and extra hours,
    outside cover, new positions and a service level change each run
    through their own process with their own approvals
  a gap reaches <your head of support role> in the period it first
    shows, with the options and what each would cost
measures:
  cycle time: <days> from the forecast date to the forecast published
  on time: <target> share of forecasts published by <the day>
  volume: <channels> and <intervals per week>
  quality gate: every number in the forecast names its source, and last
                period's forecast sits beside what arrived with every miss
                above <threshold> explained
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

340 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: forecast support volume      id: <team>/forecast-support-volume   v1
from: ref/sup/forecast-support-volume v1
owner: <who>                          effective: <date>
trigger: the period's forecast falls due on <your planning calendar>, or
         <your support operations lead role> calls a forecast out of
         cycle after an event that moves volume, such as a release date
         that moved or a campaign added
         watch: record=<volume forecast> system=<your scheduling system>
                change=<the forecast date comes up, or a forecast is
                called out of cycle>
concurrency: one forecast is open at a time for each support team - a
             forecast called out of cycle replaces the period's run and
             starts from the last published version, and the day's
             queues keep running beside it
goal: a forecast of requests for each channel by <interval> for <weeks>,
      published at a version by <the day>, with each assumption beside
      the number it produced, last period's forecast set beside what
      arrived, the people each interval needs to meet the service levels
      in force, and every gap decided by a named person
phases:
  open-forecast      - system: the period's forecast opened from the last
                       published version, with the horizon, the channels,
                       the intervals and the service levels in force at
                       their version
                       owner: staffing-planner    after: trigger
                       automation: <level>
  read-history       - runs collect-and-report: the requests that arrived
                       on each channel by topic and interval over <your
                       history window>, from <your support system>, <your
                       phone system> and <your chat tool>, each figure with
                       its source
                       owner: analytics           after: open-forecast
                       automation: <level>
  mark-unusual-days  - runs assessment: each day the history has to be
                       read with care, such as an outage, a holiday, a
                       channel opened partway through or a gap in the
                       record, marked with its reason so the model can
                       leave it out or weigh it
                       owner: analytics           after: read-history
                       automation: <level>
  gather-events      - runs collect-and-report: the releases on <your
                       release calendar>, the campaigns on Marketing's
                       calendar, the price changes, the renewal dates that
                       bunch and the season, each with its date and where
                       it was read
                       owner: forecaster          after: open-forecast
                       automation: <level>
  compare-last       - runs assessment: last period's forecast set beside
                       the requests that arrived on each channel and in
                       each interval, with the reason for each miss above
                       <threshold>
                       owner: forecaster          after: mark-unusual-days
                       automation: <level>
  model-requests     - system: the requests ahead modelled for each
                       channel by interval from the history, the season
                       and the events already known, with each assumption
                       written beside the number it produced
                       owner: forecaster
                       after: mark-unusual-days + gather-events +
                       compare-last               automation: <level>
  name-assumptions   - runs assessment: each assumption that would change
                       the forecast on its own, and each rate nobody can
                       source, reported as unsourced with no figure
                       supplied in its place
                       owner: forecaster          after: model-requests
                       automation: <level>
  read-handle-time   - runs collect-and-report: how long each kind of case
                       takes to handle on each channel, and how many
                       contacts a case needs before it closes, from the
                       cases closed in the window
                       owner: analytics           after: open-forecast
                       automation: <level>
  people-needed      - runs assessment: the requests turned into the
                       people each channel and interval needs to meet the
                       service level it promises, with the method and
                       every input written down
                       owner: staffing-planner
                       after: name-assumptions + read-handle-time
                       automation: <level>
  add-time-away      - system: the hours spent away from cases added by
                       interval, such as training, coaching, meetings and
                       the usual absence, read from the last periods for
                       the team as a whole
                       owner: staffing-planner    after: people-needed
                       automation: <level>
  set-against-team   - runs assessment: the people needed set beside the
                       hours the team has in each interval, from <your
                       scheduling system>, with each gap named by channel,
                       interval and date
                       owner: staffing-planner    after: add-time-away
                       automation: <level>
  set-out-options    - runs assessment: each way to meet a gap, such as
                       moving hours between channels, cover from the
                       provider the roster names, extra hours inside <your
                       working time policy>, positions asked of Human
                       resources or a service level proposed for change,
                       with what each gives and what it costs
                       owner: staffing-planner
                       after: set-against-team, when an interval is short,
                       and decide-gap when the head of support asks for
                       another                    automation: <level>
  review-forecast    - convenes approval: <your support operations lead
                       role> reviews the assumptions, the misses and the
                       gaps, and accepts the forecast or names the lines
                       to model again
                       owner: <your support operations lead role>
                       after: set-against-team, and set-out-options when
                       it ran                     by: <days>
                       automation: never
  decide-gap         - convenes decide-and-announce: <your head of support
                       role> chooses how each gap is met, or asks for
                       another option, and each choice then runs through
                       its own process with its own approvals
                       owner: <your head of support role>
                       after: review-forecast, when a gap is open
                       by: <days>                 automation: never
  publish-forecast   - system: the forecast and the people needed
                       published at a version to <your support operations
                       lead role>, the team leads and the schedule, with
                       every gap and the decision on it
                       owner: staffing-planner
                       after: review-forecast, and decide-gap when it ran
                       by: <the day>              automation: <level>
  record-learning    - convenes debrief: which assumptions missed and by
                       how much, which events came late or were missed,
                       and what the next period's forecast does
                       differently
                       owner: forecaster          after: publish-forecast
                       automation: <level>
run-scoped:
  inputs   - runs roll-call                     owner: staffing-planner
             every: <cadence>
             from: open-forecast       until: model-requests
handoffs:
  open-forecast -> read-history / gather-events / read-handle-time
    [forecast-frame]: the horizon, the channels, the intervals and the
    service levels at their version
  read-history -> mark-unusual-days [request-history]: the requests by
    channel, topic and interval, each figure with its source
  mark-unusual-days -> compare-last / model-requests [marked-history]: the
    history with each unusual day marked and its reason
  gather-events -> model-requests [events-ahead]: each release, campaign,
    price change and season with its date and source
  compare-last -> model-requests [forecast-misses]: last period's forecast
    beside what arrived, with the reason for each miss
  model-requests -> name-assumptions [request-forecast]: the requests by
    channel and interval, each assumption beside its number
  name-assumptions -> people-needed [tested-forecast]: the forecast with
    each deciding assumption and each unsourced rate named
  read-handle-time -> people-needed [handling-times]: the handling time by
    channel and topic, and the contacts each case needs
  people-needed -> add-time-away [people-per-interval]: the people each
    channel and interval needs, with the method and its inputs
  add-time-away -> set-against-team [hours-needed]: the hours needed by
    interval with the time away from cases added
  set-against-team -> review-forecast / set-out-options [need-against-team]:
    the need beside the hours the team has, and each gap by date
  set-out-options -> review-forecast [gap-options]: each option with what
    it gives the service levels and what it costs
  review-forecast -> decide-gap / publish-forecast [reviewed-forecast]:
    the forecast as the lead accepted it, with each open gap
  decide-gap -> publish-forecast [gap-decision]: the option chosen for
    each gap, by whom, and the process it now runs through
  publish-forecast -> record-learning [published-forecast]: the forecast at
    its version, and who it went to
deviations:
  mark-unusual-days -> read-history [window-too-unusual]: too much of the
    window is unusual to learn from, so a longer window is read and the
    forecaster agent says before modelling that the data is thin
  name-assumptions -> gather-events [unsourced-assumption-decides]: an
    assumption nobody can source decides the answer, so the event behind
    it is asked of its owner and the assumption goes to the review marked
    as unsourced if no answer comes
  set-against-team -> set-out-options [interval-short]: an interval needs
    more people than the team has, so the options for meeting it are set
    out before the review
  review-forecast -> model-requests [assumption-rejected]: the support
    operations lead does not accept an assumption, so the lines it
    touches are modelled again on the assumption the lead names, and both
    versions are kept
  decide-gap -> set-out-options [another-option]: the head of support asks
    for another option, so the options are set out again with the one
    asked for
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the support operations lead and
           the head of support>
  systems: <your support system> (read), <your phone system> (read),
           <your chat tool> (read), <your scheduling system> (write),
           <your release calendar> (read), the notification channel
           (write)
  data:    <your service level policy> <version>, <your planning
           calendar> <version>, <your working time policy> <version>,
           <your history window>, Marketing's campaign calendar
           <version>
policy:
  the forecast starts from the requests that actually arrived, and every
    number beyond them names its source and the assumption behind it
  a rate nobody can source is reported as unsourced, and no agent
    supplies a figure of its own in its place
  the people needed are worked out against the service levels in force
    at their version, and a forecast never lowers a service level by
    planning fewer people than it needs
  the forecast counts hours for the team as a whole, and it names no
    person and reports no named person's time
  the choice of how to meet a gap is a human decision, and extra hours,
    outside cover, new positions and a service level change each run
    through their own process with their own approvals
  a gap reaches <your head of support role> in the period it first
    shows, with the options and what each would cost
measures:
  cycle time: <days> from the forecast date to the forecast published
  on time: <target> share of forecasts published by <the day>
  volume: <channels> and <intervals per week>
  quality gate: every number in the forecast names its source, and last
                period's forecast sits beside what arrived with every miss
                above <threshold> explained
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

395 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: forecast support volume      id: <team>/forecast-support-volume   v1
from: ref/sup/forecast-support-volume v1
owner: <who>                          effective: <date>
trigger: the period's forecast falls due on <your planning calendar>, or
         <your support operations lead role> calls a forecast out of
         cycle after an event that moves volume, such as a release date
         that moved or a campaign added
         watch: record=<volume forecast> system=<your scheduling system>
                change=<the forecast date comes up, or a forecast is
                called out of cycle>
concurrency: one forecast is open at a time for each support team - a
             forecast called out of cycle replaces the period's run and
             starts from the last published version, and the day's
             queues keep running beside it
goal: a forecast of requests for each channel by <interval> for <weeks>,
      published at a version by <the day>, with each assumption beside
      the number it produced, last period's forecast set beside what
      arrived, the people each interval needs to meet the service levels
      in force, and every gap decided by a named person
phases:
  open-forecast      - system: the period's forecast opened from the last
                       published version, with the horizon, the channels,
                       the intervals and the service levels in force at
                       their version
                       owner: staffing-planner    after: trigger
                       automation: <level>
  read-history       - runs collect-and-report: the requests that arrived
                       on each channel by topic and interval over <your
                       history window>, from <your support system>, <your
                       phone system> and <your chat tool>, each figure with
                       its source
                       owner: analytics           after: open-forecast
                       automation: <level>
  mark-unusual-days  - runs assessment: each day the history has to be
                       read with care, such as an outage, a holiday, a
                       channel opened partway through or a gap in the
                       record, marked with its reason so the model can
                       leave it out or weigh it
                       owner: analytics           after: read-history
                       automation: <level>
  gather-events      - runs collect-and-report: the releases on <your
                       release calendar>, the campaigns on Marketing's
                       calendar, the price changes, the renewal dates that
                       bunch and the season, each with its date and where
                       it was read
                       owner: forecaster          after: open-forecast
                       automation: <level>
  compare-last       - runs assessment: last period's forecast set beside
                       the requests that arrived on each channel and in
                       each interval, with the reason for each miss above
                       <threshold>
                       owner: forecaster          after: mark-unusual-days
                       automation: <level>
  model-requests     - system: the requests ahead modelled for each
                       channel by interval from the history, the season
                       and the events already known, with each assumption
                       written beside the number it produced
                       owner: forecaster
                       after: mark-unusual-days + gather-events +
                       compare-last               automation: <level>
  name-assumptions   - runs assessment: each assumption that would change
                       the forecast on its own, and each rate nobody can
                       source, reported as unsourced with no figure
                       supplied in its place
                       owner: forecaster          after: model-requests
                       automation: <level>
  read-handle-time   - runs collect-and-report: how long each kind of case
                       takes to handle on each channel, and how many
                       contacts a case needs before it closes, from the
                       cases closed in the window
                       owner: analytics           after: open-forecast
                       automation: <level>
  people-needed      - runs assessment: the requests turned into the
                       people each channel and interval needs to meet the
                       service level it promises, with the method and
                       every input written down
                       owner: staffing-planner
                       after: name-assumptions + read-handle-time
                       automation: <level>
  add-time-away      - system: the hours spent away from cases added by
                       interval, such as training, coaching, meetings and
                       the usual absence, read from the last periods for
                       the team as a whole
                       owner: staffing-planner    after: people-needed
                       automation: <level>
  set-against-team   - runs assessment: the people needed set beside the
                       hours the team has in each interval, from <your
                       scheduling system>, with each gap named by channel,
                       interval and date
                       owner: staffing-planner    after: add-time-away
                       automation: <level>
  set-out-options    - runs assessment: each way to meet a gap, such as
                       moving hours between channels, cover from the
                       provider the roster names, extra hours inside <your
                       working time policy>, positions asked of Human
                       resources or a service level proposed for change,
                       with what each gives and what it costs
                       owner: staffing-planner
                       after: set-against-team, when an interval is short,
                       and decide-gap when the head of support asks for
                       another                    automation: <level>
  review-forecast    - convenes approval: <your support operations lead
                       role> reviews the assumptions, the misses and the
                       gaps, and accepts the forecast or names the lines
                       to model again
                       owner: <your support operations lead role>
                       after: set-against-team, and set-out-options when
                       it ran                     by: <days>
                       automation: never
  decide-gap         - convenes decide-and-announce: <your head of support
                       role> chooses how each gap is met, or asks for
                       another option, and each choice then runs through
                       its own process with its own approvals
                       owner: <your head of support role>
                       after: review-forecast, when a gap is open
                       by: <days>                 automation: never
  publish-forecast   - system: the forecast and the people needed
                       published at a version to <your support operations
                       lead role>, the team leads and the schedule, with
                       every gap and the decision on it
                       owner: staffing-planner
                       after: review-forecast, and decide-gap when it ran
                       by: <the day>              automation: <level>
  record-learning    - convenes debrief: which assumptions missed and by
                       how much, which events came late or were missed,
                       and what the next period's forecast does
                       differently
                       owner: forecaster          after: publish-forecast
                       automation: <level>
run-scoped:
  inputs   - runs roll-call                     owner: staffing-planner
             every: <cadence>
             from: open-forecast       until: model-requests
handoffs:
  open-forecast -> read-history / gather-events / read-handle-time
    [forecast-frame]: the horizon, the channels, the intervals and the
    service levels at their version
  read-history -> mark-unusual-days [request-history]: the requests by
    channel, topic and interval, each figure with its source
  mark-unusual-days -> compare-last / model-requests [marked-history]: the
    history with each unusual day marked and its reason
  gather-events -> model-requests [events-ahead]: each release, campaign,
    price change and season with its date and source
  compare-last -> model-requests [forecast-misses]: last period's forecast
    beside what arrived, with the reason for each miss
  model-requests -> name-assumptions [request-forecast]: the requests by
    channel and interval, each assumption beside its number
  name-assumptions -> people-needed [tested-forecast]: the forecast with
    each deciding assumption and each unsourced rate named
  read-handle-time -> people-needed [handling-times]: the handling time by
    channel and topic, and the contacts each case needs
  people-needed -> add-time-away [people-per-interval]: the people each
    channel and interval needs, with the method and its inputs
  add-time-away -> set-against-team [hours-needed]: the hours needed by
    interval with the time away from cases added
  set-against-team -> review-forecast / set-out-options [need-against-team]:
    the need beside the hours the team has, and each gap by date
  set-out-options -> review-forecast [gap-options]: each option with what
    it gives the service levels and what it costs
  review-forecast -> decide-gap / publish-forecast [reviewed-forecast]:
    the forecast as the lead accepted it, with each open gap
  decide-gap -> publish-forecast [gap-decision]: the option chosen for
    each gap, by whom, and the process it now runs through
  publish-forecast -> record-learning [published-forecast]: the forecast at
    its version, and who it went to
deviations:
  mark-unusual-days -> read-history [window-too-unusual]: too much of the
    window is unusual to learn from, so a longer window is read and the
    forecaster agent says before modelling that the data is thin
  name-assumptions -> gather-events [unsourced-assumption-decides]: an
    assumption nobody can source decides the answer, so the event behind
    it is asked of its owner and the assumption goes to the review marked
    as unsourced if no answer comes
  set-against-team -> set-out-options [interval-short]: an interval needs
    more people than the team has, so the options for meeting it are set
    out before the review
  review-forecast -> model-requests [assumption-rejected]: the support
    operations lead does not accept an assumption, so the lines it
    touches are modelled again on the assumption the lead names, and both
    versions are kept
  decide-gap -> set-out-options [another-option]: the head of support asks
    for another option, so the options are set out again with the one
    asked for
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the support operations lead and
           the head of support>
  systems: <your support system> (read), <your phone system> (read),
           <your chat tool> (read), <your scheduling system> (write),
           <your release calendar> (read), the notification channel
           (write)
  data:    <your service level policy> <version>, <your planning
           calendar> <version>, <your working time policy> <version>,
           <your history window>, Marketing's campaign calendar
           <version>
policy:
  the forecast starts from the requests that actually arrived, and every
    number beyond them names its source and the assumption behind it
  a rate nobody can source is reported as unsourced, and no agent
    supplies a figure of its own in its place
  the people needed are worked out against the service levels in force
    at their version, and a forecast never lowers a service level by
    planning fewer people than it needs
  the forecast counts hours for the team as a whole, and it names no
    person and reports no named person's time
  the choice of how to meet a gap is a human decision, and extra hours,
    outside cover, new positions and a service level change each run
    through their own process with their own approvals
  a gap reaches <your head of support role> in the period it first
    shows, with the options and what each would cost
measures:
  cycle time: <days> from the forecast date to the forecast published
  on time: <target> share of forecasts published by <the day>
  volume: <channels> and <intervals per week>
  quality gate: every number in the forecast names its source, and last
                period's forecast sits beside what arrived with every miss
                above <threshold> explained
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

400 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: forecast support volume      id: <team>/forecast-support-volume   v1
from: ref/sup/forecast-support-volume v1
owner: <who>                          effective: <date>
trigger: the period's forecast falls due on <your planning calendar>, or
         <your support operations lead role> calls a forecast out of
         cycle after an event that moves volume, such as a release date
         that moved or a campaign added
         watch: record=<volume forecast> system=<your scheduling system>
                change=<the forecast date comes up, or a forecast is
                called out of cycle>
concurrency: one forecast is open at a time for each support team - a
             forecast called out of cycle replaces the period's run and
             starts from the last published version, and the day's
             queues keep running beside it
goal: a forecast of requests for each channel by <interval> for <weeks>,
      published at a version by <the day>, with each assumption beside
      the number it produced, last period's forecast set beside what
      arrived, the people each interval needs to meet the service levels
      in force, and every gap decided by a named person
phases:
  open-forecast      - system: the period's forecast opened from the last
                       published version, with the horizon, the channels,
                       the intervals and the service levels in force at
                       their version
                       owner: staffing-planner    after: trigger
                       automation: <level>
  read-history       - runs collect-and-report: the requests that arrived
                       on each channel by topic and interval over <your
                       history window>, from <your support system>, <your
                       phone system> and <your chat tool>, each figure with
                       its source
                       owner: analytics           after: open-forecast
                       automation: <level>
  mark-unusual-days  - runs assessment: each day the history has to be
                       read with care, such as an outage, a holiday, a
                       channel opened partway through or a gap in the
                       record, marked with its reason so the model can
                       leave it out or weigh it
                       owner: analytics           after: read-history
                       automation: <level>
  gather-events      - runs collect-and-report: the releases on <your
                       release calendar>, the campaigns on Marketing's
                       calendar, the price changes, the renewal dates that
                       bunch and the season, each with its date and where
                       it was read
                       owner: forecaster          after: open-forecast
                       automation: <level>
  compare-last       - runs assessment: last period's forecast set beside
                       the requests that arrived on each channel and in
                       each interval, with the reason for each miss above
                       <threshold>
                       owner: forecaster          after: mark-unusual-days
                       automation: <level>
  model-requests     - system: the requests ahead modelled for each
                       channel by interval from the history, the season
                       and the events already known, with each assumption
                       written beside the number it produced
                       owner: forecaster
                       after: mark-unusual-days + gather-events +
                       compare-last               automation: <level>
  name-assumptions   - runs assessment: each assumption that would change
                       the forecast on its own, and each rate nobody can
                       source, reported as unsourced with no figure
                       supplied in its place
                       owner: forecaster          after: model-requests
                       automation: <level>
  read-handle-time   - runs collect-and-report: how long each kind of case
                       takes to handle on each channel, and how many
                       contacts a case needs before it closes, from the
                       cases closed in the window
                       owner: analytics           after: open-forecast
                       automation: <level>
  people-needed      - runs assessment: the requests turned into the
                       people each channel and interval needs to meet the
                       service level it promises, with the method and
                       every input written down
                       owner: staffing-planner
                       after: name-assumptions + read-handle-time
                       automation: <level>
  add-time-away      - system: the hours spent away from cases added by
                       interval, such as training, coaching, meetings and
                       the usual absence, read from the last periods for
                       the team as a whole
                       owner: staffing-planner    after: people-needed
                       automation: <level>
  set-against-team   - runs assessment: the people needed set beside the
                       hours the team has in each interval, from <your
                       scheduling system>, with each gap named by channel,
                       interval and date
                       owner: staffing-planner    after: add-time-away
                       automation: <level>
  set-out-options    - runs assessment: each way to meet a gap, such as
                       moving hours between channels, cover from the
                       provider the roster names, extra hours inside <your
                       working time policy>, positions asked of Human
                       resources or a service level proposed for change,
                       with what each gives and what it costs
                       owner: staffing-planner
                       after: set-against-team, when an interval is short,
                       and decide-gap when the head of support asks for
                       another                    automation: <level>
  review-forecast    - convenes approval: <your support operations lead
                       role> reviews the assumptions, the misses and the
                       gaps, and accepts the forecast or names the lines
                       to model again
                       owner: <your support operations lead role>
                       after: set-against-team, and set-out-options when
                       it ran                     by: <days>
                       automation: never
  decide-gap         - convenes decide-and-announce: <your head of support
                       role> chooses how each gap is met, or asks for
                       another option, and each choice then runs through
                       its own process with its own approvals
                       owner: <your head of support role>
                       after: review-forecast, when a gap is open
                       by: <days>                 automation: never
  publish-forecast   - system: the forecast and the people needed
                       published at a version to <your support operations
                       lead role>, the team leads and the schedule, with
                       every gap and the decision on it
                       owner: staffing-planner
                       after: review-forecast, and decide-gap when it ran
                       by: <the day>              automation: <level>
  record-learning    - convenes debrief: which assumptions missed and by
                       how much, which events came late or were missed,
                       and what the next period's forecast does
                       differently
                       owner: forecaster          after: publish-forecast
                       automation: <level>
run-scoped:
  inputs   - runs roll-call                     owner: staffing-planner
             every: <cadence>
             from: open-forecast       until: model-requests
handoffs:
  open-forecast -> read-history / gather-events / read-handle-time
    [forecast-frame]: the horizon, the channels, the intervals and the
    service levels at their version
  read-history -> mark-unusual-days [request-history]: the requests by
    channel, topic and interval, each figure with its source
  mark-unusual-days -> compare-last / model-requests [marked-history]: the
    history with each unusual day marked and its reason
  gather-events -> model-requests [events-ahead]: each release, campaign,
    price change and season with its date and source
  compare-last -> model-requests [forecast-misses]: last period's forecast
    beside what arrived, with the reason for each miss
  model-requests -> name-assumptions [request-forecast]: the requests by
    channel and interval, each assumption beside its number
  name-assumptions -> people-needed [tested-forecast]: the forecast with
    each deciding assumption and each unsourced rate named
  read-handle-time -> people-needed [handling-times]: the handling time by
    channel and topic, and the contacts each case needs
  people-needed -> add-time-away [people-per-interval]: the people each
    channel and interval needs, with the method and its inputs
  add-time-away -> set-against-team [hours-needed]: the hours needed by
    interval with the time away from cases added
  set-against-team -> review-forecast / set-out-options [need-against-team]:
    the need beside the hours the team has, and each gap by date
  set-out-options -> review-forecast [gap-options]: each option with what
    it gives the service levels and what it costs
  review-forecast -> decide-gap / publish-forecast [reviewed-forecast]:
    the forecast as the lead accepted it, with each open gap
  decide-gap -> publish-forecast [gap-decision]: the option chosen for
    each gap, by whom, and the process it now runs through
  publish-forecast -> record-learning [published-forecast]: the forecast at
    its version, and who it went to
deviations:
  mark-unusual-days -> read-history [window-too-unusual]: too much of the
    window is unusual to learn from, so a longer window is read and the
    forecaster agent says before modelling that the data is thin
  name-assumptions -> gather-events [unsourced-assumption-decides]: an
    assumption nobody can source decides the answer, so the event behind
    it is asked of its owner and the assumption goes to the review marked
    as unsourced if no answer comes
  set-against-team -> set-out-options [interval-short]: an interval needs
    more people than the team has, so the options for meeting it are set
    out before the review
  review-forecast -> model-requests [assumption-rejected]: the support
    operations lead does not accept an assumption, so the lines it
    touches are modelled again on the assumption the lead names, and both
    versions are kept
  decide-gap -> set-out-options [another-option]: the head of support asks
    for another option, so the options are set out again with the one
    asked for
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the support operations lead and
           the head of support>
  systems: <your support system> (read), <your phone system> (read),
           <your chat tool> (read), <your scheduling system> (write),
           <your release calendar> (read), the notification channel
           (write)
  data:    <your service level policy> <version>, <your planning
           calendar> <version>, <your working time policy> <version>,
           <your history window>, Marketing's campaign calendar
           <version>
policy:
  the forecast starts from the requests that actually arrived, and every
    number beyond them names its source and the assumption behind it
  a rate nobody can source is reported as unsourced, and no agent
    supplies a figure of its own in its place
  the people needed are worked out against the service levels in force
    at their version, and a forecast never lowers a service level by
    planning fewer people than it needs
  the forecast counts hours for the team as a whole, and it names no
    person and reports no named person's time
  the choice of how to meet a gap is a human decision, and extra hours,
    outside cover, new positions and a service level change each run
    through their own process with their own approvals
  a gap reaches <your head of support role> in the period it first
    shows, with the options and what each would cost
measures:
  cycle time: <days> from the forecast date to the forecast published
  on time: <target> share of forecasts published by <the day>
  volume: <channels> and <intervals per week>
  quality gate: every number in the forecast names its source, and last
                period's forecast sits beside what arrived with every miss
                above <threshold> explained
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

391 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: forecast support volume      id: <team>/forecast-support-volume   v1
from: ref/sup/forecast-support-volume v1
owner: <who>                          effective: <date>
trigger: the period's forecast falls due on <your planning calendar>, or
         <your support operations lead role> calls a forecast out of
         cycle after an event that moves volume, such as a release date
         that moved or a campaign added
         watch: record=<volume forecast> system=<your scheduling system>
                change=<the forecast date comes up, or a forecast is
                called out of cycle>
concurrency: one forecast is open at a time for each support team - a
             forecast called out of cycle replaces the period's run and
             starts from the last published version, and the day's
             queues keep running beside it
goal: a forecast of requests for each channel by <interval> for <weeks>,
      published at a version by <the day>, with each assumption beside
      the number it produced, last period's forecast set beside what
      arrived, the people each interval needs to meet the service levels
      in force, and every gap decided by a named person
phases:
  open-forecast      - system: the period's forecast opened from the last
                       published version, with the horizon, the channels,
                       the intervals and the service levels in force at
                       their version
                       owner: staffing-planner    after: trigger
                       automation: <level>
  read-history       - runs collect-and-report: the requests that arrived
                       on each channel by topic and interval over <your
                       history window>, from <your support system>, <your
                       phone system> and <your chat tool>, each figure with
                       its source
                       owner: analytics           after: open-forecast
                       automation: <level>
  mark-unusual-days  - runs assessment: each day the history has to be
                       read with care, such as an outage, a holiday, a
                       channel opened partway through or a gap in the
                       record, marked with its reason so the model can
                       leave it out or weigh it
                       owner: analytics           after: read-history
                       automation: <level>
  gather-events      - runs collect-and-report: the releases on <your
                       release calendar>, the campaigns on Marketing's
                       calendar, the price changes, the renewal dates that
                       bunch and the season, each with its date and where
                       it was read
                       owner: forecaster          after: open-forecast
                       automation: <level>
  compare-last       - runs assessment: last period's forecast set beside
                       the requests that arrived on each channel and in
                       each interval, with the reason for each miss above
                       <threshold>
                       owner: forecaster          after: mark-unusual-days
                       automation: <level>
  model-requests     - system: the requests ahead modelled for each
                       channel by interval from the history, the season
                       and the events already known, with each assumption
                       written beside the number it produced
                       owner: forecaster
                       after: mark-unusual-days + gather-events +
                       compare-last               automation: <level>
  name-assumptions   - runs assessment: each assumption that would change
                       the forecast on its own, and each rate nobody can
                       source, reported as unsourced with no figure
                       supplied in its place
                       owner: forecaster          after: model-requests
                       automation: <level>
  read-handle-time   - runs collect-and-report: how long each kind of case
                       takes to handle on each channel, and how many
                       contacts a case needs before it closes, from the
                       cases closed in the window
                       owner: analytics           after: open-forecast
                       automation: <level>
  people-needed      - runs assessment: the requests turned into the
                       people each channel and interval needs to meet the
                       service level it promises, with the method and
                       every input written down
                       owner: staffing-planner
                       after: name-assumptions + read-handle-time
                       automation: <level>
  add-time-away      - system: the hours spent away from cases added by
                       interval, such as training, coaching, meetings and
                       the usual absence, read from the last periods for
                       the team as a whole
                       owner: staffing-planner    after: people-needed
                       automation: <level>
  set-against-team   - runs assessment: the people needed set beside the
                       hours the team has in each interval, from <your
                       scheduling system>, with each gap named by channel,
                       interval and date
                       owner: staffing-planner    after: add-time-away
                       automation: <level>
  set-out-options    - runs assessment: each way to meet a gap, such as
                       moving hours between channels, cover from the
                       provider the roster names, extra hours inside <your
                       working time policy>, positions asked of Human
                       resources or a service level proposed for change,
                       with what each gives and what it costs
                       owner: staffing-planner
                       after: set-against-team, when an interval is short,
                       and decide-gap when the head of support asks for
                       another                    automation: <level>
  review-forecast    - convenes approval: <your support operations lead
                       role> reviews the assumptions, the misses and the
                       gaps, and accepts the forecast or names the lines
                       to model again
                       owner: <your support operations lead role>
                       after: set-against-team, and set-out-options when
                       it ran                     by: <days>
                       automation: never
  decide-gap         - convenes decide-and-announce: <your head of support
                       role> chooses how each gap is met, or asks for
                       another option, and each choice then runs through
                       its own process with its own approvals
                       owner: <your head of support role>
                       after: review-forecast, when a gap is open
                       by: <days>                 automation: never
  publish-forecast   - system: the forecast and the people needed
                       published at a version to <your support operations
                       lead role>, the team leads and the schedule, with
                       every gap and the decision on it
                       owner: staffing-planner
                       after: review-forecast, and decide-gap when it ran
                       by: <the day>              automation: <level>
  record-learning    - convenes debrief: which assumptions missed and by
                       how much, which events came late or were missed,
                       and what the next period's forecast does
                       differently
                       owner: forecaster          after: publish-forecast
                       automation: <level>
run-scoped:
  inputs   - runs roll-call                     owner: staffing-planner
             every: <cadence>
             from: open-forecast       until: model-requests
handoffs:
  open-forecast -> read-history / gather-events / read-handle-time
    [forecast-frame]: the horizon, the channels, the intervals and the
    service levels at their version
  read-history -> mark-unusual-days [request-history]: the requests by
    channel, topic and interval, each figure with its source
  mark-unusual-days -> compare-last / model-requests [marked-history]: the
    history with each unusual day marked and its reason
  gather-events -> model-requests [events-ahead]: each release, campaign,
    price change and season with its date and source
  compare-last -> model-requests [forecast-misses]: last period's forecast
    beside what arrived, with the reason for each miss
  model-requests -> name-assumptions [request-forecast]: the requests by
    channel and interval, each assumption beside its number
  name-assumptions -> people-needed [tested-forecast]: the forecast with
    each deciding assumption and each unsourced rate named
  read-handle-time -> people-needed [handling-times]: the handling time by
    channel and topic, and the contacts each case needs
  people-needed -> add-time-away [people-per-interval]: the people each
    channel and interval needs, with the method and its inputs
  add-time-away -> set-against-team [hours-needed]: the hours needed by
    interval with the time away from cases added
  set-against-team -> review-forecast / set-out-options [need-against-team]:
    the need beside the hours the team has, and each gap by date
  set-out-options -> review-forecast [gap-options]: each option with what
    it gives the service levels and what it costs
  review-forecast -> decide-gap / publish-forecast [reviewed-forecast]:
    the forecast as the lead accepted it, with each open gap
  decide-gap -> publish-forecast [gap-decision]: the option chosen for
    each gap, by whom, and the process it now runs through
  publish-forecast -> record-learning [published-forecast]: the forecast at
    its version, and who it went to
deviations:
  mark-unusual-days -> read-history [window-too-unusual]: too much of the
    window is unusual to learn from, so a longer window is read and the
    forecaster agent says before modelling that the data is thin
  name-assumptions -> gather-events [unsourced-assumption-decides]: an
    assumption nobody can source decides the answer, so the event behind
    it is asked of its owner and the assumption goes to the review marked
    as unsourced if no answer comes
  set-against-team -> set-out-options [interval-short]: an interval needs
    more people than the team has, so the options for meeting it are set
    out before the review
  review-forecast -> model-requests [assumption-rejected]: the support
    operations lead does not accept an assumption, so the lines it
    touches are modelled again on the assumption the lead names, and both
    versions are kept
  decide-gap -> set-out-options [another-option]: the head of support asks
    for another option, so the options are set out again with the one
    asked for
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the support operations lead and
           the head of support>
  systems: <your support system> (read), <your phone system> (read),
           <your chat tool> (read), <your scheduling system> (write),
           <your release calendar> (read), the notification channel
           (write)
  data:    <your service level policy> <version>, <your planning
           calendar> <version>, <your working time policy> <version>,
           <your history window>, Marketing's campaign calendar
           <version>
policy:
  the forecast starts from the requests that actually arrived, and every
    number beyond them names its source and the assumption behind it
  a rate nobody can source is reported as unsourced, and no agent
    supplies a figure of its own in its place
  the people needed are worked out against the service levels in force
    at their version, and a forecast never lowers a service level by
    planning fewer people than it needs
  the forecast counts hours for the team as a whole, and it names no
    person and reports no named person's time
  the choice of how to meet a gap is a human decision, and extra hours,
    outside cover, new positions and a service level change each run
    through their own process with their own approvals
  a gap reaches <your head of support role> in the period it first
    shows, with the options and what each would cost
measures:
  cycle time: <days> from the forecast date to the forecast published
  on time: <target> share of forecasts published by <the day>
  volume: <channels> and <intervals per week>
  quality gate: every number in the forecast names its source, and last
                period's forecast sits beside what arrived with every miss
                above <threshold> explained
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

52 blanks to fill. Everything else is the process.

this process from: ref/sup/forecast-support-volume v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.