Catalog / Business processes / Human resources / Workforce planning / Change the Organization Structure
reference process · human-resources · 18 activities · 11 on the roster
Change the Organization Structure
A leader proposes a change to how one or more teams are organized, such as merging two teams, splitting one, or moving reporting lines. Only the people the head of human resources (HR) names see the work before it is announced. The workforce-planner agent draws the structure as it stands and two or three options, each with its reporting lines and its cost, and lists the effect of each option on every role. Counsel says what notice and consultation the local rules require. The decision-coordinator agent puts the options to the executive sponsor, who chooses one, and then runs the decisions in which named leaders decide what happens to each person. Pay changes and roles that end go on to the processes that decide them. Each affected person hears from a manager first, the comms-manager agent runs the staff announcement, and the employee-record-keeper agent records every change on one date. The run closes when the new structure is in the record and in the chart read from it, and the date to review it is set.
The goals
Tell 100% of affected people before the announcement
Make the change effective within 8 weeks of the proposal
Keep the new structure's cost within the approved budget
Keep leaving from the changed teams under 5% in the next six months
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
18 activities from a leader proposes a change to how one or more teams are organized to the new structure is in the record on one date, and every affected person heard first, 4 of them gates a person has to sign.
Change the Organization Structure a leader proposes a change to how one or more teams are organized → the new structure is in the record on one date, and every affected person heard first
no option fits the budget the sponsor rejects every option the consultation changes the proposal no consultation is required a decision about a person would change the structure a leader proposes a change to how one or more teams are organized 1 Take in the Proposal the reason, the teams in scope and the date wanted 2 Name Who May See the Work the named people who see the options before the decision 3 Draw the Current Structure teams, roles, reporting lines and cost today 4 Draw the Options two or three structures, each with its reporting lines 5 Cost Each Option the labor cost of each, against the plan and the budget 6 List the Effect on Each Role each role kept, changed, moved, added or ended 7 Check the Consultation Rules the notice and consultation the local rules require 8 Put the Options to the Sponsor the options, their cost and their effect on roles 9 Choose the Structure the sponsor chooses, with any dissent recorded a person signs · never an agent 10 Consult Where the Rules Require It the representatives consulted, and each view answered a person signs · never an agent 11 Decide What Happens to Each Person each continuing role's holder, manager and team a person signs · never an agent 12 Hand On Pay Changes and Ended Roles each one to the process that decides it 13 Plan the Announcement who hears what, in what order and on what date 14 Tell Each Affected Person each person hears from a manager first a person signs · never an agent 15 Announce the Change the staff announcement, on the planned date 16 Record the Change on One Date every new role, manager and team, on the effective date 17 Report on the Announcement the questions raised, and how they were answered 18 Review the Structure at Its Date whether the change did what it was for the new structure is in the record on one date, and every affected person heard first
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: change the organization structure id: <team> /change-the-organization-structure v1
from: ref/hr/change-the-organization-structure v1
owner: <who> effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
more teams are organized, recorded in <your decision record>
watch: record=<reorganization proposal>
system=<your decision record>
change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
one run, and two changes that touch the same team are joined
into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
role's holder decided by a named leader, every affected person told
by a manager before the announcement, and every change recorded in
<your HR system> on one effective date
phases:
take-in-proposal - human: the change proposed, the reason for it,
the teams in scope, the date wanted and the
executive sponsor who will choose
owner: decision-coordinator after: trigger
automation: <level>
name-access - human: the named people who may see the options,
the costs and the effects before the
announcement, recorded with the date each one was
added
owner: <your head of HR role>
after: take-in-proposal automation: <level>
draw-current - runs collect-and-report: the teams in scope as
they stand today, with each role, its level, its
reporting line and its cost, read from
<your HR system> and the workforce plan
owner: workforce-planner after: name-access
automation: <level>
draw-options - human: two or three structures that meet the
reason for the change, each with its teams, its
roles and its reporting lines
owner: workforce-planner after: draw-current
automation: <level>
cost-options - runs assessment: the labor cost of each option
for the year and for a full year, set beside the
workforce plan and the budget, with the one-time
cost of making the change
owner: workforce-planner after: draw-options
automation: <level>
list-effects - runs assessment: each role in scope marked as
kept, changed, moved to a new manager, added or
ended under each option, read from the work the
role does
owner: workforce-planner after: cost-options
automation: <level>
check-consultation - runs assessment: whether
<your jurisdiction's rules on consultation>
require notice to employees or consultation with
their representatives before any decision about a
person, and the dates they set
owner: <your counsel role>
after: list-effects by: <days>
automation: <level>
put-options - convenes briefing: the options put to the
executive sponsor with their cost, their effect on
roles and the consultation each one needs
owner: decision-coordinator
after: check-consultation automation: <level>
choose-structure - convenes decide-and-announce: the executive
sponsor chooses one structure, and the decision is
recorded with who disagreed and why
owner: <your executive sponsor role>
after: put-options by: <date>
automation: never
consult - human: the employee representatives informed and
consulted on the chosen structure for the time
<your jurisdiction's rules on consultation> set,
and each view they gave answered in writing
owner: <your HR business partner role>
after: choose-structure, when the rules require
consultation automation: never
decide-people - convenes decide-and-announce: for each continuing
role in scope, the named leader decides who holds
it, the manager and the team, and each decision is
recorded with the leader's name
owner: <your named leader role>
after: consult, or choose-structure when no
consultation is required automation: never
hand-on-changes - human: each pay change sent to
ref/hr/change-an-employees-pay, each new role with
more candidates than places to
ref/hr/move-an-employee-to-a-new-role, and each
role that ends to ref/hr/run-a-layoff
owner: decision-coordinator after: decide-people
automation: <level>
plan-announcement - human: who hears what, from whom, in what order
and on what date, with the affected people first
and the staff announcement after them
owner: comms-manager after: hand-on-changes
automation: <level>
tell-people - human: each affected person told in a
conversation with a manager what changes for them,
before the staff announcement and on the planned
day
owner: <your manager role>
after: plan-announcement automation: never
announce - human: the staff announcement issued on the
planned date, in the version every audience
shares, with the effective date and where to ask
questions
owner: comms-manager after: tell-people
automation: <level>
record-change - system: every new role, manager and team in scope
applied in <your HR system> on the effective date,
so the organization chart read from the record
shows the new structure that day, and each change
passed to payroll, benefits and access
owner: employee-record-keeper after: announce
automation: <level>
report-announcement - runs collect-and-report: the questions people
raised, how each one was answered, and what the
announcement got wrong or left out
owner: comms-manager after: record-change
automation: <level>
review-structure - convenes debrief: on <the review date> , whether
the change did what it was for, set against the
reason recorded at the start
owner: decision-coordinator
after: report-announcement automation: <level>
run-scoped:
timeline - runs roll-call owner: decision-coordinator
every: <cadence>
from: take-in-proposal until: announce
options-log - runs collect-and-report owner: workforce-planner
from: draw-options until: run close
handoffs:
take-in-proposal -> name-access [reorganization-proposal]: the change,
its reason, the teams in scope, the date wanted and the sponsor
name-access -> draw-current [access-list]: the named people who may see
the work, with the date each one was added
draw-current -> draw-options [current-structure]: each role in scope
with its level, its reporting line and its cost
draw-options -> cost-options [structure-options]: two or three
structures with their teams, roles and reporting lines
cost-options -> list-effects [option-costs]: the cost of each option
against the plan and the budget, and the one-time cost of the change
list-effects -> check-consultation [role-effects]: the effect on each
role under each option
check-consultation -> put-options [consultation-reading]: the notice and
consultation each option needs, with the dates and the rule behind
each one
put-options -> choose-structure [options-briefed]: the options as the
sponsor saw them
choose-structure -> consult / decide-people [chosen-structure]: the
structure chosen, the conditions on it, and who disagreed and why
consult -> decide-people [consultation-record]: each view the
representatives gave, and the answer to it
decide-people -> hand-on-changes [person-decisions]: each continuing
role's holder, manager and team, with the leader who decided
hand-on-changes -> plan-announcement [changes-handed-on]: each pay
change, contested role and ended role, with the run that now holds it
plan-announcement -> tell-people [announcement-plan]: who hears what,
from whom, in what order and when
tell-people -> announce [people-told]: each affected person told, by
whom and when
announce -> record-change [announcement-issued]: the announcement as
issued, and the effective date
record-change -> report-announcement [structure-recorded]: every change
applied on the effective date, and the chart that shows it
report-announcement -> review-structure [announcement-report]: the
questions raised, the answers, and what to fix
deviations:
cost-options -> draw-options [no-option-fits-budget]: no option fits the
plan and the budget, so the options are drawn again, or the sponsor
asks for a revision of the plan under ref/hr/plan-the-workforce
choose-structure -> draw-options [every-option-rejected]: the sponsor
rejects every option, so new options are drawn and the rejected ones
are kept with the reason
consult -> draw-options [consultation-changes-proposal]: the
consultation shows a better structure or a cost nobody counted, so
the options are drawn again and the sponsor chooses again
decide-people -> choose-structure [person-decision-changes-structure]:
a decision about a person would change the chosen structure, so the
sponsor decides the structure again before any other decision about a
person is final
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the executive sponsor, the head of
HR, the finance lead, counsel, the HR business partners, the
named leaders and the managers of the affected people>
systems: <your HR system> (write), the workforce plan (read),
<your decision record> (write),
<your financial planning system> (read), the staff
communication channel (write), the notification channel
(write)
data: the workforce plan <version> , the labor cost budget <version> ,
<your job framework> <version> ,
<your jurisdiction's rules on consultation> , the announcement
at its version
policy:
only the named people on the access list see the options, the costs
and the effects before the announcement
the options and their effects are drawn by role from the work each role
does, and no step weighs a protected characteristic
an agent never decides the structure or what happens to a person, and
each decision is recorded with the name of who made it
no decision about a person is final before the consultation ends, where
<your jurisdiction's rules on consultation> require one
a role that ends goes to ref/hr/run-a-layoff, and the staff
announcement waits until the people whose roles end have been told
under that process
a pay change goes through ref/hr/change-an-employees-pay, and the
reorganization never sets one by itself
each affected person hears from a manager before the staff
announcement
every change takes effect on one date, and the record, the chart and
the announcement all carry that date
measures:
cycle time: <weeks> from the proposal to the effective date
told first: <target> share of affected people told by a manager before
the announcement
volume: <changes per year>
quality gate: every affected role has a recorded decision with the name
of who made it, and the record matches the chosen
structure on the effective date
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
343 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: change the organization structure id: <team>/change-the-organization-structure v1
from: ref/hr/change-the-organization-structure v1
owner: <who> effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
more teams are organized, recorded in <your decision record>
watch: record=<reorganization proposal>
system=<your decision record>
change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
one run, and two changes that touch the same team are joined
into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
role's holder decided by a named leader, every affected person told
by a manager before the announcement, and every change recorded in
<your HR system> on one effective date
phases:
take-in-proposal - human: the change proposed, the reason for it,
the teams in scope, the date wanted and the
executive sponsor who will choose
owner: decision-coordinator after: trigger
automation: <level>
name-access - human: the named people who may see the options,
the costs and the effects before the
announcement, recorded with the date each one was
added
owner: <your head of HR role>
after: take-in-proposal automation: <level>
draw-current - runs collect-and-report: the teams in scope as
they stand today, with each role, its level, its
reporting line and its cost, read from
<your HR system> and the workforce plan
owner: workforce-planner after: name-access
automation: <level>
draw-options - human: two or three structures that meet the
reason for the change, each with its teams, its
roles and its reporting lines
owner: workforce-planner after: draw-current
automation: <level>
cost-options - runs assessment: the labor cost of each option
for the year and for a full year, set beside the
workforce plan and the budget, with the one-time
cost of making the change
owner: workforce-planner after: draw-options
automation: <level>
list-effects - runs assessment: each role in scope marked as
kept, changed, moved to a new manager, added or
ended under each option, read from the work the
role does
owner: workforce-planner after: cost-options
automation: <level>
check-consultation - runs assessment: whether
<your jurisdiction's rules on consultation>
require notice to employees or consultation with
their representatives before any decision about a
person, and the dates they set
owner: <your counsel role>
after: list-effects by: <days>
automation: <level>
put-options - convenes briefing: the options put to the
executive sponsor with their cost, their effect on
roles and the consultation each one needs
owner: decision-coordinator
after: check-consultation automation: <level>
choose-structure - convenes decide-and-announce: the executive
sponsor chooses one structure, and the decision is
recorded with who disagreed and why
owner: <your executive sponsor role>
after: put-options by: <date>
automation: never
consult - human: the employee representatives informed and
consulted on the chosen structure for the time
<your jurisdiction's rules on consultation> set,
and each view they gave answered in writing
owner: <your HR business partner role>
after: choose-structure, when the rules require
consultation automation: never
decide-people - convenes decide-and-announce: for each continuing
role in scope, the named leader decides who holds
it, the manager and the team, and each decision is
recorded with the leader's name
owner: <your named leader role>
after: consult, or choose-structure when no
consultation is required automation: never
hand-on-changes - human: each pay change sent to
ref/hr/change-an-employees-pay, each new role with
more candidates than places to
ref/hr/move-an-employee-to-a-new-role, and each
role that ends to ref/hr/run-a-layoff
owner: decision-coordinator after: decide-people
automation: <level>
plan-announcement - human: who hears what, from whom, in what order
and on what date, with the affected people first
and the staff announcement after them
owner: comms-manager after: hand-on-changes
automation: <level>
tell-people - human: each affected person told in a
conversation with a manager what changes for them,
before the staff announcement and on the planned
day
owner: <your manager role>
after: plan-announcement automation: never
announce - human: the staff announcement issued on the
planned date, in the version every audience
shares, with the effective date and where to ask
questions
owner: comms-manager after: tell-people
automation: <level>
record-change - system: every new role, manager and team in scope
applied in <your HR system> on the effective date,
so the organization chart read from the record
shows the new structure that day, and each change
passed to payroll, benefits and access
owner: employee-record-keeper after: announce
automation: <level>
report-announcement - runs collect-and-report: the questions people
raised, how each one was answered, and what the
announcement got wrong or left out
owner: comms-manager after: record-change
automation: <level>
review-structure - convenes debrief: on <the review date>, whether
the change did what it was for, set against the
reason recorded at the start
owner: decision-coordinator
after: report-announcement automation: <level>
run-scoped:
timeline - runs roll-call owner: decision-coordinator
every: <cadence>
from: take-in-proposal until: announce
options-log - runs collect-and-report owner: workforce-planner
from: draw-options until: run close
handoffs:
take-in-proposal -> name-access [reorganization-proposal]: the change,
its reason, the teams in scope, the date wanted and the sponsor
name-access -> draw-current [access-list]: the named people who may see
the work, with the date each one was added
draw-current -> draw-options [current-structure]: each role in scope
with its level, its reporting line and its cost
draw-options -> cost-options [structure-options]: two or three
structures with their teams, roles and reporting lines
cost-options -> list-effects [option-costs]: the cost of each option
against the plan and the budget, and the one-time cost of the change
list-effects -> check-consultation [role-effects]: the effect on each
role under each option
check-consultation -> put-options [consultation-reading]: the notice and
consultation each option needs, with the dates and the rule behind
each one
put-options -> choose-structure [options-briefed]: the options as the
sponsor saw them
choose-structure -> consult / decide-people [chosen-structure]: the
structure chosen, the conditions on it, and who disagreed and why
consult -> decide-people [consultation-record]: each view the
representatives gave, and the answer to it
decide-people -> hand-on-changes [person-decisions]: each continuing
role's holder, manager and team, with the leader who decided
hand-on-changes -> plan-announcement [changes-handed-on]: each pay
change, contested role and ended role, with the run that now holds it
plan-announcement -> tell-people [announcement-plan]: who hears what,
from whom, in what order and when
tell-people -> announce [people-told]: each affected person told, by
whom and when
announce -> record-change [announcement-issued]: the announcement as
issued, and the effective date
record-change -> report-announcement [structure-recorded]: every change
applied on the effective date, and the chart that shows it
report-announcement -> review-structure [announcement-report]: the
questions raised, the answers, and what to fix
deviations:
cost-options -> draw-options [no-option-fits-budget]: no option fits the
plan and the budget, so the options are drawn again, or the sponsor
asks for a revision of the plan under ref/hr/plan-the-workforce
choose-structure -> draw-options [every-option-rejected]: the sponsor
rejects every option, so new options are drawn and the rejected ones
are kept with the reason
consult -> draw-options [consultation-changes-proposal]: the
consultation shows a better structure or a cost nobody counted, so
the options are drawn again and the sponsor chooses again
decide-people -> choose-structure [person-decision-changes-structure]:
a decision about a person would change the chosen structure, so the
sponsor decides the structure again before any other decision about a
person is final
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the executive sponsor, the head of
HR, the finance lead, counsel, the HR business partners, the
named leaders and the managers of the affected people>
systems: <your HR system> (write), the workforce plan (read),
<your decision record> (write),
<your financial planning system> (read), the staff
communication channel (write), the notification channel
(write)
data: the workforce plan <version>, the labor cost budget <version>,
<your job framework> <version>,
<your jurisdiction's rules on consultation>, the announcement
at its version
policy:
only the named people on the access list see the options, the costs
and the effects before the announcement
the options and their effects are drawn by role from the work each role
does, and no step weighs a protected characteristic
an agent never decides the structure or what happens to a person, and
each decision is recorded with the name of who made it
no decision about a person is final before the consultation ends, where
<your jurisdiction's rules on consultation> require one
a role that ends goes to ref/hr/run-a-layoff, and the staff
announcement waits until the people whose roles end have been told
under that process
a pay change goes through ref/hr/change-an-employees-pay, and the
reorganization never sets one by itself
each affected person hears from a manager before the staff
announcement
every change takes effect on one date, and the record, the chart and
the announcement all carry that date
measures:
cycle time: <weeks> from the proposal to the effective date
told first: <target> share of affected people told by a manager before
the announcement
volume: <changes per year>
quality gate: every affected role has a recorded decision with the name
of who made it, and the record matches the chosen
structure on the effective date
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
398 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: change the organization structure id: <team>/change-the-organization-structure v1
from: ref/hr/change-the-organization-structure v1
owner: <who> effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
more teams are organized, recorded in <your decision record>
watch: record=<reorganization proposal>
system=<your decision record>
change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
one run, and two changes that touch the same team are joined
into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
role's holder decided by a named leader, every affected person told
by a manager before the announcement, and every change recorded in
<your HR system> on one effective date
phases:
take-in-proposal - human: the change proposed, the reason for it,
the teams in scope, the date wanted and the
executive sponsor who will choose
owner: decision-coordinator after: trigger
automation: <level>
name-access - human: the named people who may see the options,
the costs and the effects before the
announcement, recorded with the date each one was
added
owner: <your head of HR role>
after: take-in-proposal automation: <level>
draw-current - runs collect-and-report: the teams in scope as
they stand today, with each role, its level, its
reporting line and its cost, read from
<your HR system> and the workforce plan
owner: workforce-planner after: name-access
automation: <level>
draw-options - human: two or three structures that meet the
reason for the change, each with its teams, its
roles and its reporting lines
owner: workforce-planner after: draw-current
automation: <level>
cost-options - runs assessment: the labor cost of each option
for the year and for a full year, set beside the
workforce plan and the budget, with the one-time
cost of making the change
owner: workforce-planner after: draw-options
automation: <level>
list-effects - runs assessment: each role in scope marked as
kept, changed, moved to a new manager, added or
ended under each option, read from the work the
role does
owner: workforce-planner after: cost-options
automation: <level>
check-consultation - runs assessment: whether
<your jurisdiction's rules on consultation>
require notice to employees or consultation with
their representatives before any decision about a
person, and the dates they set
owner: <your counsel role>
after: list-effects by: <days>
automation: <level>
put-options - convenes briefing: the options put to the
executive sponsor with their cost, their effect on
roles and the consultation each one needs
owner: decision-coordinator
after: check-consultation automation: <level>
choose-structure - convenes decide-and-announce: the executive
sponsor chooses one structure, and the decision is
recorded with who disagreed and why
owner: <your executive sponsor role>
after: put-options by: <date>
automation: never
consult - human: the employee representatives informed and
consulted on the chosen structure for the time
<your jurisdiction's rules on consultation> set,
and each view they gave answered in writing
owner: <your HR business partner role>
after: choose-structure, when the rules require
consultation automation: never
decide-people - convenes decide-and-announce: for each continuing
role in scope, the named leader decides who holds
it, the manager and the team, and each decision is
recorded with the leader's name
owner: <your named leader role>
after: consult, or choose-structure when no
consultation is required automation: never
hand-on-changes - human: each pay change sent to
ref/hr/change-an-employees-pay, each new role with
more candidates than places to
ref/hr/move-an-employee-to-a-new-role, and each
role that ends to ref/hr/run-a-layoff
owner: decision-coordinator after: decide-people
automation: <level>
plan-announcement - human: who hears what, from whom, in what order
and on what date, with the affected people first
and the staff announcement after them
owner: comms-manager after: hand-on-changes
automation: <level>
tell-people - human: each affected person told in a
conversation with a manager what changes for them,
before the staff announcement and on the planned
day
owner: <your manager role>
after: plan-announcement automation: never
announce - human: the staff announcement issued on the
planned date, in the version every audience
shares, with the effective date and where to ask
questions
owner: comms-manager after: tell-people
automation: <level>
record-change - system: every new role, manager and team in scope
applied in <your HR system> on the effective date,
so the organization chart read from the record
shows the new structure that day, and each change
passed to payroll, benefits and access
owner: employee-record-keeper after: announce
automation: <level>
report-announcement - runs collect-and-report: the questions people
raised, how each one was answered, and what the
announcement got wrong or left out
owner: comms-manager after: record-change
automation: <level>
review-structure - convenes debrief: on <the review date>, whether
the change did what it was for, set against the
reason recorded at the start
owner: decision-coordinator
after: report-announcement automation: <level>
run-scoped:
timeline - runs roll-call owner: decision-coordinator
every: <cadence>
from: take-in-proposal until: announce
options-log - runs collect-and-report owner: workforce-planner
from: draw-options until: run close
handoffs:
take-in-proposal -> name-access [reorganization-proposal]: the change,
its reason, the teams in scope, the date wanted and the sponsor
name-access -> draw-current [access-list]: the named people who may see
the work, with the date each one was added
draw-current -> draw-options [current-structure]: each role in scope
with its level, its reporting line and its cost
draw-options -> cost-options [structure-options]: two or three
structures with their teams, roles and reporting lines
cost-options -> list-effects [option-costs]: the cost of each option
against the plan and the budget, and the one-time cost of the change
list-effects -> check-consultation [role-effects]: the effect on each
role under each option
check-consultation -> put-options [consultation-reading]: the notice and
consultation each option needs, with the dates and the rule behind
each one
put-options -> choose-structure [options-briefed]: the options as the
sponsor saw them
choose-structure -> consult / decide-people [chosen-structure]: the
structure chosen, the conditions on it, and who disagreed and why
consult -> decide-people [consultation-record]: each view the
representatives gave, and the answer to it
decide-people -> hand-on-changes [person-decisions]: each continuing
role's holder, manager and team, with the leader who decided
hand-on-changes -> plan-announcement [changes-handed-on]: each pay
change, contested role and ended role, with the run that now holds it
plan-announcement -> tell-people [announcement-plan]: who hears what,
from whom, in what order and when
tell-people -> announce [people-told]: each affected person told, by
whom and when
announce -> record-change [announcement-issued]: the announcement as
issued, and the effective date
record-change -> report-announcement [structure-recorded]: every change
applied on the effective date, and the chart that shows it
report-announcement -> review-structure [announcement-report]: the
questions raised, the answers, and what to fix
deviations:
cost-options -> draw-options [no-option-fits-budget]: no option fits the
plan and the budget, so the options are drawn again, or the sponsor
asks for a revision of the plan under ref/hr/plan-the-workforce
choose-structure -> draw-options [every-option-rejected]: the sponsor
rejects every option, so new options are drawn and the rejected ones
are kept with the reason
consult -> draw-options [consultation-changes-proposal]: the
consultation shows a better structure or a cost nobody counted, so
the options are drawn again and the sponsor chooses again
decide-people -> choose-structure [person-decision-changes-structure]:
a decision about a person would change the chosen structure, so the
sponsor decides the structure again before any other decision about a
person is final
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the executive sponsor, the head of
HR, the finance lead, counsel, the HR business partners, the
named leaders and the managers of the affected people>
systems: <your HR system> (write), the workforce plan (read),
<your decision record> (write),
<your financial planning system> (read), the staff
communication channel (write), the notification channel
(write)
data: the workforce plan <version>, the labor cost budget <version>,
<your job framework> <version>,
<your jurisdiction's rules on consultation>, the announcement
at its version
policy:
only the named people on the access list see the options, the costs
and the effects before the announcement
the options and their effects are drawn by role from the work each role
does, and no step weighs a protected characteristic
an agent never decides the structure or what happens to a person, and
each decision is recorded with the name of who made it
no decision about a person is final before the consultation ends, where
<your jurisdiction's rules on consultation> require one
a role that ends goes to ref/hr/run-a-layoff, and the staff
announcement waits until the people whose roles end have been told
under that process
a pay change goes through ref/hr/change-an-employees-pay, and the
reorganization never sets one by itself
each affected person hears from a manager before the staff
announcement
every change takes effect on one date, and the record, the chart and
the announcement all carry that date
measures:
cycle time: <weeks> from the proposal to the effective date
told first: <target> share of affected people told by a manager before
the announcement
volume: <changes per year>
quality gate: every affected role has a recorded decision with the name
of who made it, and the record matches the chosen
structure on the effective date
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
403 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: change the organization structure id: <team>/change-the-organization-structure v1
from: ref/hr/change-the-organization-structure v1
owner: <who> effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
more teams are organized, recorded in <your decision record>
watch: record=<reorganization proposal>
system=<your decision record>
change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
one run, and two changes that touch the same team are joined
into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
role's holder decided by a named leader, every affected person told
by a manager before the announcement, and every change recorded in
<your HR system> on one effective date
phases:
take-in-proposal - human: the change proposed, the reason for it,
the teams in scope, the date wanted and the
executive sponsor who will choose
owner: decision-coordinator after: trigger
automation: <level>
name-access - human: the named people who may see the options,
the costs and the effects before the
announcement, recorded with the date each one was
added
owner: <your head of HR role>
after: take-in-proposal automation: <level>
draw-current - runs collect-and-report: the teams in scope as
they stand today, with each role, its level, its
reporting line and its cost, read from
<your HR system> and the workforce plan
owner: workforce-planner after: name-access
automation: <level>
draw-options - human: two or three structures that meet the
reason for the change, each with its teams, its
roles and its reporting lines
owner: workforce-planner after: draw-current
automation: <level>
cost-options - runs assessment: the labor cost of each option
for the year and for a full year, set beside the
workforce plan and the budget, with the one-time
cost of making the change
owner: workforce-planner after: draw-options
automation: <level>
list-effects - runs assessment: each role in scope marked as
kept, changed, moved to a new manager, added or
ended under each option, read from the work the
role does
owner: workforce-planner after: cost-options
automation: <level>
check-consultation - runs assessment: whether
<your jurisdiction's rules on consultation>
require notice to employees or consultation with
their representatives before any decision about a
person, and the dates they set
owner: <your counsel role>
after: list-effects by: <days>
automation: <level>
put-options - convenes briefing: the options put to the
executive sponsor with their cost, their effect on
roles and the consultation each one needs
owner: decision-coordinator
after: check-consultation automation: <level>
choose-structure - convenes decide-and-announce: the executive
sponsor chooses one structure, and the decision is
recorded with who disagreed and why
owner: <your executive sponsor role>
after: put-options by: <date>
automation: never
consult - human: the employee representatives informed and
consulted on the chosen structure for the time
<your jurisdiction's rules on consultation> set,
and each view they gave answered in writing
owner: <your HR business partner role>
after: choose-structure, when the rules require
consultation automation: never
decide-people - convenes decide-and-announce: for each continuing
role in scope, the named leader decides who holds
it, the manager and the team, and each decision is
recorded with the leader's name
owner: <your named leader role>
after: consult, or choose-structure when no
consultation is required automation: never
hand-on-changes - human: each pay change sent to
ref/hr/change-an-employees-pay, each new role with
more candidates than places to
ref/hr/move-an-employee-to-a-new-role, and each
role that ends to ref/hr/run-a-layoff
owner: decision-coordinator after: decide-people
automation: <level>
plan-announcement - human: who hears what, from whom, in what order
and on what date, with the affected people first
and the staff announcement after them
owner: comms-manager after: hand-on-changes
automation: <level>
tell-people - human: each affected person told in a
conversation with a manager what changes for them,
before the staff announcement and on the planned
day
owner: <your manager role>
after: plan-announcement automation: never
announce - human: the staff announcement issued on the
planned date, in the version every audience
shares, with the effective date and where to ask
questions
owner: comms-manager after: tell-people
automation: <level>
record-change - system: every new role, manager and team in scope
applied in <your HR system> on the effective date,
so the organization chart read from the record
shows the new structure that day, and each change
passed to payroll, benefits and access
owner: employee-record-keeper after: announce
automation: <level>
report-announcement - runs collect-and-report: the questions people
raised, how each one was answered, and what the
announcement got wrong or left out
owner: comms-manager after: record-change
automation: <level>
review-structure - convenes debrief: on <the review date>, whether
the change did what it was for, set against the
reason recorded at the start
owner: decision-coordinator
after: report-announcement automation: <level>
run-scoped:
timeline - runs roll-call owner: decision-coordinator
every: <cadence>
from: take-in-proposal until: announce
options-log - runs collect-and-report owner: workforce-planner
from: draw-options until: run close
handoffs:
take-in-proposal -> name-access [reorganization-proposal]: the change,
its reason, the teams in scope, the date wanted and the sponsor
name-access -> draw-current [access-list]: the named people who may see
the work, with the date each one was added
draw-current -> draw-options [current-structure]: each role in scope
with its level, its reporting line and its cost
draw-options -> cost-options [structure-options]: two or three
structures with their teams, roles and reporting lines
cost-options -> list-effects [option-costs]: the cost of each option
against the plan and the budget, and the one-time cost of the change
list-effects -> check-consultation [role-effects]: the effect on each
role under each option
check-consultation -> put-options [consultation-reading]: the notice and
consultation each option needs, with the dates and the rule behind
each one
put-options -> choose-structure [options-briefed]: the options as the
sponsor saw them
choose-structure -> consult / decide-people [chosen-structure]: the
structure chosen, the conditions on it, and who disagreed and why
consult -> decide-people [consultation-record]: each view the
representatives gave, and the answer to it
decide-people -> hand-on-changes [person-decisions]: each continuing
role's holder, manager and team, with the leader who decided
hand-on-changes -> plan-announcement [changes-handed-on]: each pay
change, contested role and ended role, with the run that now holds it
plan-announcement -> tell-people [announcement-plan]: who hears what,
from whom, in what order and when
tell-people -> announce [people-told]: each affected person told, by
whom and when
announce -> record-change [announcement-issued]: the announcement as
issued, and the effective date
record-change -> report-announcement [structure-recorded]: every change
applied on the effective date, and the chart that shows it
report-announcement -> review-structure [announcement-report]: the
questions raised, the answers, and what to fix
deviations:
cost-options -> draw-options [no-option-fits-budget]: no option fits the
plan and the budget, so the options are drawn again, or the sponsor
asks for a revision of the plan under ref/hr/plan-the-workforce
choose-structure -> draw-options [every-option-rejected]: the sponsor
rejects every option, so new options are drawn and the rejected ones
are kept with the reason
consult -> draw-options [consultation-changes-proposal]: the
consultation shows a better structure or a cost nobody counted, so
the options are drawn again and the sponsor chooses again
decide-people -> choose-structure [person-decision-changes-structure]:
a decision about a person would change the chosen structure, so the
sponsor decides the structure again before any other decision about a
person is final
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the executive sponsor, the head of
HR, the finance lead, counsel, the HR business partners, the
named leaders and the managers of the affected people>
systems: <your HR system> (write), the workforce plan (read),
<your decision record> (write),
<your financial planning system> (read), the staff
communication channel (write), the notification channel
(write)
data: the workforce plan <version>, the labor cost budget <version>,
<your job framework> <version>,
<your jurisdiction's rules on consultation>, the announcement
at its version
policy:
only the named people on the access list see the options, the costs
and the effects before the announcement
the options and their effects are drawn by role from the work each role
does, and no step weighs a protected characteristic
an agent never decides the structure or what happens to a person, and
each decision is recorded with the name of who made it
no decision about a person is final before the consultation ends, where
<your jurisdiction's rules on consultation> require one
a role that ends goes to ref/hr/run-a-layoff, and the staff
announcement waits until the people whose roles end have been told
under that process
a pay change goes through ref/hr/change-an-employees-pay, and the
reorganization never sets one by itself
each affected person hears from a manager before the staff
announcement
every change takes effect on one date, and the record, the chart and
the announcement all carry that date
measures:
cycle time: <weeks> from the proposal to the effective date
told first: <target> share of affected people told by a manager before
the announcement
volume: <changes per year>
quality gate: every affected role has a recorded decision with the name
of who made it, and the record matches the chosen
structure on the effective date
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
394 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: change the organization structure id: <team>/change-the-organization-structure v1
from: ref/hr/change-the-organization-structure v1
owner: <who> effective: <date>
trigger: <your executive sponsor role> proposes a change to how one or
more teams are organized, recorded in <your decision record>
watch: record=<reorganization proposal>
system=<your decision record>
change=<a reorganization is proposed>
concurrency: runs may overlap across parts of the company - one change is
one run, and two changes that touch the same team are joined
into one run, or the later one waits, as <who> decides
goal: one structure chosen by the executive sponsor, every continuing
role's holder decided by a named leader, every affected person told
by a manager before the announcement, and every change recorded in
<your HR system> on one effective date
phases:
take-in-proposal - human: the change proposed, the reason for it,
the teams in scope, the date wanted and the
executive sponsor who will choose
owner: decision-coordinator after: trigger
automation: <level>
name-access - human: the named people who may see the options,
the costs and the effects before the
announcement, recorded with the date each one was
added
owner: <your head of HR role>
after: take-in-proposal automation: <level>
draw-current - runs collect-and-report: the teams in scope as
they stand today, with each role, its level, its
reporting line and its cost, read from
<your HR system> and the workforce plan
owner: workforce-planner after: name-access
automation: <level>
draw-options - human: two or three structures that meet the
reason for the change, each with its teams, its
roles and its reporting lines
owner: workforce-planner after: draw-current
automation: <level>
cost-options - runs assessment: the labor cost of each option
for the year and for a full year, set beside the
workforce plan and the budget, with the one-time
cost of making the change
owner: workforce-planner after: draw-options
automation: <level>
list-effects - runs assessment: each role in scope marked as
kept, changed, moved to a new manager, added or
ended under each option, read from the work the
role does
owner: workforce-planner after: cost-options
automation: <level>
check-consultation - runs assessment: whether
<your jurisdiction's rules on consultation>
require notice to employees or consultation with
their representatives before any decision about a
person, and the dates they set
owner: <your counsel role>
after: list-effects by: <days>
automation: <level>
put-options - convenes briefing: the options put to the
executive sponsor with their cost, their effect on
roles and the consultation each one needs
owner: decision-coordinator
after: check-consultation automation: <level>
choose-structure - convenes decide-and-announce: the executive
sponsor chooses one structure, and the decision is
recorded with who disagreed and why
owner: <your executive sponsor role>
after: put-options by: <date>
automation: never
consult - human: the employee representatives informed and
consulted on the chosen structure for the time
<your jurisdiction's rules on consultation> set,
and each view they gave answered in writing
owner: <your HR business partner role>
after: choose-structure, when the rules require
consultation automation: never
decide-people - convenes decide-and-announce: for each continuing
role in scope, the named leader decides who holds
it, the manager and the team, and each decision is
recorded with the leader's name
owner: <your named leader role>
after: consult, or choose-structure when no
consultation is required automation: never
hand-on-changes - human: each pay change sent to
ref/hr/change-an-employees-pay, each new role with
more candidates than places to
ref/hr/move-an-employee-to-a-new-role, and each
role that ends to ref/hr/run-a-layoff
owner: decision-coordinator after: decide-people
automation: <level>
plan-announcement - human: who hears what, from whom, in what order
and on what date, with the affected people first
and the staff announcement after them
owner: comms-manager after: hand-on-changes
automation: <level>
tell-people - human: each affected person told in a
conversation with a manager what changes for them,
before the staff announcement and on the planned
day
owner: <your manager role>
after: plan-announcement automation: never
announce - human: the staff announcement issued on the
planned date, in the version every audience
shares, with the effective date and where to ask
questions
owner: comms-manager after: tell-people
automation: <level>
record-change - system: every new role, manager and team in scope
applied in <your HR system> on the effective date,
so the organization chart read from the record
shows the new structure that day, and each change
passed to payroll, benefits and access
owner: employee-record-keeper after: announce
automation: <level>
report-announcement - runs collect-and-report: the questions people
raised, how each one was answered, and what the
announcement got wrong or left out
owner: comms-manager after: record-change
automation: <level>
review-structure - convenes debrief: on <the review date>, whether
the change did what it was for, set against the
reason recorded at the start
owner: decision-coordinator
after: report-announcement automation: <level>
run-scoped:
timeline - runs roll-call owner: decision-coordinator
every: <cadence>
from: take-in-proposal until: announce
options-log - runs collect-and-report owner: workforce-planner
from: draw-options until: run close
handoffs:
take-in-proposal -> name-access [reorganization-proposal]: the change,
its reason, the teams in scope, the date wanted and the sponsor
name-access -> draw-current [access-list]: the named people who may see
the work, with the date each one was added
draw-current -> draw-options [current-structure]: each role in scope
with its level, its reporting line and its cost
draw-options -> cost-options [structure-options]: two or three
structures with their teams, roles and reporting lines
cost-options -> list-effects [option-costs]: the cost of each option
against the plan and the budget, and the one-time cost of the change
list-effects -> check-consultation [role-effects]: the effect on each
role under each option
check-consultation -> put-options [consultation-reading]: the notice and
consultation each option needs, with the dates and the rule behind
each one
put-options -> choose-structure [options-briefed]: the options as the
sponsor saw them
choose-structure -> consult / decide-people [chosen-structure]: the
structure chosen, the conditions on it, and who disagreed and why
consult -> decide-people [consultation-record]: each view the
representatives gave, and the answer to it
decide-people -> hand-on-changes [person-decisions]: each continuing
role's holder, manager and team, with the leader who decided
hand-on-changes -> plan-announcement [changes-handed-on]: each pay
change, contested role and ended role, with the run that now holds it
plan-announcement -> tell-people [announcement-plan]: who hears what,
from whom, in what order and when
tell-people -> announce [people-told]: each affected person told, by
whom and when
announce -> record-change [announcement-issued]: the announcement as
issued, and the effective date
record-change -> report-announcement [structure-recorded]: every change
applied on the effective date, and the chart that shows it
report-announcement -> review-structure [announcement-report]: the
questions raised, the answers, and what to fix
deviations:
cost-options -> draw-options [no-option-fits-budget]: no option fits the
plan and the budget, so the options are drawn again, or the sponsor
asks for a revision of the plan under ref/hr/plan-the-workforce
choose-structure -> draw-options [every-option-rejected]: the sponsor
rejects every option, so new options are drawn and the rejected ones
are kept with the reason
consult -> draw-options [consultation-changes-proposal]: the
consultation shows a better structure or a cost nobody counted, so
the options are drawn again and the sponsor chooses again
decide-people -> choose-structure [person-decision-changes-structure]:
a decision about a person would change the chosen structure, so the
sponsor decides the structure again before any other decision about a
person is final
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the executive sponsor, the head of
HR, the finance lead, counsel, the HR business partners, the
named leaders and the managers of the affected people>
systems: <your HR system> (write), the workforce plan (read),
<your decision record> (write),
<your financial planning system> (read), the staff
communication channel (write), the notification channel
(write)
data: the workforce plan <version>, the labor cost budget <version>,
<your job framework> <version>,
<your jurisdiction's rules on consultation>, the announcement
at its version
policy:
only the named people on the access list see the options, the costs
and the effects before the announcement
the options and their effects are drawn by role from the work each role
does, and no step weighs a protected characteristic
an agent never decides the structure or what happens to a person, and
each decision is recorded with the name of who made it
no decision about a person is final before the consultation ends, where
<your jurisdiction's rules on consultation> require one
a role that ends goes to ref/hr/run-a-layoff, and the staff
announcement waits until the people whose roles end have been told
under that process
a pay change goes through ref/hr/change-an-employees-pay, and the
reorganization never sets one by itself
each affected person hears from a manager before the staff
announcement
every change takes effect on one date, and the record, the chart and
the announcement all carry that date
measures:
cycle time: <weeks> from the proposal to the effective date
told first: <target> share of affected people told by a manager before
the announcement
volume: <changes per year>
quality gate: every affected role has a recorded decision with the name
of who made it, and the record matches the chosen
structure on the effective date
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
50 blanks to fill. Everything else is the process.
this process
from: ref/hr/change-the-organization-structure v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.