Change the Organization Structure

A leader proposes a change to how one or more teams are organized, such as merging two teams, splitting one, or moving reporting lines. Only the people the head of human resources (HR) names see the work before it is announced. The workforce-planner agent draws the structure as it stands and two or three options, each with its reporting lines and its cost, and lists the effect of each option on every role. Counsel says what notice and consultation the local rules require. The decision-coordinator agent puts the options to the executive sponsor, who chooses one, and then runs the decisions in which named leaders decide what happens to each person. Pay changes and roles that end go on to the processes that decide them. Each affected person hears from a manager first, the comms-manager agent runs the staff announcement, and the employee-record-keeper agent records every change on one date. The run closes when the new structure is in the record and in the chart read from it, and the date to review it is set.

The goals
  • Tell 100% of affected people before the announcement
  • Make the change effective within 8 weeks of the proposal
  • Keep the new structure's cost within the approved budget
  • Keep leaving from the changed teams under 5% in the next six months

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

18 activities from a leader proposes a change to how one or more teams are organized to the new structure is in the record on one date, and every affected person heard first, 4 of them gates a person has to sign.

Change the Organization Structurea leader proposes a change to how one or more teams are organized → the new structure is in the record on one date, and every affected person heard first
no option fits the budgetthe sponsor rejects every optionthe consultation changes the proposalno consultation is requireda decision about a person would changethe structurea leader proposes a change tohow one or more teams areorganized1Take in the Proposalthe reason, the teams in scope andthe date wanted2Name Who May See the Workthe named people who see theoptions before the decision3Draw the Current Structureteams, roles, reporting lines andcost today4Draw the Optionstwo or three structures, each withits reporting lines5Cost Each Optionthe labor cost of each, againstthe plan and the budget6List the Effect on Each Roleeach role kept, changed, moved,added or ended7Check the Consultation Rulesthe notice and consultation thelocal rules require8Put the Options to theSponsorthe options, their cost and theireffect on roles9Choose the Structurethe sponsor chooses, with anydissent recordeda person signs · never an agent10Consult Where the RulesRequire Itthe representatives consulted, andeach view answereda person signs · never an agent11Decide What Happens to EachPersoneach continuing role's holder,manager and teama person signs · never an agent12Hand On Pay Changes and EndedRoleseach one to the process thatdecides it13Plan the Announcementwho hears what, in what order andon what date14Tell Each Affected Personeach person hears from a managerfirsta person signs · never an agent15Announce the Changethe staff announcement, on theplanned date16Record the Change on One Dateevery new role, manager and team,on the effective date17Report on the Announcementthe questions raised, and how theywere answered18Review the Structure at ItsDatewhether the change did what it wasforthe new structure is in therecord on one date, and everyaffected person heard first
The roster this process needs
decision-coordinator 8 workforce-planner 4 comms-manager 4 executive sponsor 3 counsel 2 HR business partner 2 head of HR 1 finance lead 1 named leaders 1 managers 1 employee-record-keeper 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: change the organization structure   id: <team>/change-the-organization-structure   v1
from: ref/hr/change-the-organization-structure v1
owner: <who>                          effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
         more teams are organized, recorded in <your decision record>
         watch: record=<reorganization proposal>
                system=<your decision record>
                change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
             one run, and two changes that touch the same team are joined
             into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
      role's holder decided by a named leader, every affected person told
      by a manager before the announcement, and every change recorded in
      <your HR system> on one effective date
phases:
  take-in-proposal    - human: the change proposed, the reason for it,
                        the teams in scope, the date wanted and the
                        executive sponsor who will choose
                        owner: decision-coordinator   after: trigger
                        automation: <level>
  name-access         - human: the named people who may see the options,
                        the costs and the effects before the
                        announcement, recorded with the date each one was
                        added
                        owner: <your head of HR role>
                        after: take-in-proposal    automation: <level>
  draw-current        - runs collect-and-report: the teams in scope as
                        they stand today, with each role, its level, its
                        reporting line and its cost, read from
                        <your HR system> and the workforce plan
                        owner: workforce-planner   after: name-access
                        automation: <level>
  draw-options        - human: two or three structures that meet the
                        reason for the change, each with its teams, its
                        roles and its reporting lines
                        owner: workforce-planner   after: draw-current
                        automation: <level>
  cost-options        - runs assessment: the labor cost of each option
                        for the year and for a full year, set beside the
                        workforce plan and the budget, with the one-time
                        cost of making the change
                        owner: workforce-planner   after: draw-options
                        automation: <level>
  list-effects        - runs assessment: each role in scope marked as
                        kept, changed, moved to a new manager, added or
                        ended under each option, read from the work the
                        role does
                        owner: workforce-planner   after: cost-options
                        automation: <level>
  check-consultation  - runs assessment: whether
                        <your jurisdiction's rules on consultation>
                        require notice to employees or consultation with
                        their representatives before any decision about a
                        person, and the dates they set
                        owner: <your counsel role>
                        after: list-effects        by: <days>
                        automation: <level>
  put-options         - convenes briefing: the options put to the
                        executive sponsor with their cost, their effect on
                        roles and the consultation each one needs
                        owner: decision-coordinator
                        after: check-consultation  automation: <level>
  choose-structure    - convenes decide-and-announce: the executive
                        sponsor chooses one structure, and the decision is
                        recorded with who disagreed and why
                        owner: <your executive sponsor role>
                        after: put-options         by: <date>
                        automation: never
  consult             - human: the employee representatives informed and
                        consulted on the chosen structure for the time
                        <your jurisdiction's rules on consultation> set,
                        and each view they gave answered in writing
                        owner: <your HR business partner role>
                        after: choose-structure, when the rules require
                        consultation               automation: never
  decide-people       - convenes decide-and-announce: for each continuing
                        role in scope, the named leader decides who holds
                        it, the manager and the team, and each decision is
                        recorded with the leader's name
                        owner: <your named leader role>
                        after: consult, or choose-structure when no
                        consultation is required   automation: never
  hand-on-changes     - human: each pay change sent to
                        ref/hr/change-an-employees-pay, each new role with
                        more candidates than places to
                        ref/hr/move-an-employee-to-a-new-role, and each
                        role that ends to ref/hr/run-a-layoff
                        owner: decision-coordinator   after: decide-people
                        automation: <level>
  plan-announcement   - human: who hears what, from whom, in what order
                        and on what date, with the affected people first
                        and the staff announcement after them
                        owner: comms-manager       after: hand-on-changes
                        automation: <level>
  tell-people         - human: each affected person told in a
                        conversation with a manager what changes for them,
                        before the staff announcement and on the planned
                        day
                        owner: <your manager role>
                        after: plan-announcement   automation: never
  announce            - human: the staff announcement issued on the
                        planned date, in the version every audience
                        shares, with the effective date and where to ask
                        questions
                        owner: comms-manager       after: tell-people
                        automation: <level>
  record-change       - system: every new role, manager and team in scope
                        applied in <your HR system> on the effective date,
                        so the organization chart read from the record
                        shows the new structure that day, and each change
                        passed to payroll, benefits and access
                        owner: employee-record-keeper   after: announce
                        automation: <level>
  report-announcement - runs collect-and-report: the questions people
                        raised, how each one was answered, and what the
                        announcement got wrong or left out
                        owner: comms-manager       after: record-change
                        automation: <level>
  review-structure    - convenes debrief: on <the review date>, whether
                        the change did what it was for, set against the
                        reason recorded at the start
                        owner: decision-coordinator
                        after: report-announcement automation: <level>
run-scoped:
  timeline    - runs roll-call               owner: decision-coordinator
                every: <cadence>
                from: take-in-proposal  until: announce
  options-log - runs collect-and-report      owner: workforce-planner
                from: draw-options      until: run close
handoffs:
  take-in-proposal -> name-access [reorganization-proposal]: the change,
    its reason, the teams in scope, the date wanted and the sponsor
  name-access -> draw-current [access-list]: the named people who may see
    the work, with the date each one was added
  draw-current -> draw-options [current-structure]: each role in scope
    with its level, its reporting line and its cost
  draw-options -> cost-options [structure-options]: two or three
    structures with their teams, roles and reporting lines
  cost-options -> list-effects [option-costs]: the cost of each option
    against the plan and the budget, and the one-time cost of the change
  list-effects -> check-consultation [role-effects]: the effect on each
    role under each option
  check-consultation -> put-options [consultation-reading]: the notice and
    consultation each option needs, with the dates and the rule behind
    each one
  put-options -> choose-structure [options-briefed]: the options as the
    sponsor saw them
  choose-structure -> consult / decide-people [chosen-structure]: the
    structure chosen, the conditions on it, and who disagreed and why
  consult -> decide-people [consultation-record]: each view the
    representatives gave, and the answer to it
  decide-people -> hand-on-changes [person-decisions]: each continuing
    role's holder, manager and team, with the leader who decided
  hand-on-changes -> plan-announcement [changes-handed-on]: each pay
    change, contested role and ended role, with the run that now holds it
  plan-announcement -> tell-people [announcement-plan]: who hears what,
    from whom, in what order and when
  tell-people -> announce [people-told]: each affected person told, by
    whom and when
  announce -> record-change [announcement-issued]: the announcement as
    issued, and the effective date
  record-change -> report-announcement [structure-recorded]: every change
    applied on the effective date, and the chart that shows it
  report-announcement -> review-structure [announcement-report]: the
    questions raised, the answers, and what to fix
deviations:
  cost-options -> draw-options [no-option-fits-budget]: no option fits the
    plan and the budget, so the options are drawn again, or the sponsor
    asks for a revision of the plan under ref/hr/plan-the-workforce
  choose-structure -> draw-options [every-option-rejected]: the sponsor
    rejects every option, so new options are drawn and the rejected ones
    are kept with the reason
  consult -> draw-options [consultation-changes-proposal]: the
    consultation shows a better structure or a cost nobody counted, so
    the options are drawn again and the sponsor chooses again
  decide-people -> choose-structure [person-decision-changes-structure]:
    a decision about a person would change the chosen structure, so the
    sponsor decides the structure again before any other decision about a
    person is final
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the executive sponsor, the head of
           HR, the finance lead, counsel, the HR business partners, the
           named leaders and the managers of the affected people>
  systems: <your HR system> (write), the workforce plan (read),
           <your decision record> (write),
           <your financial planning system> (read), the staff
           communication channel (write), the notification channel
           (write)
  data:    the workforce plan <version>, the labor cost budget <version>,
           <your job framework> <version>,
           <your jurisdiction's rules on consultation>, the announcement
           at its version
policy:
  only the named people on the access list see the options, the costs
    and the effects before the announcement
  the options and their effects are drawn by role from the work each role
    does, and no step weighs a protected characteristic
  an agent never decides the structure or what happens to a person, and
    each decision is recorded with the name of who made it
  no decision about a person is final before the consultation ends, where
    <your jurisdiction's rules on consultation> require one
  a role that ends goes to ref/hr/run-a-layoff, and the staff
    announcement waits until the people whose roles end have been told
    under that process
  a pay change goes through ref/hr/change-an-employees-pay, and the
    reorganization never sets one by itself
  each affected person hears from a manager before the staff
    announcement
  every change takes effect on one date, and the record, the chart and
    the announcement all carry that date
measures:
  cycle time: <weeks> from the proposal to the effective date
  told first: <target> share of affected people told by a manager before
              the announcement
  volume: <changes per year>
  quality gate: every affected role has a recorded decision with the name
                of who made it, and the record matches the chosen
                structure on the effective date
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

343 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: change the organization structure   id: <team>/change-the-organization-structure   v1
from: ref/hr/change-the-organization-structure v1
owner: <who>                          effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
         more teams are organized, recorded in <your decision record>
         watch: record=<reorganization proposal>
                system=<your decision record>
                change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
             one run, and two changes that touch the same team are joined
             into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
      role's holder decided by a named leader, every affected person told
      by a manager before the announcement, and every change recorded in
      <your HR system> on one effective date
phases:
  take-in-proposal    - human: the change proposed, the reason for it,
                        the teams in scope, the date wanted and the
                        executive sponsor who will choose
                        owner: decision-coordinator   after: trigger
                        automation: <level>
  name-access         - human: the named people who may see the options,
                        the costs and the effects before the
                        announcement, recorded with the date each one was
                        added
                        owner: <your head of HR role>
                        after: take-in-proposal    automation: <level>
  draw-current        - runs collect-and-report: the teams in scope as
                        they stand today, with each role, its level, its
                        reporting line and its cost, read from
                        <your HR system> and the workforce plan
                        owner: workforce-planner   after: name-access
                        automation: <level>
  draw-options        - human: two or three structures that meet the
                        reason for the change, each with its teams, its
                        roles and its reporting lines
                        owner: workforce-planner   after: draw-current
                        automation: <level>
  cost-options        - runs assessment: the labor cost of each option
                        for the year and for a full year, set beside the
                        workforce plan and the budget, with the one-time
                        cost of making the change
                        owner: workforce-planner   after: draw-options
                        automation: <level>
  list-effects        - runs assessment: each role in scope marked as
                        kept, changed, moved to a new manager, added or
                        ended under each option, read from the work the
                        role does
                        owner: workforce-planner   after: cost-options
                        automation: <level>
  check-consultation  - runs assessment: whether
                        <your jurisdiction's rules on consultation>
                        require notice to employees or consultation with
                        their representatives before any decision about a
                        person, and the dates they set
                        owner: <your counsel role>
                        after: list-effects        by: <days>
                        automation: <level>
  put-options         - convenes briefing: the options put to the
                        executive sponsor with their cost, their effect on
                        roles and the consultation each one needs
                        owner: decision-coordinator
                        after: check-consultation  automation: <level>
  choose-structure    - convenes decide-and-announce: the executive
                        sponsor chooses one structure, and the decision is
                        recorded with who disagreed and why
                        owner: <your executive sponsor role>
                        after: put-options         by: <date>
                        automation: never
  consult             - human: the employee representatives informed and
                        consulted on the chosen structure for the time
                        <your jurisdiction's rules on consultation> set,
                        and each view they gave answered in writing
                        owner: <your HR business partner role>
                        after: choose-structure, when the rules require
                        consultation               automation: never
  decide-people       - convenes decide-and-announce: for each continuing
                        role in scope, the named leader decides who holds
                        it, the manager and the team, and each decision is
                        recorded with the leader's name
                        owner: <your named leader role>
                        after: consult, or choose-structure when no
                        consultation is required   automation: never
  hand-on-changes     - human: each pay change sent to
                        ref/hr/change-an-employees-pay, each new role with
                        more candidates than places to
                        ref/hr/move-an-employee-to-a-new-role, and each
                        role that ends to ref/hr/run-a-layoff
                        owner: decision-coordinator   after: decide-people
                        automation: <level>
  plan-announcement   - human: who hears what, from whom, in what order
                        and on what date, with the affected people first
                        and the staff announcement after them
                        owner: comms-manager       after: hand-on-changes
                        automation: <level>
  tell-people         - human: each affected person told in a
                        conversation with a manager what changes for them,
                        before the staff announcement and on the planned
                        day
                        owner: <your manager role>
                        after: plan-announcement   automation: never
  announce            - human: the staff announcement issued on the
                        planned date, in the version every audience
                        shares, with the effective date and where to ask
                        questions
                        owner: comms-manager       after: tell-people
                        automation: <level>
  record-change       - system: every new role, manager and team in scope
                        applied in <your HR system> on the effective date,
                        so the organization chart read from the record
                        shows the new structure that day, and each change
                        passed to payroll, benefits and access
                        owner: employee-record-keeper   after: announce
                        automation: <level>
  report-announcement - runs collect-and-report: the questions people
                        raised, how each one was answered, and what the
                        announcement got wrong or left out
                        owner: comms-manager       after: record-change
                        automation: <level>
  review-structure    - convenes debrief: on <the review date>, whether
                        the change did what it was for, set against the
                        reason recorded at the start
                        owner: decision-coordinator
                        after: report-announcement automation: <level>
run-scoped:
  timeline    - runs roll-call               owner: decision-coordinator
                every: <cadence>
                from: take-in-proposal  until: announce
  options-log - runs collect-and-report      owner: workforce-planner
                from: draw-options      until: run close
handoffs:
  take-in-proposal -> name-access [reorganization-proposal]: the change,
    its reason, the teams in scope, the date wanted and the sponsor
  name-access -> draw-current [access-list]: the named people who may see
    the work, with the date each one was added
  draw-current -> draw-options [current-structure]: each role in scope
    with its level, its reporting line and its cost
  draw-options -> cost-options [structure-options]: two or three
    structures with their teams, roles and reporting lines
  cost-options -> list-effects [option-costs]: the cost of each option
    against the plan and the budget, and the one-time cost of the change
  list-effects -> check-consultation [role-effects]: the effect on each
    role under each option
  check-consultation -> put-options [consultation-reading]: the notice and
    consultation each option needs, with the dates and the rule behind
    each one
  put-options -> choose-structure [options-briefed]: the options as the
    sponsor saw them
  choose-structure -> consult / decide-people [chosen-structure]: the
    structure chosen, the conditions on it, and who disagreed and why
  consult -> decide-people [consultation-record]: each view the
    representatives gave, and the answer to it
  decide-people -> hand-on-changes [person-decisions]: each continuing
    role's holder, manager and team, with the leader who decided
  hand-on-changes -> plan-announcement [changes-handed-on]: each pay
    change, contested role and ended role, with the run that now holds it
  plan-announcement -> tell-people [announcement-plan]: who hears what,
    from whom, in what order and when
  tell-people -> announce [people-told]: each affected person told, by
    whom and when
  announce -> record-change [announcement-issued]: the announcement as
    issued, and the effective date
  record-change -> report-announcement [structure-recorded]: every change
    applied on the effective date, and the chart that shows it
  report-announcement -> review-structure [announcement-report]: the
    questions raised, the answers, and what to fix
deviations:
  cost-options -> draw-options [no-option-fits-budget]: no option fits the
    plan and the budget, so the options are drawn again, or the sponsor
    asks for a revision of the plan under ref/hr/plan-the-workforce
  choose-structure -> draw-options [every-option-rejected]: the sponsor
    rejects every option, so new options are drawn and the rejected ones
    are kept with the reason
  consult -> draw-options [consultation-changes-proposal]: the
    consultation shows a better structure or a cost nobody counted, so
    the options are drawn again and the sponsor chooses again
  decide-people -> choose-structure [person-decision-changes-structure]:
    a decision about a person would change the chosen structure, so the
    sponsor decides the structure again before any other decision about a
    person is final
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the executive sponsor, the head of
           HR, the finance lead, counsel, the HR business partners, the
           named leaders and the managers of the affected people>
  systems: <your HR system> (write), the workforce plan (read),
           <your decision record> (write),
           <your financial planning system> (read), the staff
           communication channel (write), the notification channel
           (write)
  data:    the workforce plan <version>, the labor cost budget <version>,
           <your job framework> <version>,
           <your jurisdiction's rules on consultation>, the announcement
           at its version
policy:
  only the named people on the access list see the options, the costs
    and the effects before the announcement
  the options and their effects are drawn by role from the work each role
    does, and no step weighs a protected characteristic
  an agent never decides the structure or what happens to a person, and
    each decision is recorded with the name of who made it
  no decision about a person is final before the consultation ends, where
    <your jurisdiction's rules on consultation> require one
  a role that ends goes to ref/hr/run-a-layoff, and the staff
    announcement waits until the people whose roles end have been told
    under that process
  a pay change goes through ref/hr/change-an-employees-pay, and the
    reorganization never sets one by itself
  each affected person hears from a manager before the staff
    announcement
  every change takes effect on one date, and the record, the chart and
    the announcement all carry that date
measures:
  cycle time: <weeks> from the proposal to the effective date
  told first: <target> share of affected people told by a manager before
              the announcement
  volume: <changes per year>
  quality gate: every affected role has a recorded decision with the name
                of who made it, and the record matches the chosen
                structure on the effective date
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

398 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: change the organization structure   id: <team>/change-the-organization-structure   v1
from: ref/hr/change-the-organization-structure v1
owner: <who>                          effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
         more teams are organized, recorded in <your decision record>
         watch: record=<reorganization proposal>
                system=<your decision record>
                change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
             one run, and two changes that touch the same team are joined
             into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
      role's holder decided by a named leader, every affected person told
      by a manager before the announcement, and every change recorded in
      <your HR system> on one effective date
phases:
  take-in-proposal    - human: the change proposed, the reason for it,
                        the teams in scope, the date wanted and the
                        executive sponsor who will choose
                        owner: decision-coordinator   after: trigger
                        automation: <level>
  name-access         - human: the named people who may see the options,
                        the costs and the effects before the
                        announcement, recorded with the date each one was
                        added
                        owner: <your head of HR role>
                        after: take-in-proposal    automation: <level>
  draw-current        - runs collect-and-report: the teams in scope as
                        they stand today, with each role, its level, its
                        reporting line and its cost, read from
                        <your HR system> and the workforce plan
                        owner: workforce-planner   after: name-access
                        automation: <level>
  draw-options        - human: two or three structures that meet the
                        reason for the change, each with its teams, its
                        roles and its reporting lines
                        owner: workforce-planner   after: draw-current
                        automation: <level>
  cost-options        - runs assessment: the labor cost of each option
                        for the year and for a full year, set beside the
                        workforce plan and the budget, with the one-time
                        cost of making the change
                        owner: workforce-planner   after: draw-options
                        automation: <level>
  list-effects        - runs assessment: each role in scope marked as
                        kept, changed, moved to a new manager, added or
                        ended under each option, read from the work the
                        role does
                        owner: workforce-planner   after: cost-options
                        automation: <level>
  check-consultation  - runs assessment: whether
                        <your jurisdiction's rules on consultation>
                        require notice to employees or consultation with
                        their representatives before any decision about a
                        person, and the dates they set
                        owner: <your counsel role>
                        after: list-effects        by: <days>
                        automation: <level>
  put-options         - convenes briefing: the options put to the
                        executive sponsor with their cost, their effect on
                        roles and the consultation each one needs
                        owner: decision-coordinator
                        after: check-consultation  automation: <level>
  choose-structure    - convenes decide-and-announce: the executive
                        sponsor chooses one structure, and the decision is
                        recorded with who disagreed and why
                        owner: <your executive sponsor role>
                        after: put-options         by: <date>
                        automation: never
  consult             - human: the employee representatives informed and
                        consulted on the chosen structure for the time
                        <your jurisdiction's rules on consultation> set,
                        and each view they gave answered in writing
                        owner: <your HR business partner role>
                        after: choose-structure, when the rules require
                        consultation               automation: never
  decide-people       - convenes decide-and-announce: for each continuing
                        role in scope, the named leader decides who holds
                        it, the manager and the team, and each decision is
                        recorded with the leader's name
                        owner: <your named leader role>
                        after: consult, or choose-structure when no
                        consultation is required   automation: never
  hand-on-changes     - human: each pay change sent to
                        ref/hr/change-an-employees-pay, each new role with
                        more candidates than places to
                        ref/hr/move-an-employee-to-a-new-role, and each
                        role that ends to ref/hr/run-a-layoff
                        owner: decision-coordinator   after: decide-people
                        automation: <level>
  plan-announcement   - human: who hears what, from whom, in what order
                        and on what date, with the affected people first
                        and the staff announcement after them
                        owner: comms-manager       after: hand-on-changes
                        automation: <level>
  tell-people         - human: each affected person told in a
                        conversation with a manager what changes for them,
                        before the staff announcement and on the planned
                        day
                        owner: <your manager role>
                        after: plan-announcement   automation: never
  announce            - human: the staff announcement issued on the
                        planned date, in the version every audience
                        shares, with the effective date and where to ask
                        questions
                        owner: comms-manager       after: tell-people
                        automation: <level>
  record-change       - system: every new role, manager and team in scope
                        applied in <your HR system> on the effective date,
                        so the organization chart read from the record
                        shows the new structure that day, and each change
                        passed to payroll, benefits and access
                        owner: employee-record-keeper   after: announce
                        automation: <level>
  report-announcement - runs collect-and-report: the questions people
                        raised, how each one was answered, and what the
                        announcement got wrong or left out
                        owner: comms-manager       after: record-change
                        automation: <level>
  review-structure    - convenes debrief: on <the review date>, whether
                        the change did what it was for, set against the
                        reason recorded at the start
                        owner: decision-coordinator
                        after: report-announcement automation: <level>
run-scoped:
  timeline    - runs roll-call               owner: decision-coordinator
                every: <cadence>
                from: take-in-proposal  until: announce
  options-log - runs collect-and-report      owner: workforce-planner
                from: draw-options      until: run close
handoffs:
  take-in-proposal -> name-access [reorganization-proposal]: the change,
    its reason, the teams in scope, the date wanted and the sponsor
  name-access -> draw-current [access-list]: the named people who may see
    the work, with the date each one was added
  draw-current -> draw-options [current-structure]: each role in scope
    with its level, its reporting line and its cost
  draw-options -> cost-options [structure-options]: two or three
    structures with their teams, roles and reporting lines
  cost-options -> list-effects [option-costs]: the cost of each option
    against the plan and the budget, and the one-time cost of the change
  list-effects -> check-consultation [role-effects]: the effect on each
    role under each option
  check-consultation -> put-options [consultation-reading]: the notice and
    consultation each option needs, with the dates and the rule behind
    each one
  put-options -> choose-structure [options-briefed]: the options as the
    sponsor saw them
  choose-structure -> consult / decide-people [chosen-structure]: the
    structure chosen, the conditions on it, and who disagreed and why
  consult -> decide-people [consultation-record]: each view the
    representatives gave, and the answer to it
  decide-people -> hand-on-changes [person-decisions]: each continuing
    role's holder, manager and team, with the leader who decided
  hand-on-changes -> plan-announcement [changes-handed-on]: each pay
    change, contested role and ended role, with the run that now holds it
  plan-announcement -> tell-people [announcement-plan]: who hears what,
    from whom, in what order and when
  tell-people -> announce [people-told]: each affected person told, by
    whom and when
  announce -> record-change [announcement-issued]: the announcement as
    issued, and the effective date
  record-change -> report-announcement [structure-recorded]: every change
    applied on the effective date, and the chart that shows it
  report-announcement -> review-structure [announcement-report]: the
    questions raised, the answers, and what to fix
deviations:
  cost-options -> draw-options [no-option-fits-budget]: no option fits the
    plan and the budget, so the options are drawn again, or the sponsor
    asks for a revision of the plan under ref/hr/plan-the-workforce
  choose-structure -> draw-options [every-option-rejected]: the sponsor
    rejects every option, so new options are drawn and the rejected ones
    are kept with the reason
  consult -> draw-options [consultation-changes-proposal]: the
    consultation shows a better structure or a cost nobody counted, so
    the options are drawn again and the sponsor chooses again
  decide-people -> choose-structure [person-decision-changes-structure]:
    a decision about a person would change the chosen structure, so the
    sponsor decides the structure again before any other decision about a
    person is final
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the executive sponsor, the head of
           HR, the finance lead, counsel, the HR business partners, the
           named leaders and the managers of the affected people>
  systems: <your HR system> (write), the workforce plan (read),
           <your decision record> (write),
           <your financial planning system> (read), the staff
           communication channel (write), the notification channel
           (write)
  data:    the workforce plan <version>, the labor cost budget <version>,
           <your job framework> <version>,
           <your jurisdiction's rules on consultation>, the announcement
           at its version
policy:
  only the named people on the access list see the options, the costs
    and the effects before the announcement
  the options and their effects are drawn by role from the work each role
    does, and no step weighs a protected characteristic
  an agent never decides the structure or what happens to a person, and
    each decision is recorded with the name of who made it
  no decision about a person is final before the consultation ends, where
    <your jurisdiction's rules on consultation> require one
  a role that ends goes to ref/hr/run-a-layoff, and the staff
    announcement waits until the people whose roles end have been told
    under that process
  a pay change goes through ref/hr/change-an-employees-pay, and the
    reorganization never sets one by itself
  each affected person hears from a manager before the staff
    announcement
  every change takes effect on one date, and the record, the chart and
    the announcement all carry that date
measures:
  cycle time: <weeks> from the proposal to the effective date
  told first: <target> share of affected people told by a manager before
              the announcement
  volume: <changes per year>
  quality gate: every affected role has a recorded decision with the name
                of who made it, and the record matches the chosen
                structure on the effective date
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

403 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: change the organization structure   id: <team>/change-the-organization-structure   v1
from: ref/hr/change-the-organization-structure v1
owner: <who>                          effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
         more teams are organized, recorded in <your decision record>
         watch: record=<reorganization proposal>
                system=<your decision record>
                change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
             one run, and two changes that touch the same team are joined
             into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
      role's holder decided by a named leader, every affected person told
      by a manager before the announcement, and every change recorded in
      <your HR system> on one effective date
phases:
  take-in-proposal    - human: the change proposed, the reason for it,
                        the teams in scope, the date wanted and the
                        executive sponsor who will choose
                        owner: decision-coordinator   after: trigger
                        automation: <level>
  name-access         - human: the named people who may see the options,
                        the costs and the effects before the
                        announcement, recorded with the date each one was
                        added
                        owner: <your head of HR role>
                        after: take-in-proposal    automation: <level>
  draw-current        - runs collect-and-report: the teams in scope as
                        they stand today, with each role, its level, its
                        reporting line and its cost, read from
                        <your HR system> and the workforce plan
                        owner: workforce-planner   after: name-access
                        automation: <level>
  draw-options        - human: two or three structures that meet the
                        reason for the change, each with its teams, its
                        roles and its reporting lines
                        owner: workforce-planner   after: draw-current
                        automation: <level>
  cost-options        - runs assessment: the labor cost of each option
                        for the year and for a full year, set beside the
                        workforce plan and the budget, with the one-time
                        cost of making the change
                        owner: workforce-planner   after: draw-options
                        automation: <level>
  list-effects        - runs assessment: each role in scope marked as
                        kept, changed, moved to a new manager, added or
                        ended under each option, read from the work the
                        role does
                        owner: workforce-planner   after: cost-options
                        automation: <level>
  check-consultation  - runs assessment: whether
                        <your jurisdiction's rules on consultation>
                        require notice to employees or consultation with
                        their representatives before any decision about a
                        person, and the dates they set
                        owner: <your counsel role>
                        after: list-effects        by: <days>
                        automation: <level>
  put-options         - convenes briefing: the options put to the
                        executive sponsor with their cost, their effect on
                        roles and the consultation each one needs
                        owner: decision-coordinator
                        after: check-consultation  automation: <level>
  choose-structure    - convenes decide-and-announce: the executive
                        sponsor chooses one structure, and the decision is
                        recorded with who disagreed and why
                        owner: <your executive sponsor role>
                        after: put-options         by: <date>
                        automation: never
  consult             - human: the employee representatives informed and
                        consulted on the chosen structure for the time
                        <your jurisdiction's rules on consultation> set,
                        and each view they gave answered in writing
                        owner: <your HR business partner role>
                        after: choose-structure, when the rules require
                        consultation               automation: never
  decide-people       - convenes decide-and-announce: for each continuing
                        role in scope, the named leader decides who holds
                        it, the manager and the team, and each decision is
                        recorded with the leader's name
                        owner: <your named leader role>
                        after: consult, or choose-structure when no
                        consultation is required   automation: never
  hand-on-changes     - human: each pay change sent to
                        ref/hr/change-an-employees-pay, each new role with
                        more candidates than places to
                        ref/hr/move-an-employee-to-a-new-role, and each
                        role that ends to ref/hr/run-a-layoff
                        owner: decision-coordinator   after: decide-people
                        automation: <level>
  plan-announcement   - human: who hears what, from whom, in what order
                        and on what date, with the affected people first
                        and the staff announcement after them
                        owner: comms-manager       after: hand-on-changes
                        automation: <level>
  tell-people         - human: each affected person told in a
                        conversation with a manager what changes for them,
                        before the staff announcement and on the planned
                        day
                        owner: <your manager role>
                        after: plan-announcement   automation: never
  announce            - human: the staff announcement issued on the
                        planned date, in the version every audience
                        shares, with the effective date and where to ask
                        questions
                        owner: comms-manager       after: tell-people
                        automation: <level>
  record-change       - system: every new role, manager and team in scope
                        applied in <your HR system> on the effective date,
                        so the organization chart read from the record
                        shows the new structure that day, and each change
                        passed to payroll, benefits and access
                        owner: employee-record-keeper   after: announce
                        automation: <level>
  report-announcement - runs collect-and-report: the questions people
                        raised, how each one was answered, and what the
                        announcement got wrong or left out
                        owner: comms-manager       after: record-change
                        automation: <level>
  review-structure    - convenes debrief: on <the review date>, whether
                        the change did what it was for, set against the
                        reason recorded at the start
                        owner: decision-coordinator
                        after: report-announcement automation: <level>
run-scoped:
  timeline    - runs roll-call               owner: decision-coordinator
                every: <cadence>
                from: take-in-proposal  until: announce
  options-log - runs collect-and-report      owner: workforce-planner
                from: draw-options      until: run close
handoffs:
  take-in-proposal -> name-access [reorganization-proposal]: the change,
    its reason, the teams in scope, the date wanted and the sponsor
  name-access -> draw-current [access-list]: the named people who may see
    the work, with the date each one was added
  draw-current -> draw-options [current-structure]: each role in scope
    with its level, its reporting line and its cost
  draw-options -> cost-options [structure-options]: two or three
    structures with their teams, roles and reporting lines
  cost-options -> list-effects [option-costs]: the cost of each option
    against the plan and the budget, and the one-time cost of the change
  list-effects -> check-consultation [role-effects]: the effect on each
    role under each option
  check-consultation -> put-options [consultation-reading]: the notice and
    consultation each option needs, with the dates and the rule behind
    each one
  put-options -> choose-structure [options-briefed]: the options as the
    sponsor saw them
  choose-structure -> consult / decide-people [chosen-structure]: the
    structure chosen, the conditions on it, and who disagreed and why
  consult -> decide-people [consultation-record]: each view the
    representatives gave, and the answer to it
  decide-people -> hand-on-changes [person-decisions]: each continuing
    role's holder, manager and team, with the leader who decided
  hand-on-changes -> plan-announcement [changes-handed-on]: each pay
    change, contested role and ended role, with the run that now holds it
  plan-announcement -> tell-people [announcement-plan]: who hears what,
    from whom, in what order and when
  tell-people -> announce [people-told]: each affected person told, by
    whom and when
  announce -> record-change [announcement-issued]: the announcement as
    issued, and the effective date
  record-change -> report-announcement [structure-recorded]: every change
    applied on the effective date, and the chart that shows it
  report-announcement -> review-structure [announcement-report]: the
    questions raised, the answers, and what to fix
deviations:
  cost-options -> draw-options [no-option-fits-budget]: no option fits the
    plan and the budget, so the options are drawn again, or the sponsor
    asks for a revision of the plan under ref/hr/plan-the-workforce
  choose-structure -> draw-options [every-option-rejected]: the sponsor
    rejects every option, so new options are drawn and the rejected ones
    are kept with the reason
  consult -> draw-options [consultation-changes-proposal]: the
    consultation shows a better structure or a cost nobody counted, so
    the options are drawn again and the sponsor chooses again
  decide-people -> choose-structure [person-decision-changes-structure]:
    a decision about a person would change the chosen structure, so the
    sponsor decides the structure again before any other decision about a
    person is final
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the executive sponsor, the head of
           HR, the finance lead, counsel, the HR business partners, the
           named leaders and the managers of the affected people>
  systems: <your HR system> (write), the workforce plan (read),
           <your decision record> (write),
           <your financial planning system> (read), the staff
           communication channel (write), the notification channel
           (write)
  data:    the workforce plan <version>, the labor cost budget <version>,
           <your job framework> <version>,
           <your jurisdiction's rules on consultation>, the announcement
           at its version
policy:
  only the named people on the access list see the options, the costs
    and the effects before the announcement
  the options and their effects are drawn by role from the work each role
    does, and no step weighs a protected characteristic
  an agent never decides the structure or what happens to a person, and
    each decision is recorded with the name of who made it
  no decision about a person is final before the consultation ends, where
    <your jurisdiction's rules on consultation> require one
  a role that ends goes to ref/hr/run-a-layoff, and the staff
    announcement waits until the people whose roles end have been told
    under that process
  a pay change goes through ref/hr/change-an-employees-pay, and the
    reorganization never sets one by itself
  each affected person hears from a manager before the staff
    announcement
  every change takes effect on one date, and the record, the chart and
    the announcement all carry that date
measures:
  cycle time: <weeks> from the proposal to the effective date
  told first: <target> share of affected people told by a manager before
              the announcement
  volume: <changes per year>
  quality gate: every affected role has a recorded decision with the name
                of who made it, and the record matches the chosen
                structure on the effective date
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

394 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: change the organization structure   id: <team>/change-the-organization-structure   v1
from: ref/hr/change-the-organization-structure v1
owner: <who>                          effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
         more teams are organized, recorded in <your decision record>
         watch: record=<reorganization proposal>
                system=<your decision record>
                change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
             one run, and two changes that touch the same team are joined
             into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
      role's holder decided by a named leader, every affected person told
      by a manager before the announcement, and every change recorded in
      <your HR system> on one effective date
phases:
  take-in-proposal    - human: the change proposed, the reason for it,
                        the teams in scope, the date wanted and the
                        executive sponsor who will choose
                        owner: decision-coordinator   after: trigger
                        automation: <level>
  name-access         - human: the named people who may see the options,
                        the costs and the effects before the
                        announcement, recorded with the date each one was
                        added
                        owner: <your head of HR role>
                        after: take-in-proposal    automation: <level>
  draw-current        - runs collect-and-report: the teams in scope as
                        they stand today, with each role, its level, its
                        reporting line and its cost, read from
                        <your HR system> and the workforce plan
                        owner: workforce-planner   after: name-access
                        automation: <level>
  draw-options        - human: two or three structures that meet the
                        reason for the change, each with its teams, its
                        roles and its reporting lines
                        owner: workforce-planner   after: draw-current
                        automation: <level>
  cost-options        - runs assessment: the labor cost of each option
                        for the year and for a full year, set beside the
                        workforce plan and the budget, with the one-time
                        cost of making the change
                        owner: workforce-planner   after: draw-options
                        automation: <level>
  list-effects        - runs assessment: each role in scope marked as
                        kept, changed, moved to a new manager, added or
                        ended under each option, read from the work the
                        role does
                        owner: workforce-planner   after: cost-options
                        automation: <level>
  check-consultation  - runs assessment: whether
                        <your jurisdiction's rules on consultation>
                        require notice to employees or consultation with
                        their representatives before any decision about a
                        person, and the dates they set
                        owner: <your counsel role>
                        after: list-effects        by: <days>
                        automation: <level>
  put-options         - convenes briefing: the options put to the
                        executive sponsor with their cost, their effect on
                        roles and the consultation each one needs
                        owner: decision-coordinator
                        after: check-consultation  automation: <level>
  choose-structure    - convenes decide-and-announce: the executive
                        sponsor chooses one structure, and the decision is
                        recorded with who disagreed and why
                        owner: <your executive sponsor role>
                        after: put-options         by: <date>
                        automation: never
  consult             - human: the employee representatives informed and
                        consulted on the chosen structure for the time
                        <your jurisdiction's rules on consultation> set,
                        and each view they gave answered in writing
                        owner: <your HR business partner role>
                        after: choose-structure, when the rules require
                        consultation               automation: never
  decide-people       - convenes decide-and-announce: for each continuing
                        role in scope, the named leader decides who holds
                        it, the manager and the team, and each decision is
                        recorded with the leader's name
                        owner: <your named leader role>
                        after: consult, or choose-structure when no
                        consultation is required   automation: never
  hand-on-changes     - human: each pay change sent to
                        ref/hr/change-an-employees-pay, each new role with
                        more candidates than places to
                        ref/hr/move-an-employee-to-a-new-role, and each
                        role that ends to ref/hr/run-a-layoff
                        owner: decision-coordinator   after: decide-people
                        automation: <level>
  plan-announcement   - human: who hears what, from whom, in what order
                        and on what date, with the affected people first
                        and the staff announcement after them
                        owner: comms-manager       after: hand-on-changes
                        automation: <level>
  tell-people         - human: each affected person told in a
                        conversation with a manager what changes for them,
                        before the staff announcement and on the planned
                        day
                        owner: <your manager role>
                        after: plan-announcement   automation: never
  announce            - human: the staff announcement issued on the
                        planned date, in the version every audience
                        shares, with the effective date and where to ask
                        questions
                        owner: comms-manager       after: tell-people
                        automation: <level>
  record-change       - system: every new role, manager and team in scope
                        applied in <your HR system> on the effective date,
                        so the organization chart read from the record
                        shows the new structure that day, and each change
                        passed to payroll, benefits and access
                        owner: employee-record-keeper   after: announce
                        automation: <level>
  report-announcement - runs collect-and-report: the questions people
                        raised, how each one was answered, and what the
                        announcement got wrong or left out
                        owner: comms-manager       after: record-change
                        automation: <level>
  review-structure    - convenes debrief: on <the review date>, whether
                        the change did what it was for, set against the
                        reason recorded at the start
                        owner: decision-coordinator
                        after: report-announcement automation: <level>
run-scoped:
  timeline    - runs roll-call               owner: decision-coordinator
                every: <cadence>
                from: take-in-proposal  until: announce
  options-log - runs collect-and-report      owner: workforce-planner
                from: draw-options      until: run close
handoffs:
  take-in-proposal -> name-access [reorganization-proposal]: the change,
    its reason, the teams in scope, the date wanted and the sponsor
  name-access -> draw-current [access-list]: the named people who may see
    the work, with the date each one was added
  draw-current -> draw-options [current-structure]: each role in scope
    with its level, its reporting line and its cost
  draw-options -> cost-options [structure-options]: two or three
    structures with their teams, roles and reporting lines
  cost-options -> list-effects [option-costs]: the cost of each option
    against the plan and the budget, and the one-time cost of the change
  list-effects -> check-consultation [role-effects]: the effect on each
    role under each option
  check-consultation -> put-options [consultation-reading]: the notice and
    consultation each option needs, with the dates and the rule behind
    each one
  put-options -> choose-structure [options-briefed]: the options as the
    sponsor saw them
  choose-structure -> consult / decide-people [chosen-structure]: the
    structure chosen, the conditions on it, and who disagreed and why
  consult -> decide-people [consultation-record]: each view the
    representatives gave, and the answer to it
  decide-people -> hand-on-changes [person-decisions]: each continuing
    role's holder, manager and team, with the leader who decided
  hand-on-changes -> plan-announcement [changes-handed-on]: each pay
    change, contested role and ended role, with the run that now holds it
  plan-announcement -> tell-people [announcement-plan]: who hears what,
    from whom, in what order and when
  tell-people -> announce [people-told]: each affected person told, by
    whom and when
  announce -> record-change [announcement-issued]: the announcement as
    issued, and the effective date
  record-change -> report-announcement [structure-recorded]: every change
    applied on the effective date, and the chart that shows it
  report-announcement -> review-structure [announcement-report]: the
    questions raised, the answers, and what to fix
deviations:
  cost-options -> draw-options [no-option-fits-budget]: no option fits the
    plan and the budget, so the options are drawn again, or the sponsor
    asks for a revision of the plan under ref/hr/plan-the-workforce
  choose-structure -> draw-options [every-option-rejected]: the sponsor
    rejects every option, so new options are drawn and the rejected ones
    are kept with the reason
  consult -> draw-options [consultation-changes-proposal]: the
    consultation shows a better structure or a cost nobody counted, so
    the options are drawn again and the sponsor chooses again
  decide-people -> choose-structure [person-decision-changes-structure]:
    a decision about a person would change the chosen structure, so the
    sponsor decides the structure again before any other decision about a
    person is final
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the executive sponsor, the head of
           HR, the finance lead, counsel, the HR business partners, the
           named leaders and the managers of the affected people>
  systems: <your HR system> (write), the workforce plan (read),
           <your decision record> (write),
           <your financial planning system> (read), the staff
           communication channel (write), the notification channel
           (write)
  data:    the workforce plan <version>, the labor cost budget <version>,
           <your job framework> <version>,
           <your jurisdiction's rules on consultation>, the announcement
           at its version
policy:
  only the named people on the access list see the options, the costs
    and the effects before the announcement
  the options and their effects are drawn by role from the work each role
    does, and no step weighs a protected characteristic
  an agent never decides the structure or what happens to a person, and
    each decision is recorded with the name of who made it
  no decision about a person is final before the consultation ends, where
    <your jurisdiction's rules on consultation> require one
  a role that ends goes to ref/hr/run-a-layoff, and the staff
    announcement waits until the people whose roles end have been told
    under that process
  a pay change goes through ref/hr/change-an-employees-pay, and the
    reorganization never sets one by itself
  each affected person hears from a manager before the staff
    announcement
  every change takes effect on one date, and the record, the chart and
    the announcement all carry that date
measures:
  cycle time: <weeks> from the proposal to the effective date
  told first: <target> share of affected people told by a manager before
              the announcement
  volume: <changes per year>
  quality gate: every affected role has a recorded decision with the name
                of who made it, and the record matches the chosen
                structure on the effective date
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

50 blanks to fill. Everything else is the process.

this process from: ref/hr/change-the-organization-structure v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.