Catalog / Business processes / Human resources / Onboarding / Run a New Hire's First Months
reference process · human-resources · 17 activities · 6 on the roster
Run a New Hire's First Months
A new hire has started, and the manager and the new hire now agree what the first months should achieve. The onboarding-manager agent drafts a plan from the job and the manager's briefing, the two of them agree it, and the commitment-keeper agent loads each objective with one owner, one date and a state into a record that only they and the HR business partner can open, then puts each check-in on both calendars. At each check-in the manager and the new hire read the plan together, and the agent records what is met, running or late and the support asked for. Where the contract sets a probation period, the employee-record-keeper agent confirms its closing date and terms, and the manager decides with the HR business partner, on the evidence of the work, to confirm, extend or end it before that date. The run closes when the outcome is on the employee record, the new hire has it in writing, and the objectives still open have passed to the performance review.
The goals
Agree the plan within 10 working days of the start
Hold 95% of check-ins on their dates
Extend no more than 10% of probations
Keep 90% of new hires past their first year
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
17 activities from the new hire's first day is confirmed and the hire is handed on to the plan is closed, and its outcome is on the employee record and in the new hire's hands, 4 of them gates a person has to sign.
Run a New Hire's First Months the new hire's first day is confirmed and the hire is handed on → the plan is closed, and its outcome is on the employee record and in the new hire's hands
the check-in does not happen the check-in has a new date another check-in is due the probation is extended the probation ended the employment the last check-in is held and no probation applies the new hire's first day is confirmed and the hire is handed on 1 Take in the New Hire the job, manager, start date and any probation period 2 Draft the Plan for the First Months objectives for the first weeks and months, from the job 3 Agree the Plan the objectives, support and check-in dates, agreed by both a person signs · never an agent 4 Load the Plan into the Tracker each objective with one owner, one date and a state 5 Set the Check-In Dates each check-in on both calendars, showing the probation date 6 Hold Each Check-In the manager and the new hire read the plan together a person signs · never an agent 7 Record the Check-In each objective's state, and the support asked for 8 Rebook a Missed Check-In a new date within days, and the manager told 9 Ask the New Hire How the Start Went a few private questions, read by the HR business partner 10 Confirm the Probation Terms the closing date, the notice and the steps the contract sets 11 Prepare the Probation Review the plan, check-ins and support given, for the manager 12 Decide the Probation the manager confirms, extends or ends it before it closes a person signs · never an agent 13 Tell the New Hire the Outcome in a conversation with the manager, then in a letter a person signs · never an agent 14 Record the Outcome the outcome, who decided and when, on the employee record 15 Hand an Ended Employment to Offboarding the last day and the outcome passed to the leaving process 16 Close the Plan each objective met, carried into the review, or closed 17 Record What the First Months Taught what helped, what was missing and what the next plan changes the plan is closed, and its outcome is on the employee record and in the new hire's hands
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: new hire first months id: <team> /run-a-new-hires-first-months v1
from: ref/hr/run-a-new-hires-first-months v1
owner: <who> effective: <date>
trigger: the new hire is handed on from ref/hr/prepare-for-a-new-hire on
the first day, in <your HR system>
watch: record=<employee record> system=<your HR system>
change=<the first day is confirmed>
concurrency: runs may overlap freely - one new hire is one run, and an
extended probation keeps the same run with a new plan
goal: the plan for the first months agreed within <days> of the start,
every check-in held on its date or moved with a reason, and the
plan closed with a recorded outcome, which, where the contract
sets a probation period, is the manager's decision to confirm,
extend or end it, made before the date it closes
phases:
take-in-hire - system: the job, the manager, the start date,
the manager's briefing from the preparation,
and any probation period the contract sets
owner: onboarding-manager after: trigger
automation: <level>
draft-plan - human: objectives for the first weeks and
months drawn from the job and the briefing, the
people to meet, the support the company gives,
and check-in dates on <your check-in cadence>
owner: onboarding-manager
after: take-in-hire automation: <level>
agree-plan - convenes decide-and-announce: the manager and
the new hire agree the objectives, the support
and the check-in dates, and both can read the
plan at its version
owner: <your manager role>
after: draft-plan by: <days>
automation: never
load-plan - system: each objective as an item with one
owner, one date and a state, in a record open
only to the new hire, the manager and <your HR
business partner role>
owner: commitment-keeper
after: agree-plan automation: <level>
set-check-ins - system: each check-in on both calendars, with
the date the probation closes shown where one
applies
owner: commitment-keeper
after: load-plan automation: <level>
hold-check-in - convenes briefing: the manager and the new hire
read the plan together, say what is going well
and what is not, and agree any change of
support
owner: <your manager role>
after: set-check-ins, and record-check-in while
check-ins remain automation: never
record-check-in - runs roll-call: each objective read as met,
running, late or untouched, with the support
asked for and any change the two agreed
owner: commitment-keeper
after: hold-check-in automation: <level>
rebook-check-in - system: a check-in that did not happen booked
again within <days> , and the manager told
owner: onboarding-manager
after: a check-in date that passes with no
check-in automation: <level>
ask-new-hire - runs collect-and-report: a few questions about
how the start went, asked in private at <days>
and at <days> , and read by <your HR business
partner role>, and by the manager only where
the new hire agrees
owner: onboarding-manager
after: set-check-ins automation: <level>
confirm-terms - runs assessment: the date the probation closes,
the notice and the steps the contract and <your
jurisdiction's rules on probation> set, and any
change to the date from a leave, read from the
employee record
owner: employee-record-keeper
after: take-in-hire, when the contract sets a
probation period automation: <level>
prepare-review - runs collect-and-report: the plan, the record
of each check-in, the support given and the
probation terms, for the manager <days> before
the probation closes, with no recommendation on
the outcome
owner: onboarding-manager
after: record-check-in + confirm-terms
automation: <level>
decide-probation - convenes decide-and-announce: the manager
confirms, extends or ends the probation with
<your HR business partner role> on the evidence
of the work, before the date it closes, with an
end read first against the contract and <your
jurisdiction's rules on ending employment in a
probation period>
owner: <your manager role>
after: prepare-review
by: <the date the probation closes>
automation: never
deliver-outcome - convenes briefing: the manager tells the new
hire the outcome in a conversation, with <your
HR business partner role> present for an
extension or an end, and the letter drafted
from <your letter template> follows it
owner: <your manager role>
after: decide-probation automation: never
record-outcome - system: the outcome, the person who decided,
the date and the letter, on the employee record
owner: employee-record-keeper
after: deliver-outcome automation: <level>
hand-to-offboarding - human: the last day and the outcome passed to
ref/hr/offboard-a-leaver, with the notice the
contract and <your jurisdiction's rules> set
owner: employee-record-keeper
after: record-outcome, when the probation ended
the employment automation: <level>
close-plan - runs roll-call: every objective closed as met,
carried into ref/hr/run-the-performance-review
with its owner, or closed with the employment,
and the plan closed at its final version
owner: commitment-keeper
after: record-outcome, and hand-to-offboarding
when it ran, or record-check-in after the last
check-in where no probation applies
automation: <level>
record-learning - convenes debrief: what helped the new hire,
what was missing, which check-ins slipped, and
what the next plan for the first months does
differently
owner: onboarding-manager
after: close-plan automation: <level>
run-scoped:
check-ins - runs roll-call owner: commitment-keeper
every: <cadence>
from: set-check-ins until: close-plan
probation-date - runs roll-call owner: employee-record-keeper
every: <cadence>
from: confirm-terms until: record-outcome
handoffs:
take-in-hire -> draft-plan / confirm-terms [new-hire]: the job, the
manager, the start date, the briefing and any probation period
draft-plan -> agree-plan [draft-plan]: the objectives, the support and
the check-in dates, at a version
agree-plan -> load-plan [agreed-plan]: the plan as both agreed it, at
its version
load-plan -> set-check-ins [tracked-plan]: each objective with one
owner, one date and a state
set-check-ins -> hold-check-in / ask-new-hire [check-in-dates]: each
check-in date, on both calendars
hold-check-in -> record-check-in [check-in-held]: what the two read
and what they agreed
record-check-in -> prepare-review / close-plan [check-in-record]: each
objective's state after the check-in, and the support asked for
confirm-terms -> prepare-review [probation-terms]: the closing date,
the notice and the steps, with the clause behind each
prepare-review -> decide-probation [review-pack]: the plan, the
check-ins, the support given and the terms
decide-probation -> deliver-outcome [probation-decision]: the outcome,
the reasons drawn from the evidence of the work, and the person who
decided
deliver-outcome -> record-outcome [outcome-delivered]: the date of the
conversation and the letter as sent
record-outcome -> hand-to-offboarding / close-plan [recorded-outcome]:
the outcome on the employee record, with its date
hand-to-offboarding -> close-plan [leaving-started]: the leaving run
started, with the last day
ask-new-hire -> record-learning [start-feedback]: what the HR business
partner takes from the answers, with nothing that names the new hire
close-plan -> record-learning [closed-plan]: every objective closed or
carried on, with its owner
deviations:
hold-check-in -> rebook-check-in [check-in-missed]: a check-in does not
happen on its date, so it is booked again and the manager is told
rebook-check-in -> hold-check-in [check-in-rebooked]: the check-in has
a new date, so it is held like any other
record-check-in -> hold-check-in [more-check-ins]: check-ins remain in
the plan, so the next one is held on its date
decide-probation -> agree-plan [probation-extended]: the probation is
extended, so the manager and the new hire agree a plan for the
extension with its own objectives, check-ins and closing date
record-outcome -> hand-to-offboarding [employment-ends]: the probation
ended the employment, so the leaving starts at
ref/hr/offboard-a-leaver
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the manager, the new hire, the HR
business partner, the head of HR and counsel>
systems: the HR system (write), the commitment tracker (write), the
calendar (write), the survey tool (write), the notification
channel (write)
data: the plan for the first months <version> , the employment
contract <version> , <your probation policy> <version> , <your
jurisdiction's rules on probation> <version> , <your letter
template> <version> , <your record retention schedule>
<version>
policy:
the probation decision, an extension and an end are made by <your
manager role> with <your HR business partner role> , and never by an
agent
the review pack sets out the plan, the check-ins and the support
given, and carries no recommendation on the outcome
the plan and the check-ins record the work and the support, and
nothing about health, family or the reason for a leave
agents never weigh a protected characteristic in anything they do
about a new hire
a probation decision never rests on a concern the new hire raised, a
leave they took or a request for an adjustment
the plan is open only to the new hire, the manager and <your HR
business partner role>
the private answers about the start are read by <your HR business
partner role>, and by the manager only where the new hire agrees
a probation is extended only where the contract and <your
jurisdiction's rules on probation> allow, once, for at most <weeks>
where the closing date passes with no decision, the probation is
treated as <your contract's rule on a probation that closes without
a decision>, and the miss is reported to <who>
an end is told to the new hire by the manager in a conversation with
<your HR business partner role> present, and the letter follows the
same day
measures:
cycle time: <days> from the start to the agreed plan
on time: <target> share of probations decided before the date they
close
volume: <new hires in their first months per period>
quality gate: every outcome names who decided it and rests on the plan
and the check-ins on the employee record
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
345 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: new hire first months id: <team>/run-a-new-hires-first-months v1
from: ref/hr/run-a-new-hires-first-months v1
owner: <who> effective: <date>
trigger: the new hire is handed on from ref/hr/prepare-for-a-new-hire on
the first day, in <your HR system>
watch: record=<employee record> system=<your HR system>
change=<the first day is confirmed>
concurrency: runs may overlap freely - one new hire is one run, and an
extended probation keeps the same run with a new plan
goal: the plan for the first months agreed within <days> of the start,
every check-in held on its date or moved with a reason, and the
plan closed with a recorded outcome, which, where the contract
sets a probation period, is the manager's decision to confirm,
extend or end it, made before the date it closes
phases:
take-in-hire - system: the job, the manager, the start date,
the manager's briefing from the preparation,
and any probation period the contract sets
owner: onboarding-manager after: trigger
automation: <level>
draft-plan - human: objectives for the first weeks and
months drawn from the job and the briefing, the
people to meet, the support the company gives,
and check-in dates on <your check-in cadence>
owner: onboarding-manager
after: take-in-hire automation: <level>
agree-plan - convenes decide-and-announce: the manager and
the new hire agree the objectives, the support
and the check-in dates, and both can read the
plan at its version
owner: <your manager role>
after: draft-plan by: <days>
automation: never
load-plan - system: each objective as an item with one
owner, one date and a state, in a record open
only to the new hire, the manager and <your HR
business partner role>
owner: commitment-keeper
after: agree-plan automation: <level>
set-check-ins - system: each check-in on both calendars, with
the date the probation closes shown where one
applies
owner: commitment-keeper
after: load-plan automation: <level>
hold-check-in - convenes briefing: the manager and the new hire
read the plan together, say what is going well
and what is not, and agree any change of
support
owner: <your manager role>
after: set-check-ins, and record-check-in while
check-ins remain automation: never
record-check-in - runs roll-call: each objective read as met,
running, late or untouched, with the support
asked for and any change the two agreed
owner: commitment-keeper
after: hold-check-in automation: <level>
rebook-check-in - system: a check-in that did not happen booked
again within <days>, and the manager told
owner: onboarding-manager
after: a check-in date that passes with no
check-in automation: <level>
ask-new-hire - runs collect-and-report: a few questions about
how the start went, asked in private at <days>
and at <days>, and read by <your HR business
partner role>, and by the manager only where
the new hire agrees
owner: onboarding-manager
after: set-check-ins automation: <level>
confirm-terms - runs assessment: the date the probation closes,
the notice and the steps the contract and <your
jurisdiction's rules on probation> set, and any
change to the date from a leave, read from the
employee record
owner: employee-record-keeper
after: take-in-hire, when the contract sets a
probation period automation: <level>
prepare-review - runs collect-and-report: the plan, the record
of each check-in, the support given and the
probation terms, for the manager <days> before
the probation closes, with no recommendation on
the outcome
owner: onboarding-manager
after: record-check-in + confirm-terms
automation: <level>
decide-probation - convenes decide-and-announce: the manager
confirms, extends or ends the probation with
<your HR business partner role> on the evidence
of the work, before the date it closes, with an
end read first against the contract and <your
jurisdiction's rules on ending employment in a
probation period>
owner: <your manager role>
after: prepare-review
by: <the date the probation closes>
automation: never
deliver-outcome - convenes briefing: the manager tells the new
hire the outcome in a conversation, with <your
HR business partner role> present for an
extension or an end, and the letter drafted
from <your letter template> follows it
owner: <your manager role>
after: decide-probation automation: never
record-outcome - system: the outcome, the person who decided,
the date and the letter, on the employee record
owner: employee-record-keeper
after: deliver-outcome automation: <level>
hand-to-offboarding - human: the last day and the outcome passed to
ref/hr/offboard-a-leaver, with the notice the
contract and <your jurisdiction's rules> set
owner: employee-record-keeper
after: record-outcome, when the probation ended
the employment automation: <level>
close-plan - runs roll-call: every objective closed as met,
carried into ref/hr/run-the-performance-review
with its owner, or closed with the employment,
and the plan closed at its final version
owner: commitment-keeper
after: record-outcome, and hand-to-offboarding
when it ran, or record-check-in after the last
check-in where no probation applies
automation: <level>
record-learning - convenes debrief: what helped the new hire,
what was missing, which check-ins slipped, and
what the next plan for the first months does
differently
owner: onboarding-manager
after: close-plan automation: <level>
run-scoped:
check-ins - runs roll-call owner: commitment-keeper
every: <cadence>
from: set-check-ins until: close-plan
probation-date - runs roll-call owner: employee-record-keeper
every: <cadence>
from: confirm-terms until: record-outcome
handoffs:
take-in-hire -> draft-plan / confirm-terms [new-hire]: the job, the
manager, the start date, the briefing and any probation period
draft-plan -> agree-plan [draft-plan]: the objectives, the support and
the check-in dates, at a version
agree-plan -> load-plan [agreed-plan]: the plan as both agreed it, at
its version
load-plan -> set-check-ins [tracked-plan]: each objective with one
owner, one date and a state
set-check-ins -> hold-check-in / ask-new-hire [check-in-dates]: each
check-in date, on both calendars
hold-check-in -> record-check-in [check-in-held]: what the two read
and what they agreed
record-check-in -> prepare-review / close-plan [check-in-record]: each
objective's state after the check-in, and the support asked for
confirm-terms -> prepare-review [probation-terms]: the closing date,
the notice and the steps, with the clause behind each
prepare-review -> decide-probation [review-pack]: the plan, the
check-ins, the support given and the terms
decide-probation -> deliver-outcome [probation-decision]: the outcome,
the reasons drawn from the evidence of the work, and the person who
decided
deliver-outcome -> record-outcome [outcome-delivered]: the date of the
conversation and the letter as sent
record-outcome -> hand-to-offboarding / close-plan [recorded-outcome]:
the outcome on the employee record, with its date
hand-to-offboarding -> close-plan [leaving-started]: the leaving run
started, with the last day
ask-new-hire -> record-learning [start-feedback]: what the HR business
partner takes from the answers, with nothing that names the new hire
close-plan -> record-learning [closed-plan]: every objective closed or
carried on, with its owner
deviations:
hold-check-in -> rebook-check-in [check-in-missed]: a check-in does not
happen on its date, so it is booked again and the manager is told
rebook-check-in -> hold-check-in [check-in-rebooked]: the check-in has
a new date, so it is held like any other
record-check-in -> hold-check-in [more-check-ins]: check-ins remain in
the plan, so the next one is held on its date
decide-probation -> agree-plan [probation-extended]: the probation is
extended, so the manager and the new hire agree a plan for the
extension with its own objectives, check-ins and closing date
record-outcome -> hand-to-offboarding [employment-ends]: the probation
ended the employment, so the leaving starts at
ref/hr/offboard-a-leaver
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the manager, the new hire, the HR
business partner, the head of HR and counsel>
systems: the HR system (write), the commitment tracker (write), the
calendar (write), the survey tool (write), the notification
channel (write)
data: the plan for the first months <version>, the employment
contract <version>, <your probation policy> <version>, <your
jurisdiction's rules on probation> <version>, <your letter
template> <version>, <your record retention schedule>
<version>
policy:
the probation decision, an extension and an end are made by <your
manager role> with <your HR business partner role>, and never by an
agent
the review pack sets out the plan, the check-ins and the support
given, and carries no recommendation on the outcome
the plan and the check-ins record the work and the support, and
nothing about health, family or the reason for a leave
agents never weigh a protected characteristic in anything they do
about a new hire
a probation decision never rests on a concern the new hire raised, a
leave they took or a request for an adjustment
the plan is open only to the new hire, the manager and <your HR
business partner role>
the private answers about the start are read by <your HR business
partner role>, and by the manager only where the new hire agrees
a probation is extended only where the contract and <your
jurisdiction's rules on probation> allow, once, for at most <weeks>
where the closing date passes with no decision, the probation is
treated as <your contract's rule on a probation that closes without
a decision>, and the miss is reported to <who>
an end is told to the new hire by the manager in a conversation with
<your HR business partner role> present, and the letter follows the
same day
measures:
cycle time: <days> from the start to the agreed plan
on time: <target> share of probations decided before the date they
close
volume: <new hires in their first months per period>
quality gate: every outcome names who decided it and rests on the plan
and the check-ins on the employee record
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
400 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: new hire first months id: <team>/run-a-new-hires-first-months v1
from: ref/hr/run-a-new-hires-first-months v1
owner: <who> effective: <date>
trigger: the new hire is handed on from ref/hr/prepare-for-a-new-hire on
the first day, in <your HR system>
watch: record=<employee record> system=<your HR system>
change=<the first day is confirmed>
concurrency: runs may overlap freely - one new hire is one run, and an
extended probation keeps the same run with a new plan
goal: the plan for the first months agreed within <days> of the start,
every check-in held on its date or moved with a reason, and the
plan closed with a recorded outcome, which, where the contract
sets a probation period, is the manager's decision to confirm,
extend or end it, made before the date it closes
phases:
take-in-hire - system: the job, the manager, the start date,
the manager's briefing from the preparation,
and any probation period the contract sets
owner: onboarding-manager after: trigger
automation: <level>
draft-plan - human: objectives for the first weeks and
months drawn from the job and the briefing, the
people to meet, the support the company gives,
and check-in dates on <your check-in cadence>
owner: onboarding-manager
after: take-in-hire automation: <level>
agree-plan - convenes decide-and-announce: the manager and
the new hire agree the objectives, the support
and the check-in dates, and both can read the
plan at its version
owner: <your manager role>
after: draft-plan by: <days>
automation: never
load-plan - system: each objective as an item with one
owner, one date and a state, in a record open
only to the new hire, the manager and <your HR
business partner role>
owner: commitment-keeper
after: agree-plan automation: <level>
set-check-ins - system: each check-in on both calendars, with
the date the probation closes shown where one
applies
owner: commitment-keeper
after: load-plan automation: <level>
hold-check-in - convenes briefing: the manager and the new hire
read the plan together, say what is going well
and what is not, and agree any change of
support
owner: <your manager role>
after: set-check-ins, and record-check-in while
check-ins remain automation: never
record-check-in - runs roll-call: each objective read as met,
running, late or untouched, with the support
asked for and any change the two agreed
owner: commitment-keeper
after: hold-check-in automation: <level>
rebook-check-in - system: a check-in that did not happen booked
again within <days>, and the manager told
owner: onboarding-manager
after: a check-in date that passes with no
check-in automation: <level>
ask-new-hire - runs collect-and-report: a few questions about
how the start went, asked in private at <days>
and at <days>, and read by <your HR business
partner role>, and by the manager only where
the new hire agrees
owner: onboarding-manager
after: set-check-ins automation: <level>
confirm-terms - runs assessment: the date the probation closes,
the notice and the steps the contract and <your
jurisdiction's rules on probation> set, and any
change to the date from a leave, read from the
employee record
owner: employee-record-keeper
after: take-in-hire, when the contract sets a
probation period automation: <level>
prepare-review - runs collect-and-report: the plan, the record
of each check-in, the support given and the
probation terms, for the manager <days> before
the probation closes, with no recommendation on
the outcome
owner: onboarding-manager
after: record-check-in + confirm-terms
automation: <level>
decide-probation - convenes decide-and-announce: the manager
confirms, extends or ends the probation with
<your HR business partner role> on the evidence
of the work, before the date it closes, with an
end read first against the contract and <your
jurisdiction's rules on ending employment in a
probation period>
owner: <your manager role>
after: prepare-review
by: <the date the probation closes>
automation: never
deliver-outcome - convenes briefing: the manager tells the new
hire the outcome in a conversation, with <your
HR business partner role> present for an
extension or an end, and the letter drafted
from <your letter template> follows it
owner: <your manager role>
after: decide-probation automation: never
record-outcome - system: the outcome, the person who decided,
the date and the letter, on the employee record
owner: employee-record-keeper
after: deliver-outcome automation: <level>
hand-to-offboarding - human: the last day and the outcome passed to
ref/hr/offboard-a-leaver, with the notice the
contract and <your jurisdiction's rules> set
owner: employee-record-keeper
after: record-outcome, when the probation ended
the employment automation: <level>
close-plan - runs roll-call: every objective closed as met,
carried into ref/hr/run-the-performance-review
with its owner, or closed with the employment,
and the plan closed at its final version
owner: commitment-keeper
after: record-outcome, and hand-to-offboarding
when it ran, or record-check-in after the last
check-in where no probation applies
automation: <level>
record-learning - convenes debrief: what helped the new hire,
what was missing, which check-ins slipped, and
what the next plan for the first months does
differently
owner: onboarding-manager
after: close-plan automation: <level>
run-scoped:
check-ins - runs roll-call owner: commitment-keeper
every: <cadence>
from: set-check-ins until: close-plan
probation-date - runs roll-call owner: employee-record-keeper
every: <cadence>
from: confirm-terms until: record-outcome
handoffs:
take-in-hire -> draft-plan / confirm-terms [new-hire]: the job, the
manager, the start date, the briefing and any probation period
draft-plan -> agree-plan [draft-plan]: the objectives, the support and
the check-in dates, at a version
agree-plan -> load-plan [agreed-plan]: the plan as both agreed it, at
its version
load-plan -> set-check-ins [tracked-plan]: each objective with one
owner, one date and a state
set-check-ins -> hold-check-in / ask-new-hire [check-in-dates]: each
check-in date, on both calendars
hold-check-in -> record-check-in [check-in-held]: what the two read
and what they agreed
record-check-in -> prepare-review / close-plan [check-in-record]: each
objective's state after the check-in, and the support asked for
confirm-terms -> prepare-review [probation-terms]: the closing date,
the notice and the steps, with the clause behind each
prepare-review -> decide-probation [review-pack]: the plan, the
check-ins, the support given and the terms
decide-probation -> deliver-outcome [probation-decision]: the outcome,
the reasons drawn from the evidence of the work, and the person who
decided
deliver-outcome -> record-outcome [outcome-delivered]: the date of the
conversation and the letter as sent
record-outcome -> hand-to-offboarding / close-plan [recorded-outcome]:
the outcome on the employee record, with its date
hand-to-offboarding -> close-plan [leaving-started]: the leaving run
started, with the last day
ask-new-hire -> record-learning [start-feedback]: what the HR business
partner takes from the answers, with nothing that names the new hire
close-plan -> record-learning [closed-plan]: every objective closed or
carried on, with its owner
deviations:
hold-check-in -> rebook-check-in [check-in-missed]: a check-in does not
happen on its date, so it is booked again and the manager is told
rebook-check-in -> hold-check-in [check-in-rebooked]: the check-in has
a new date, so it is held like any other
record-check-in -> hold-check-in [more-check-ins]: check-ins remain in
the plan, so the next one is held on its date
decide-probation -> agree-plan [probation-extended]: the probation is
extended, so the manager and the new hire agree a plan for the
extension with its own objectives, check-ins and closing date
record-outcome -> hand-to-offboarding [employment-ends]: the probation
ended the employment, so the leaving starts at
ref/hr/offboard-a-leaver
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the manager, the new hire, the HR
business partner, the head of HR and counsel>
systems: the HR system (write), the commitment tracker (write), the
calendar (write), the survey tool (write), the notification
channel (write)
data: the plan for the first months <version>, the employment
contract <version>, <your probation policy> <version>, <your
jurisdiction's rules on probation> <version>, <your letter
template> <version>, <your record retention schedule>
<version>
policy:
the probation decision, an extension and an end are made by <your
manager role> with <your HR business partner role>, and never by an
agent
the review pack sets out the plan, the check-ins and the support
given, and carries no recommendation on the outcome
the plan and the check-ins record the work and the support, and
nothing about health, family or the reason for a leave
agents never weigh a protected characteristic in anything they do
about a new hire
a probation decision never rests on a concern the new hire raised, a
leave they took or a request for an adjustment
the plan is open only to the new hire, the manager and <your HR
business partner role>
the private answers about the start are read by <your HR business
partner role>, and by the manager only where the new hire agrees
a probation is extended only where the contract and <your
jurisdiction's rules on probation> allow, once, for at most <weeks>
where the closing date passes with no decision, the probation is
treated as <your contract's rule on a probation that closes without
a decision>, and the miss is reported to <who>
an end is told to the new hire by the manager in a conversation with
<your HR business partner role> present, and the letter follows the
same day
measures:
cycle time: <days> from the start to the agreed plan
on time: <target> share of probations decided before the date they
close
volume: <new hires in their first months per period>
quality gate: every outcome names who decided it and rests on the plan
and the check-ins on the employee record
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
405 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: new hire first months id: <team>/run-a-new-hires-first-months v1
from: ref/hr/run-a-new-hires-first-months v1
owner: <who> effective: <date>
trigger: the new hire is handed on from ref/hr/prepare-for-a-new-hire on
the first day, in <your HR system>
watch: record=<employee record> system=<your HR system>
change=<the first day is confirmed>
concurrency: runs may overlap freely - one new hire is one run, and an
extended probation keeps the same run with a new plan
goal: the plan for the first months agreed within <days> of the start,
every check-in held on its date or moved with a reason, and the
plan closed with a recorded outcome, which, where the contract
sets a probation period, is the manager's decision to confirm,
extend or end it, made before the date it closes
phases:
take-in-hire - system: the job, the manager, the start date,
the manager's briefing from the preparation,
and any probation period the contract sets
owner: onboarding-manager after: trigger
automation: <level>
draft-plan - human: objectives for the first weeks and
months drawn from the job and the briefing, the
people to meet, the support the company gives,
and check-in dates on <your check-in cadence>
owner: onboarding-manager
after: take-in-hire automation: <level>
agree-plan - convenes decide-and-announce: the manager and
the new hire agree the objectives, the support
and the check-in dates, and both can read the
plan at its version
owner: <your manager role>
after: draft-plan by: <days>
automation: never
load-plan - system: each objective as an item with one
owner, one date and a state, in a record open
only to the new hire, the manager and <your HR
business partner role>
owner: commitment-keeper
after: agree-plan automation: <level>
set-check-ins - system: each check-in on both calendars, with
the date the probation closes shown where one
applies
owner: commitment-keeper
after: load-plan automation: <level>
hold-check-in - convenes briefing: the manager and the new hire
read the plan together, say what is going well
and what is not, and agree any change of
support
owner: <your manager role>
after: set-check-ins, and record-check-in while
check-ins remain automation: never
record-check-in - runs roll-call: each objective read as met,
running, late or untouched, with the support
asked for and any change the two agreed
owner: commitment-keeper
after: hold-check-in automation: <level>
rebook-check-in - system: a check-in that did not happen booked
again within <days>, and the manager told
owner: onboarding-manager
after: a check-in date that passes with no
check-in automation: <level>
ask-new-hire - runs collect-and-report: a few questions about
how the start went, asked in private at <days>
and at <days>, and read by <your HR business
partner role>, and by the manager only where
the new hire agrees
owner: onboarding-manager
after: set-check-ins automation: <level>
confirm-terms - runs assessment: the date the probation closes,
the notice and the steps the contract and <your
jurisdiction's rules on probation> set, and any
change to the date from a leave, read from the
employee record
owner: employee-record-keeper
after: take-in-hire, when the contract sets a
probation period automation: <level>
prepare-review - runs collect-and-report: the plan, the record
of each check-in, the support given and the
probation terms, for the manager <days> before
the probation closes, with no recommendation on
the outcome
owner: onboarding-manager
after: record-check-in + confirm-terms
automation: <level>
decide-probation - convenes decide-and-announce: the manager
confirms, extends or ends the probation with
<your HR business partner role> on the evidence
of the work, before the date it closes, with an
end read first against the contract and <your
jurisdiction's rules on ending employment in a
probation period>
owner: <your manager role>
after: prepare-review
by: <the date the probation closes>
automation: never
deliver-outcome - convenes briefing: the manager tells the new
hire the outcome in a conversation, with <your
HR business partner role> present for an
extension or an end, and the letter drafted
from <your letter template> follows it
owner: <your manager role>
after: decide-probation automation: never
record-outcome - system: the outcome, the person who decided,
the date and the letter, on the employee record
owner: employee-record-keeper
after: deliver-outcome automation: <level>
hand-to-offboarding - human: the last day and the outcome passed to
ref/hr/offboard-a-leaver, with the notice the
contract and <your jurisdiction's rules> set
owner: employee-record-keeper
after: record-outcome, when the probation ended
the employment automation: <level>
close-plan - runs roll-call: every objective closed as met,
carried into ref/hr/run-the-performance-review
with its owner, or closed with the employment,
and the plan closed at its final version
owner: commitment-keeper
after: record-outcome, and hand-to-offboarding
when it ran, or record-check-in after the last
check-in where no probation applies
automation: <level>
record-learning - convenes debrief: what helped the new hire,
what was missing, which check-ins slipped, and
what the next plan for the first months does
differently
owner: onboarding-manager
after: close-plan automation: <level>
run-scoped:
check-ins - runs roll-call owner: commitment-keeper
every: <cadence>
from: set-check-ins until: close-plan
probation-date - runs roll-call owner: employee-record-keeper
every: <cadence>
from: confirm-terms until: record-outcome
handoffs:
take-in-hire -> draft-plan / confirm-terms [new-hire]: the job, the
manager, the start date, the briefing and any probation period
draft-plan -> agree-plan [draft-plan]: the objectives, the support and
the check-in dates, at a version
agree-plan -> load-plan [agreed-plan]: the plan as both agreed it, at
its version
load-plan -> set-check-ins [tracked-plan]: each objective with one
owner, one date and a state
set-check-ins -> hold-check-in / ask-new-hire [check-in-dates]: each
check-in date, on both calendars
hold-check-in -> record-check-in [check-in-held]: what the two read
and what they agreed
record-check-in -> prepare-review / close-plan [check-in-record]: each
objective's state after the check-in, and the support asked for
confirm-terms -> prepare-review [probation-terms]: the closing date,
the notice and the steps, with the clause behind each
prepare-review -> decide-probation [review-pack]: the plan, the
check-ins, the support given and the terms
decide-probation -> deliver-outcome [probation-decision]: the outcome,
the reasons drawn from the evidence of the work, and the person who
decided
deliver-outcome -> record-outcome [outcome-delivered]: the date of the
conversation and the letter as sent
record-outcome -> hand-to-offboarding / close-plan [recorded-outcome]:
the outcome on the employee record, with its date
hand-to-offboarding -> close-plan [leaving-started]: the leaving run
started, with the last day
ask-new-hire -> record-learning [start-feedback]: what the HR business
partner takes from the answers, with nothing that names the new hire
close-plan -> record-learning [closed-plan]: every objective closed or
carried on, with its owner
deviations:
hold-check-in -> rebook-check-in [check-in-missed]: a check-in does not
happen on its date, so it is booked again and the manager is told
rebook-check-in -> hold-check-in [check-in-rebooked]: the check-in has
a new date, so it is held like any other
record-check-in -> hold-check-in [more-check-ins]: check-ins remain in
the plan, so the next one is held on its date
decide-probation -> agree-plan [probation-extended]: the probation is
extended, so the manager and the new hire agree a plan for the
extension with its own objectives, check-ins and closing date
record-outcome -> hand-to-offboarding [employment-ends]: the probation
ended the employment, so the leaving starts at
ref/hr/offboard-a-leaver
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the manager, the new hire, the HR
business partner, the head of HR and counsel>
systems: the HR system (write), the commitment tracker (write), the
calendar (write), the survey tool (write), the notification
channel (write)
data: the plan for the first months <version>, the employment
contract <version>, <your probation policy> <version>, <your
jurisdiction's rules on probation> <version>, <your letter
template> <version>, <your record retention schedule>
<version>
policy:
the probation decision, an extension and an end are made by <your
manager role> with <your HR business partner role>, and never by an
agent
the review pack sets out the plan, the check-ins and the support
given, and carries no recommendation on the outcome
the plan and the check-ins record the work and the support, and
nothing about health, family or the reason for a leave
agents never weigh a protected characteristic in anything they do
about a new hire
a probation decision never rests on a concern the new hire raised, a
leave they took or a request for an adjustment
the plan is open only to the new hire, the manager and <your HR
business partner role>
the private answers about the start are read by <your HR business
partner role>, and by the manager only where the new hire agrees
a probation is extended only where the contract and <your
jurisdiction's rules on probation> allow, once, for at most <weeks>
where the closing date passes with no decision, the probation is
treated as <your contract's rule on a probation that closes without
a decision>, and the miss is reported to <who>
an end is told to the new hire by the manager in a conversation with
<your HR business partner role> present, and the letter follows the
same day
measures:
cycle time: <days> from the start to the agreed plan
on time: <target> share of probations decided before the date they
close
volume: <new hires in their first months per period>
quality gate: every outcome names who decided it and rests on the plan
and the check-ins on the employee record
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
396 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: new hire first months id: <team>/run-a-new-hires-first-months v1
from: ref/hr/run-a-new-hires-first-months v1
owner: <who> effective: <date>
trigger: the new hire is handed on from ref/hr/prepare-for-a-new-hire on
the first day, in <your HR system>
watch: record=<employee record> system=<your HR system>
change=<the first day is confirmed>
concurrency: runs may overlap freely - one new hire is one run, and an
extended probation keeps the same run with a new plan
goal: the plan for the first months agreed within <days> of the start,
every check-in held on its date or moved with a reason, and the
plan closed with a recorded outcome, which, where the contract
sets a probation period, is the manager's decision to confirm,
extend or end it, made before the date it closes
phases:
take-in-hire - system: the job, the manager, the start date,
the manager's briefing from the preparation,
and any probation period the contract sets
owner: onboarding-manager after: trigger
automation: <level>
draft-plan - human: objectives for the first weeks and
months drawn from the job and the briefing, the
people to meet, the support the company gives,
and check-in dates on <your check-in cadence>
owner: onboarding-manager
after: take-in-hire automation: <level>
agree-plan - convenes decide-and-announce: the manager and
the new hire agree the objectives, the support
and the check-in dates, and both can read the
plan at its version
owner: <your manager role>
after: draft-plan by: <days>
automation: never
load-plan - system: each objective as an item with one
owner, one date and a state, in a record open
only to the new hire, the manager and <your HR
business partner role>
owner: commitment-keeper
after: agree-plan automation: <level>
set-check-ins - system: each check-in on both calendars, with
the date the probation closes shown where one
applies
owner: commitment-keeper
after: load-plan automation: <level>
hold-check-in - convenes briefing: the manager and the new hire
read the plan together, say what is going well
and what is not, and agree any change of
support
owner: <your manager role>
after: set-check-ins, and record-check-in while
check-ins remain automation: never
record-check-in - runs roll-call: each objective read as met,
running, late or untouched, with the support
asked for and any change the two agreed
owner: commitment-keeper
after: hold-check-in automation: <level>
rebook-check-in - system: a check-in that did not happen booked
again within <days>, and the manager told
owner: onboarding-manager
after: a check-in date that passes with no
check-in automation: <level>
ask-new-hire - runs collect-and-report: a few questions about
how the start went, asked in private at <days>
and at <days>, and read by <your HR business
partner role>, and by the manager only where
the new hire agrees
owner: onboarding-manager
after: set-check-ins automation: <level>
confirm-terms - runs assessment: the date the probation closes,
the notice and the steps the contract and <your
jurisdiction's rules on probation> set, and any
change to the date from a leave, read from the
employee record
owner: employee-record-keeper
after: take-in-hire, when the contract sets a
probation period automation: <level>
prepare-review - runs collect-and-report: the plan, the record
of each check-in, the support given and the
probation terms, for the manager <days> before
the probation closes, with no recommendation on
the outcome
owner: onboarding-manager
after: record-check-in + confirm-terms
automation: <level>
decide-probation - convenes decide-and-announce: the manager
confirms, extends or ends the probation with
<your HR business partner role> on the evidence
of the work, before the date it closes, with an
end read first against the contract and <your
jurisdiction's rules on ending employment in a
probation period>
owner: <your manager role>
after: prepare-review
by: <the date the probation closes>
automation: never
deliver-outcome - convenes briefing: the manager tells the new
hire the outcome in a conversation, with <your
HR business partner role> present for an
extension or an end, and the letter drafted
from <your letter template> follows it
owner: <your manager role>
after: decide-probation automation: never
record-outcome - system: the outcome, the person who decided,
the date and the letter, on the employee record
owner: employee-record-keeper
after: deliver-outcome automation: <level>
hand-to-offboarding - human: the last day and the outcome passed to
ref/hr/offboard-a-leaver, with the notice the
contract and <your jurisdiction's rules> set
owner: employee-record-keeper
after: record-outcome, when the probation ended
the employment automation: <level>
close-plan - runs roll-call: every objective closed as met,
carried into ref/hr/run-the-performance-review
with its owner, or closed with the employment,
and the plan closed at its final version
owner: commitment-keeper
after: record-outcome, and hand-to-offboarding
when it ran, or record-check-in after the last
check-in where no probation applies
automation: <level>
record-learning - convenes debrief: what helped the new hire,
what was missing, which check-ins slipped, and
what the next plan for the first months does
differently
owner: onboarding-manager
after: close-plan automation: <level>
run-scoped:
check-ins - runs roll-call owner: commitment-keeper
every: <cadence>
from: set-check-ins until: close-plan
probation-date - runs roll-call owner: employee-record-keeper
every: <cadence>
from: confirm-terms until: record-outcome
handoffs:
take-in-hire -> draft-plan / confirm-terms [new-hire]: the job, the
manager, the start date, the briefing and any probation period
draft-plan -> agree-plan [draft-plan]: the objectives, the support and
the check-in dates, at a version
agree-plan -> load-plan [agreed-plan]: the plan as both agreed it, at
its version
load-plan -> set-check-ins [tracked-plan]: each objective with one
owner, one date and a state
set-check-ins -> hold-check-in / ask-new-hire [check-in-dates]: each
check-in date, on both calendars
hold-check-in -> record-check-in [check-in-held]: what the two read
and what they agreed
record-check-in -> prepare-review / close-plan [check-in-record]: each
objective's state after the check-in, and the support asked for
confirm-terms -> prepare-review [probation-terms]: the closing date,
the notice and the steps, with the clause behind each
prepare-review -> decide-probation [review-pack]: the plan, the
check-ins, the support given and the terms
decide-probation -> deliver-outcome [probation-decision]: the outcome,
the reasons drawn from the evidence of the work, and the person who
decided
deliver-outcome -> record-outcome [outcome-delivered]: the date of the
conversation and the letter as sent
record-outcome -> hand-to-offboarding / close-plan [recorded-outcome]:
the outcome on the employee record, with its date
hand-to-offboarding -> close-plan [leaving-started]: the leaving run
started, with the last day
ask-new-hire -> record-learning [start-feedback]: what the HR business
partner takes from the answers, with nothing that names the new hire
close-plan -> record-learning [closed-plan]: every objective closed or
carried on, with its owner
deviations:
hold-check-in -> rebook-check-in [check-in-missed]: a check-in does not
happen on its date, so it is booked again and the manager is told
rebook-check-in -> hold-check-in [check-in-rebooked]: the check-in has
a new date, so it is held like any other
record-check-in -> hold-check-in [more-check-ins]: check-ins remain in
the plan, so the next one is held on its date
decide-probation -> agree-plan [probation-extended]: the probation is
extended, so the manager and the new hire agree a plan for the
extension with its own objectives, check-ins and closing date
record-outcome -> hand-to-offboarding [employment-ends]: the probation
ended the employment, so the leaving starts at
ref/hr/offboard-a-leaver
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the manager, the new hire, the HR
business partner, the head of HR and counsel>
systems: the HR system (write), the commitment tracker (write), the
calendar (write), the survey tool (write), the notification
channel (write)
data: the plan for the first months <version>, the employment
contract <version>, <your probation policy> <version>, <your
jurisdiction's rules on probation> <version>, <your letter
template> <version>, <your record retention schedule>
<version>
policy:
the probation decision, an extension and an end are made by <your
manager role> with <your HR business partner role>, and never by an
agent
the review pack sets out the plan, the check-ins and the support
given, and carries no recommendation on the outcome
the plan and the check-ins record the work and the support, and
nothing about health, family or the reason for a leave
agents never weigh a protected characteristic in anything they do
about a new hire
a probation decision never rests on a concern the new hire raised, a
leave they took or a request for an adjustment
the plan is open only to the new hire, the manager and <your HR
business partner role>
the private answers about the start are read by <your HR business
partner role>, and by the manager only where the new hire agrees
a probation is extended only where the contract and <your
jurisdiction's rules on probation> allow, once, for at most <weeks>
where the closing date passes with no decision, the probation is
treated as <your contract's rule on a probation that closes without
a decision>, and the miss is reported to <who>
an end is told to the new hire by the manager in a conversation with
<your HR business partner role> present, and the letter follows the
same day
measures:
cycle time: <days> from the start to the agreed plan
on time: <target> share of probations decided before the date they
close
volume: <new hires in their first months per period>
quality gate: every outcome names who decided it and rests on the plan
and the check-ins on the employee record
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
52 blanks to fill. Everything else is the process.
this process
from: ref/hr/run-a-new-hires-first-months v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.