Once a year, or when the holder of a key role gives notice, the leaders review the roles whose loss would hurt the company most. The workforce-planner agent lists the key roles from the workforce plan for the executive team to confirm, and the leader over each role writes down what a successor must bring to it. The career-planner agent asks each manager to record who could step into each role and how ready each one is, with the evidence of the work behind each view, reads the career interest each named person wrote in their own development plan, and prepares the review pack. The decision-coordinator agent sends the pack ahead and runs the succession review, where the leaders agree the possible successors and their readiness for each role, and it records what was agreed and who disagreed. Each gap then becomes a development action in a successor's plan, agreed with that person, or a hiring need in the workforce plan. The run closes when every key role has its possible successors named with their readiness, or its gap named with an action, an owner and a date, and the next review is set.

The goals
  • Name a ready-now successor for 60% of key roles
  • Fill 70% of key roles that open from the named successors
  • See 85% of successors who step in meet expectations at their first review
  • Give every gap an action with an owner and a date within 30 days of the review

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

15 activities from the yearly review falls due, or the holder of a key role gives notice to every key role has its successors and their readiness agreed, or its gap named with an action, 2 of them gates a person has to sign.

Plan Succession for Key Rolesthe yearly review falls due, or the holder of a key role gives notice → every key role has its successors and their readiness agreed, or its gap named with an action
a readiness view has no evidence behinditthe leaders cannot agree a readiness onthe evidencethe yearly review falls due,or the holder of a key rolegives notice1Open the Succession Reviewthe date, the leaders taking partand the readiness scale2List the Key Rolesroles whose loss would hurt most,from the workforce plan3Write What Each Key RoleNeedsthe experience and skills asuccessor must bring4Ask Managers for PossibleSuccessorseach manager asked who could stepinto each role5Record Readiness with ItsEvidenceeach person named, how ready, andthe work behind the viewa person signs · never an agent6Read Each Person's CareerInterestwhat each named person wrote intheir development plan7Prepare the Review Packeach role, its possiblesuccessors, their readiness andgaps8Send the Pack Aheadthe leaders read the pack beforethe review9Hold the Succession Reviewthe leaders agree each role'ssuccessors and their readinessa person signs · never an agent10Record the Succession Planeach role, its successors, theirreadiness and any dissent11Name the Roles with No ReadySuccessoreach gap, and each developmentneed behind a readiness view12Add Development Actionseach successor's actions, agreedwith them, in their plan13Add Hiring Needs to theWorkforce Planroles with no internal successorbecome hiring needs14Set the Next Reviewthe date the plan comes back up,and what brings it forward15Record What the Review Taughtwhich roles lacked successors, andwhyevery key role has itssuccessors and their readinessagreed, or its gap named withan action
The roster this process needs
decision-coordinator 6 career-planner 6 head of HR 3 manager 3 workforce-planner 2 executive team 2 leader over the role 1 employee 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: plan succession   id: <team>/plan-succession-for-key-roles   v1
from: ref/hr/plan-succession-for-key-roles v1
owner: <who>                          effective: <date>
trigger: the yearly review falls due on <your succession calendar>, or
         the holder of a key role gives notice, or <who> asks for one
         role to be reviewed, in <your HR system>
         watch: record=<succession review> system=<your HR system>
                change=<the review falls due, or the holder of a key
                role gives notice>
concurrency: one company-wide review a year - a review of a single role
             whose holder has given notice runs alongside it and starts
             from the last version of the plan
goal: every key role has its possible successors and their readiness
      agreed by the leaders, with the evidence of the work behind each
      view, or its gap named with a development action or a hiring
      need that has an owner and a date, and the next review is set
      for <date>
phases:
  open-review             - convenes briefing: the review's date, the
                            leaders taking part, the roles in scope and
                            the readiness scale at a version, sent to
                            every leader and manager who will record a
                            view
                            owner: decision-coordinator
                            after: trigger            automation: <level>
  list-key-roles          - runs collect-and-report: the roles whose loss
                            would hurt the company most, read from the
                            workforce plan with each role's holder and
                            team, for the executive team to confirm
                            owner: workforce-planner
                            after: open-review        automation: <level>
  write-role-needs        - human: the experience, skills and knowledge a
                            successor must bring to each key role,
                            written by the leader over the role at a
                            version
                            owner: <your executive role>
                            after: list-key-roles     by: <days>
                            automation: <level>
  ask-for-successors      - runs collect-and-report: each manager asked
                            to name the people who could step into each
                            key role, with the role's needs and the
                            readiness scale
                            owner: career-planner
                            after: write-role-needs   by: <days>
                            automation: <level>
  record-readiness        - human: each possible successor named with a
                            readiness on <your readiness scale>, such as
                            ready now, ready within <time> or ready
                            later, and the evidence of the work behind
                            each view
                            owner: <your manager role>
                            after: ask-for-successors
                            automation: never
  read-interest           - runs collect-and-report: the career interest
                            each named person wrote in their own
                            development plan, read for the roles they are
                            named for
                            owner: career-planner
                            after: record-readiness   automation: <level>
  prepare-pack            - runs collect-and-report: each key role, its
                            needs, its possible successors with their
                            readiness, evidence and stated interest, and
                            the roles with no successor, with no pay,
                            health, leave, case record or protected
                            characteristic in it
                            owner: career-planner
                            after: read-interest      automation: <level>
  send-pack               - convenes briefing: the pack sent to every
                            leader <days> before the review, held where
                            only <the named leaders> can open it
                            owner: decision-coordinator
                            after: prepare-pack       automation: <level>
  hold-review             - convenes decide-and-announce: the leaders go
                            through each key role, question the readiness
                            views, and agree the possible successors and
                            their readiness for each
                            owner: <your succession review chair role>
                            after: send-pack          by: <days>
                            automation: never
  record-plan             - runs collect-and-report: the succession plan
                            at a version, each role with its agreed
                            successors, their readiness and any dissent,
                            confirmed by the chair
                            owner: decision-coordinator
                            after: hold-review        automation: <level>
  name-gaps               - runs assessment: each key role with no
                            successor ready within <time>, and each
                            successor whose readiness waits on a named
                            development need
                            owner: career-planner
                            after: record-plan        automation: <level>
  add-development-actions - human: each successor's development actions,
                            agreed with the person and the manager and
                            added to the person's development plan with
                            an owner and a date
                            owner: career-planner
                            after: name-gaps          automation: <level>
  add-hiring-needs        - human: each role with no internal successor
                            added to the workforce plan as a hiring need
                            with its date, for approval through
                            ref/hr/plan-the-workforce or
                            ref/hr/open-a-position
                            owner: workforce-planner
                            after: name-gaps          automation: <level>
  set-next-review         - system: the date the plan comes back up, and
                            the events that bring it forward, such as the
                            holder of a key role giving notice
                            owner: decision-coordinator
                            after: add-development-actions +
                            add-hiring-needs          automation: <level>
  record-learning         - convenes debrief: which roles had no
                            successor and why, which readiness views the
                            leaders changed, how past successors did when
                            they stepped in, and what the next review
                            does differently
                            owner: decision-coordinator
                            after: set-next-review    automation: <level>
run-scoped:
  clock - runs roll-call                     owner: decision-coordinator
          every: <cadence>
          from: open-review     until: hold-review
handoffs:
  open-review -> list-key-roles [review-plan]: the date, the leaders,
    the roles in scope and the readiness scale
  list-key-roles -> write-role-needs [key-roles]: each key role, its
    holder and its team, as the executive team confirmed them
  write-role-needs -> ask-for-successors [role-needs]: what a successor
    must bring to each role, at a version
  ask-for-successors -> record-readiness [successor-request]: the roles
    each manager is asked about, with their needs and the scale
  record-readiness -> read-interest [readiness-views]: each person named,
    the readiness and the evidence behind it
  read-interest -> prepare-pack [stated-interest]: the career interest
    each named person recorded, as they wrote it
  prepare-pack -> send-pack [review-pack]: every key role with its
    successors, their readiness and evidence, and the gaps
  send-pack -> hold-review [pack-sent]: the pack, and the date each
    leader received it
  hold-review -> record-plan [agreed-successors]: each role's successors
    and their readiness as the leaders agreed them, and any dissent
  record-plan -> name-gaps [succession-plan]: the plan at a version,
    confirmed by the chair
  name-gaps -> add-development-actions / add-hiring-needs
    [succession-gaps]: each role with no ready successor, and each
    development need behind a readiness view
  add-development-actions -> set-next-review [development-actions]: each
    action with its owner and date, and the person's agreement
  add-hiring-needs -> set-next-review [hiring-needs]: each need in the
    workforce plan with its date
  set-next-review -> record-learning [next-review]: the date, and the
    events that bring it forward
deviations:
  prepare-pack -> record-readiness [view-without-evidence]: a readiness
    view has no evidence of the work behind it, so it goes back to the
    manager before the pack goes out
  hold-review -> record-readiness [leaders-need-evidence]: the leaders
    cannot agree a readiness on the evidence, so the manager adds
    evidence and the role comes back to the leaders by <date>
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the head of HR, the executive
           team, the leaders over each key role, the managers and the
           chair of the review>
  systems: the HR system (read), the workforce plan (write), the
           development plan record (write), the performance review
           system (read), the decision record (write), the calendar
           (write)
  data:    <your succession policy> <version>, <your readiness scale>
           <version>, the workforce plan <version>, <your data
           protection policy> <version>
policy:
  successors and their readiness are agreed by the leaders at the
    review, and no agent names, ranks or scores a successor
  every readiness view rests on evidence of the work the manager wrote
    down
  no step weighs a protected characteristic, and the pack carries no
    pay, health, leave, accommodation or case record
  how soon a key role may open is read only from notice the holder gave
    or plans the holder shared, and never from the holder's age
  the plan is open only to <the named leaders>, and a named successor is
    told <as your succession policy sets>
  a development action enters a person's plan only with that person's
    agreement
  being named on the plan promises no one a role, and a key role that
    opens is filled on the same criteria as any other
  a change to the recorded plan is a new version, and the version it
    replaces is kept
  the plan is kept under <your jurisdiction's rule on keeping employee
    records>
measures:
  cycle time: <weeks> from the review opening to every gap having an
              action
  coverage: <target> share of key roles with a ready-now successor
  volume: <key roles per review>
  quality gate: every successor named has a readiness view with evidence
                behind it, and every gap has an action, an owner and a
                date
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

320 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: plan succession   id: <team>/plan-succession-for-key-roles   v1
from: ref/hr/plan-succession-for-key-roles v1
owner: <who>                          effective: <date>
trigger: the yearly review falls due on <your succession calendar>, or
         the holder of a key role gives notice, or <who> asks for one
         role to be reviewed, in <your HR system>
         watch: record=<succession review> system=<your HR system>
                change=<the review falls due, or the holder of a key
                role gives notice>
concurrency: one company-wide review a year - a review of a single role
             whose holder has given notice runs alongside it and starts
             from the last version of the plan
goal: every key role has its possible successors and their readiness
      agreed by the leaders, with the evidence of the work behind each
      view, or its gap named with a development action or a hiring
      need that has an owner and a date, and the next review is set
      for <date>
phases:
  open-review             - convenes briefing: the review's date, the
                            leaders taking part, the roles in scope and
                            the readiness scale at a version, sent to
                            every leader and manager who will record a
                            view
                            owner: decision-coordinator
                            after: trigger            automation: <level>
  list-key-roles          - runs collect-and-report: the roles whose loss
                            would hurt the company most, read from the
                            workforce plan with each role's holder and
                            team, for the executive team to confirm
                            owner: workforce-planner
                            after: open-review        automation: <level>
  write-role-needs        - human: the experience, skills and knowledge a
                            successor must bring to each key role,
                            written by the leader over the role at a
                            version
                            owner: <your executive role>
                            after: list-key-roles     by: <days>
                            automation: <level>
  ask-for-successors      - runs collect-and-report: each manager asked
                            to name the people who could step into each
                            key role, with the role's needs and the
                            readiness scale
                            owner: career-planner
                            after: write-role-needs   by: <days>
                            automation: <level>
  record-readiness        - human: each possible successor named with a
                            readiness on <your readiness scale>, such as
                            ready now, ready within <time> or ready
                            later, and the evidence of the work behind
                            each view
                            owner: <your manager role>
                            after: ask-for-successors
                            automation: never
  read-interest           - runs collect-and-report: the career interest
                            each named person wrote in their own
                            development plan, read for the roles they are
                            named for
                            owner: career-planner
                            after: record-readiness   automation: <level>
  prepare-pack            - runs collect-and-report: each key role, its
                            needs, its possible successors with their
                            readiness, evidence and stated interest, and
                            the roles with no successor, with no pay,
                            health, leave, case record or protected
                            characteristic in it
                            owner: career-planner
                            after: read-interest      automation: <level>
  send-pack               - convenes briefing: the pack sent to every
                            leader <days> before the review, held where
                            only <the named leaders> can open it
                            owner: decision-coordinator
                            after: prepare-pack       automation: <level>
  hold-review             - convenes decide-and-announce: the leaders go
                            through each key role, question the readiness
                            views, and agree the possible successors and
                            their readiness for each
                            owner: <your succession review chair role>
                            after: send-pack          by: <days>
                            automation: never
  record-plan             - runs collect-and-report: the succession plan
                            at a version, each role with its agreed
                            successors, their readiness and any dissent,
                            confirmed by the chair
                            owner: decision-coordinator
                            after: hold-review        automation: <level>
  name-gaps               - runs assessment: each key role with no
                            successor ready within <time>, and each
                            successor whose readiness waits on a named
                            development need
                            owner: career-planner
                            after: record-plan        automation: <level>
  add-development-actions - human: each successor's development actions,
                            agreed with the person and the manager and
                            added to the person's development plan with
                            an owner and a date
                            owner: career-planner
                            after: name-gaps          automation: <level>
  add-hiring-needs        - human: each role with no internal successor
                            added to the workforce plan as a hiring need
                            with its date, for approval through
                            ref/hr/plan-the-workforce or
                            ref/hr/open-a-position
                            owner: workforce-planner
                            after: name-gaps          automation: <level>
  set-next-review         - system: the date the plan comes back up, and
                            the events that bring it forward, such as the
                            holder of a key role giving notice
                            owner: decision-coordinator
                            after: add-development-actions +
                            add-hiring-needs          automation: <level>
  record-learning         - convenes debrief: which roles had no
                            successor and why, which readiness views the
                            leaders changed, how past successors did when
                            they stepped in, and what the next review
                            does differently
                            owner: decision-coordinator
                            after: set-next-review    automation: <level>
run-scoped:
  clock - runs roll-call                     owner: decision-coordinator
          every: <cadence>
          from: open-review     until: hold-review
handoffs:
  open-review -> list-key-roles [review-plan]: the date, the leaders,
    the roles in scope and the readiness scale
  list-key-roles -> write-role-needs [key-roles]: each key role, its
    holder and its team, as the executive team confirmed them
  write-role-needs -> ask-for-successors [role-needs]: what a successor
    must bring to each role, at a version
  ask-for-successors -> record-readiness [successor-request]: the roles
    each manager is asked about, with their needs and the scale
  record-readiness -> read-interest [readiness-views]: each person named,
    the readiness and the evidence behind it
  read-interest -> prepare-pack [stated-interest]: the career interest
    each named person recorded, as they wrote it
  prepare-pack -> send-pack [review-pack]: every key role with its
    successors, their readiness and evidence, and the gaps
  send-pack -> hold-review [pack-sent]: the pack, and the date each
    leader received it
  hold-review -> record-plan [agreed-successors]: each role's successors
    and their readiness as the leaders agreed them, and any dissent
  record-plan -> name-gaps [succession-plan]: the plan at a version,
    confirmed by the chair
  name-gaps -> add-development-actions / add-hiring-needs
    [succession-gaps]: each role with no ready successor, and each
    development need behind a readiness view
  add-development-actions -> set-next-review [development-actions]: each
    action with its owner and date, and the person's agreement
  add-hiring-needs -> set-next-review [hiring-needs]: each need in the
    workforce plan with its date
  set-next-review -> record-learning [next-review]: the date, and the
    events that bring it forward
deviations:
  prepare-pack -> record-readiness [view-without-evidence]: a readiness
    view has no evidence of the work behind it, so it goes back to the
    manager before the pack goes out
  hold-review -> record-readiness [leaders-need-evidence]: the leaders
    cannot agree a readiness on the evidence, so the manager adds
    evidence and the role comes back to the leaders by <date>
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the head of HR, the executive
           team, the leaders over each key role, the managers and the
           chair of the review>
  systems: the HR system (read), the workforce plan (write), the
           development plan record (write), the performance review
           system (read), the decision record (write), the calendar
           (write)
  data:    <your succession policy> <version>, <your readiness scale>
           <version>, the workforce plan <version>, <your data
           protection policy> <version>
policy:
  successors and their readiness are agreed by the leaders at the
    review, and no agent names, ranks or scores a successor
  every readiness view rests on evidence of the work the manager wrote
    down
  no step weighs a protected characteristic, and the pack carries no
    pay, health, leave, accommodation or case record
  how soon a key role may open is read only from notice the holder gave
    or plans the holder shared, and never from the holder's age
  the plan is open only to <the named leaders>, and a named successor is
    told <as your succession policy sets>
  a development action enters a person's plan only with that person's
    agreement
  being named on the plan promises no one a role, and a key role that
    opens is filled on the same criteria as any other
  a change to the recorded plan is a new version, and the version it
    replaces is kept
  the plan is kept under <your jurisdiction's rule on keeping employee
    records>
measures:
  cycle time: <weeks> from the review opening to every gap having an
              action
  coverage: <target> share of key roles with a ready-now successor
  volume: <key roles per review>
  quality gate: every successor named has a readiness view with evidence
                behind it, and every gap has an action, an owner and a
                date
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

375 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: plan succession   id: <team>/plan-succession-for-key-roles   v1
from: ref/hr/plan-succession-for-key-roles v1
owner: <who>                          effective: <date>
trigger: the yearly review falls due on <your succession calendar>, or
         the holder of a key role gives notice, or <who> asks for one
         role to be reviewed, in <your HR system>
         watch: record=<succession review> system=<your HR system>
                change=<the review falls due, or the holder of a key
                role gives notice>
concurrency: one company-wide review a year - a review of a single role
             whose holder has given notice runs alongside it and starts
             from the last version of the plan
goal: every key role has its possible successors and their readiness
      agreed by the leaders, with the evidence of the work behind each
      view, or its gap named with a development action or a hiring
      need that has an owner and a date, and the next review is set
      for <date>
phases:
  open-review             - convenes briefing: the review's date, the
                            leaders taking part, the roles in scope and
                            the readiness scale at a version, sent to
                            every leader and manager who will record a
                            view
                            owner: decision-coordinator
                            after: trigger            automation: <level>
  list-key-roles          - runs collect-and-report: the roles whose loss
                            would hurt the company most, read from the
                            workforce plan with each role's holder and
                            team, for the executive team to confirm
                            owner: workforce-planner
                            after: open-review        automation: <level>
  write-role-needs        - human: the experience, skills and knowledge a
                            successor must bring to each key role,
                            written by the leader over the role at a
                            version
                            owner: <your executive role>
                            after: list-key-roles     by: <days>
                            automation: <level>
  ask-for-successors      - runs collect-and-report: each manager asked
                            to name the people who could step into each
                            key role, with the role's needs and the
                            readiness scale
                            owner: career-planner
                            after: write-role-needs   by: <days>
                            automation: <level>
  record-readiness        - human: each possible successor named with a
                            readiness on <your readiness scale>, such as
                            ready now, ready within <time> or ready
                            later, and the evidence of the work behind
                            each view
                            owner: <your manager role>
                            after: ask-for-successors
                            automation: never
  read-interest           - runs collect-and-report: the career interest
                            each named person wrote in their own
                            development plan, read for the roles they are
                            named for
                            owner: career-planner
                            after: record-readiness   automation: <level>
  prepare-pack            - runs collect-and-report: each key role, its
                            needs, its possible successors with their
                            readiness, evidence and stated interest, and
                            the roles with no successor, with no pay,
                            health, leave, case record or protected
                            characteristic in it
                            owner: career-planner
                            after: read-interest      automation: <level>
  send-pack               - convenes briefing: the pack sent to every
                            leader <days> before the review, held where
                            only <the named leaders> can open it
                            owner: decision-coordinator
                            after: prepare-pack       automation: <level>
  hold-review             - convenes decide-and-announce: the leaders go
                            through each key role, question the readiness
                            views, and agree the possible successors and
                            their readiness for each
                            owner: <your succession review chair role>
                            after: send-pack          by: <days>
                            automation: never
  record-plan             - runs collect-and-report: the succession plan
                            at a version, each role with its agreed
                            successors, their readiness and any dissent,
                            confirmed by the chair
                            owner: decision-coordinator
                            after: hold-review        automation: <level>
  name-gaps               - runs assessment: each key role with no
                            successor ready within <time>, and each
                            successor whose readiness waits on a named
                            development need
                            owner: career-planner
                            after: record-plan        automation: <level>
  add-development-actions - human: each successor's development actions,
                            agreed with the person and the manager and
                            added to the person's development plan with
                            an owner and a date
                            owner: career-planner
                            after: name-gaps          automation: <level>
  add-hiring-needs        - human: each role with no internal successor
                            added to the workforce plan as a hiring need
                            with its date, for approval through
                            ref/hr/plan-the-workforce or
                            ref/hr/open-a-position
                            owner: workforce-planner
                            after: name-gaps          automation: <level>
  set-next-review         - system: the date the plan comes back up, and
                            the events that bring it forward, such as the
                            holder of a key role giving notice
                            owner: decision-coordinator
                            after: add-development-actions +
                            add-hiring-needs          automation: <level>
  record-learning         - convenes debrief: which roles had no
                            successor and why, which readiness views the
                            leaders changed, how past successors did when
                            they stepped in, and what the next review
                            does differently
                            owner: decision-coordinator
                            after: set-next-review    automation: <level>
run-scoped:
  clock - runs roll-call                     owner: decision-coordinator
          every: <cadence>
          from: open-review     until: hold-review
handoffs:
  open-review -> list-key-roles [review-plan]: the date, the leaders,
    the roles in scope and the readiness scale
  list-key-roles -> write-role-needs [key-roles]: each key role, its
    holder and its team, as the executive team confirmed them
  write-role-needs -> ask-for-successors [role-needs]: what a successor
    must bring to each role, at a version
  ask-for-successors -> record-readiness [successor-request]: the roles
    each manager is asked about, with their needs and the scale
  record-readiness -> read-interest [readiness-views]: each person named,
    the readiness and the evidence behind it
  read-interest -> prepare-pack [stated-interest]: the career interest
    each named person recorded, as they wrote it
  prepare-pack -> send-pack [review-pack]: every key role with its
    successors, their readiness and evidence, and the gaps
  send-pack -> hold-review [pack-sent]: the pack, and the date each
    leader received it
  hold-review -> record-plan [agreed-successors]: each role's successors
    and their readiness as the leaders agreed them, and any dissent
  record-plan -> name-gaps [succession-plan]: the plan at a version,
    confirmed by the chair
  name-gaps -> add-development-actions / add-hiring-needs
    [succession-gaps]: each role with no ready successor, and each
    development need behind a readiness view
  add-development-actions -> set-next-review [development-actions]: each
    action with its owner and date, and the person's agreement
  add-hiring-needs -> set-next-review [hiring-needs]: each need in the
    workforce plan with its date
  set-next-review -> record-learning [next-review]: the date, and the
    events that bring it forward
deviations:
  prepare-pack -> record-readiness [view-without-evidence]: a readiness
    view has no evidence of the work behind it, so it goes back to the
    manager before the pack goes out
  hold-review -> record-readiness [leaders-need-evidence]: the leaders
    cannot agree a readiness on the evidence, so the manager adds
    evidence and the role comes back to the leaders by <date>
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the head of HR, the executive
           team, the leaders over each key role, the managers and the
           chair of the review>
  systems: the HR system (read), the workforce plan (write), the
           development plan record (write), the performance review
           system (read), the decision record (write), the calendar
           (write)
  data:    <your succession policy> <version>, <your readiness scale>
           <version>, the workforce plan <version>, <your data
           protection policy> <version>
policy:
  successors and their readiness are agreed by the leaders at the
    review, and no agent names, ranks or scores a successor
  every readiness view rests on evidence of the work the manager wrote
    down
  no step weighs a protected characteristic, and the pack carries no
    pay, health, leave, accommodation or case record
  how soon a key role may open is read only from notice the holder gave
    or plans the holder shared, and never from the holder's age
  the plan is open only to <the named leaders>, and a named successor is
    told <as your succession policy sets>
  a development action enters a person's plan only with that person's
    agreement
  being named on the plan promises no one a role, and a key role that
    opens is filled on the same criteria as any other
  a change to the recorded plan is a new version, and the version it
    replaces is kept
  the plan is kept under <your jurisdiction's rule on keeping employee
    records>
measures:
  cycle time: <weeks> from the review opening to every gap having an
              action
  coverage: <target> share of key roles with a ready-now successor
  volume: <key roles per review>
  quality gate: every successor named has a readiness view with evidence
                behind it, and every gap has an action, an owner and a
                date
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

380 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: plan succession   id: <team>/plan-succession-for-key-roles   v1
from: ref/hr/plan-succession-for-key-roles v1
owner: <who>                          effective: <date>
trigger: the yearly review falls due on <your succession calendar>, or
         the holder of a key role gives notice, or <who> asks for one
         role to be reviewed, in <your HR system>
         watch: record=<succession review> system=<your HR system>
                change=<the review falls due, or the holder of a key
                role gives notice>
concurrency: one company-wide review a year - a review of a single role
             whose holder has given notice runs alongside it and starts
             from the last version of the plan
goal: every key role has its possible successors and their readiness
      agreed by the leaders, with the evidence of the work behind each
      view, or its gap named with a development action or a hiring
      need that has an owner and a date, and the next review is set
      for <date>
phases:
  open-review             - convenes briefing: the review's date, the
                            leaders taking part, the roles in scope and
                            the readiness scale at a version, sent to
                            every leader and manager who will record a
                            view
                            owner: decision-coordinator
                            after: trigger            automation: <level>
  list-key-roles          - runs collect-and-report: the roles whose loss
                            would hurt the company most, read from the
                            workforce plan with each role's holder and
                            team, for the executive team to confirm
                            owner: workforce-planner
                            after: open-review        automation: <level>
  write-role-needs        - human: the experience, skills and knowledge a
                            successor must bring to each key role,
                            written by the leader over the role at a
                            version
                            owner: <your executive role>
                            after: list-key-roles     by: <days>
                            automation: <level>
  ask-for-successors      - runs collect-and-report: each manager asked
                            to name the people who could step into each
                            key role, with the role's needs and the
                            readiness scale
                            owner: career-planner
                            after: write-role-needs   by: <days>
                            automation: <level>
  record-readiness        - human: each possible successor named with a
                            readiness on <your readiness scale>, such as
                            ready now, ready within <time> or ready
                            later, and the evidence of the work behind
                            each view
                            owner: <your manager role>
                            after: ask-for-successors
                            automation: never
  read-interest           - runs collect-and-report: the career interest
                            each named person wrote in their own
                            development plan, read for the roles they are
                            named for
                            owner: career-planner
                            after: record-readiness   automation: <level>
  prepare-pack            - runs collect-and-report: each key role, its
                            needs, its possible successors with their
                            readiness, evidence and stated interest, and
                            the roles with no successor, with no pay,
                            health, leave, case record or protected
                            characteristic in it
                            owner: career-planner
                            after: read-interest      automation: <level>
  send-pack               - convenes briefing: the pack sent to every
                            leader <days> before the review, held where
                            only <the named leaders> can open it
                            owner: decision-coordinator
                            after: prepare-pack       automation: <level>
  hold-review             - convenes decide-and-announce: the leaders go
                            through each key role, question the readiness
                            views, and agree the possible successors and
                            their readiness for each
                            owner: <your succession review chair role>
                            after: send-pack          by: <days>
                            automation: never
  record-plan             - runs collect-and-report: the succession plan
                            at a version, each role with its agreed
                            successors, their readiness and any dissent,
                            confirmed by the chair
                            owner: decision-coordinator
                            after: hold-review        automation: <level>
  name-gaps               - runs assessment: each key role with no
                            successor ready within <time>, and each
                            successor whose readiness waits on a named
                            development need
                            owner: career-planner
                            after: record-plan        automation: <level>
  add-development-actions - human: each successor's development actions,
                            agreed with the person and the manager and
                            added to the person's development plan with
                            an owner and a date
                            owner: career-planner
                            after: name-gaps          automation: <level>
  add-hiring-needs        - human: each role with no internal successor
                            added to the workforce plan as a hiring need
                            with its date, for approval through
                            ref/hr/plan-the-workforce or
                            ref/hr/open-a-position
                            owner: workforce-planner
                            after: name-gaps          automation: <level>
  set-next-review         - system: the date the plan comes back up, and
                            the events that bring it forward, such as the
                            holder of a key role giving notice
                            owner: decision-coordinator
                            after: add-development-actions +
                            add-hiring-needs          automation: <level>
  record-learning         - convenes debrief: which roles had no
                            successor and why, which readiness views the
                            leaders changed, how past successors did when
                            they stepped in, and what the next review
                            does differently
                            owner: decision-coordinator
                            after: set-next-review    automation: <level>
run-scoped:
  clock - runs roll-call                     owner: decision-coordinator
          every: <cadence>
          from: open-review     until: hold-review
handoffs:
  open-review -> list-key-roles [review-plan]: the date, the leaders,
    the roles in scope and the readiness scale
  list-key-roles -> write-role-needs [key-roles]: each key role, its
    holder and its team, as the executive team confirmed them
  write-role-needs -> ask-for-successors [role-needs]: what a successor
    must bring to each role, at a version
  ask-for-successors -> record-readiness [successor-request]: the roles
    each manager is asked about, with their needs and the scale
  record-readiness -> read-interest [readiness-views]: each person named,
    the readiness and the evidence behind it
  read-interest -> prepare-pack [stated-interest]: the career interest
    each named person recorded, as they wrote it
  prepare-pack -> send-pack [review-pack]: every key role with its
    successors, their readiness and evidence, and the gaps
  send-pack -> hold-review [pack-sent]: the pack, and the date each
    leader received it
  hold-review -> record-plan [agreed-successors]: each role's successors
    and their readiness as the leaders agreed them, and any dissent
  record-plan -> name-gaps [succession-plan]: the plan at a version,
    confirmed by the chair
  name-gaps -> add-development-actions / add-hiring-needs
    [succession-gaps]: each role with no ready successor, and each
    development need behind a readiness view
  add-development-actions -> set-next-review [development-actions]: each
    action with its owner and date, and the person's agreement
  add-hiring-needs -> set-next-review [hiring-needs]: each need in the
    workforce plan with its date
  set-next-review -> record-learning [next-review]: the date, and the
    events that bring it forward
deviations:
  prepare-pack -> record-readiness [view-without-evidence]: a readiness
    view has no evidence of the work behind it, so it goes back to the
    manager before the pack goes out
  hold-review -> record-readiness [leaders-need-evidence]: the leaders
    cannot agree a readiness on the evidence, so the manager adds
    evidence and the role comes back to the leaders by <date>
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the head of HR, the executive
           team, the leaders over each key role, the managers and the
           chair of the review>
  systems: the HR system (read), the workforce plan (write), the
           development plan record (write), the performance review
           system (read), the decision record (write), the calendar
           (write)
  data:    <your succession policy> <version>, <your readiness scale>
           <version>, the workforce plan <version>, <your data
           protection policy> <version>
policy:
  successors and their readiness are agreed by the leaders at the
    review, and no agent names, ranks or scores a successor
  every readiness view rests on evidence of the work the manager wrote
    down
  no step weighs a protected characteristic, and the pack carries no
    pay, health, leave, accommodation or case record
  how soon a key role may open is read only from notice the holder gave
    or plans the holder shared, and never from the holder's age
  the plan is open only to <the named leaders>, and a named successor is
    told <as your succession policy sets>
  a development action enters a person's plan only with that person's
    agreement
  being named on the plan promises no one a role, and a key role that
    opens is filled on the same criteria as any other
  a change to the recorded plan is a new version, and the version it
    replaces is kept
  the plan is kept under <your jurisdiction's rule on keeping employee
    records>
measures:
  cycle time: <weeks> from the review opening to every gap having an
              action
  coverage: <target> share of key roles with a ready-now successor
  volume: <key roles per review>
  quality gate: every successor named has a readiness view with evidence
                behind it, and every gap has an action, an owner and a
                date
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

371 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: plan succession   id: <team>/plan-succession-for-key-roles   v1
from: ref/hr/plan-succession-for-key-roles v1
owner: <who>                          effective: <date>
trigger: the yearly review falls due on <your succession calendar>, or
         the holder of a key role gives notice, or <who> asks for one
         role to be reviewed, in <your HR system>
         watch: record=<succession review> system=<your HR system>
                change=<the review falls due, or the holder of a key
                role gives notice>
concurrency: one company-wide review a year - a review of a single role
             whose holder has given notice runs alongside it and starts
             from the last version of the plan
goal: every key role has its possible successors and their readiness
      agreed by the leaders, with the evidence of the work behind each
      view, or its gap named with a development action or a hiring
      need that has an owner and a date, and the next review is set
      for <date>
phases:
  open-review             - convenes briefing: the review's date, the
                            leaders taking part, the roles in scope and
                            the readiness scale at a version, sent to
                            every leader and manager who will record a
                            view
                            owner: decision-coordinator
                            after: trigger            automation: <level>
  list-key-roles          - runs collect-and-report: the roles whose loss
                            would hurt the company most, read from the
                            workforce plan with each role's holder and
                            team, for the executive team to confirm
                            owner: workforce-planner
                            after: open-review        automation: <level>
  write-role-needs        - human: the experience, skills and knowledge a
                            successor must bring to each key role,
                            written by the leader over the role at a
                            version
                            owner: <your executive role>
                            after: list-key-roles     by: <days>
                            automation: <level>
  ask-for-successors      - runs collect-and-report: each manager asked
                            to name the people who could step into each
                            key role, with the role's needs and the
                            readiness scale
                            owner: career-planner
                            after: write-role-needs   by: <days>
                            automation: <level>
  record-readiness        - human: each possible successor named with a
                            readiness on <your readiness scale>, such as
                            ready now, ready within <time> or ready
                            later, and the evidence of the work behind
                            each view
                            owner: <your manager role>
                            after: ask-for-successors
                            automation: never
  read-interest           - runs collect-and-report: the career interest
                            each named person wrote in their own
                            development plan, read for the roles they are
                            named for
                            owner: career-planner
                            after: record-readiness   automation: <level>
  prepare-pack            - runs collect-and-report: each key role, its
                            needs, its possible successors with their
                            readiness, evidence and stated interest, and
                            the roles with no successor, with no pay,
                            health, leave, case record or protected
                            characteristic in it
                            owner: career-planner
                            after: read-interest      automation: <level>
  send-pack               - convenes briefing: the pack sent to every
                            leader <days> before the review, held where
                            only <the named leaders> can open it
                            owner: decision-coordinator
                            after: prepare-pack       automation: <level>
  hold-review             - convenes decide-and-announce: the leaders go
                            through each key role, question the readiness
                            views, and agree the possible successors and
                            their readiness for each
                            owner: <your succession review chair role>
                            after: send-pack          by: <days>
                            automation: never
  record-plan             - runs collect-and-report: the succession plan
                            at a version, each role with its agreed
                            successors, their readiness and any dissent,
                            confirmed by the chair
                            owner: decision-coordinator
                            after: hold-review        automation: <level>
  name-gaps               - runs assessment: each key role with no
                            successor ready within <time>, and each
                            successor whose readiness waits on a named
                            development need
                            owner: career-planner
                            after: record-plan        automation: <level>
  add-development-actions - human: each successor's development actions,
                            agreed with the person and the manager and
                            added to the person's development plan with
                            an owner and a date
                            owner: career-planner
                            after: name-gaps          automation: <level>
  add-hiring-needs        - human: each role with no internal successor
                            added to the workforce plan as a hiring need
                            with its date, for approval through
                            ref/hr/plan-the-workforce or
                            ref/hr/open-a-position
                            owner: workforce-planner
                            after: name-gaps          automation: <level>
  set-next-review         - system: the date the plan comes back up, and
                            the events that bring it forward, such as the
                            holder of a key role giving notice
                            owner: decision-coordinator
                            after: add-development-actions +
                            add-hiring-needs          automation: <level>
  record-learning         - convenes debrief: which roles had no
                            successor and why, which readiness views the
                            leaders changed, how past successors did when
                            they stepped in, and what the next review
                            does differently
                            owner: decision-coordinator
                            after: set-next-review    automation: <level>
run-scoped:
  clock - runs roll-call                     owner: decision-coordinator
          every: <cadence>
          from: open-review     until: hold-review
handoffs:
  open-review -> list-key-roles [review-plan]: the date, the leaders,
    the roles in scope and the readiness scale
  list-key-roles -> write-role-needs [key-roles]: each key role, its
    holder and its team, as the executive team confirmed them
  write-role-needs -> ask-for-successors [role-needs]: what a successor
    must bring to each role, at a version
  ask-for-successors -> record-readiness [successor-request]: the roles
    each manager is asked about, with their needs and the scale
  record-readiness -> read-interest [readiness-views]: each person named,
    the readiness and the evidence behind it
  read-interest -> prepare-pack [stated-interest]: the career interest
    each named person recorded, as they wrote it
  prepare-pack -> send-pack [review-pack]: every key role with its
    successors, their readiness and evidence, and the gaps
  send-pack -> hold-review [pack-sent]: the pack, and the date each
    leader received it
  hold-review -> record-plan [agreed-successors]: each role's successors
    and their readiness as the leaders agreed them, and any dissent
  record-plan -> name-gaps [succession-plan]: the plan at a version,
    confirmed by the chair
  name-gaps -> add-development-actions / add-hiring-needs
    [succession-gaps]: each role with no ready successor, and each
    development need behind a readiness view
  add-development-actions -> set-next-review [development-actions]: each
    action with its owner and date, and the person's agreement
  add-hiring-needs -> set-next-review [hiring-needs]: each need in the
    workforce plan with its date
  set-next-review -> record-learning [next-review]: the date, and the
    events that bring it forward
deviations:
  prepare-pack -> record-readiness [view-without-evidence]: a readiness
    view has no evidence of the work behind it, so it goes back to the
    manager before the pack goes out
  hold-review -> record-readiness [leaders-need-evidence]: the leaders
    cannot agree a readiness on the evidence, so the manager adds
    evidence and the role comes back to the leaders by <date>
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the head of HR, the executive
           team, the leaders over each key role, the managers and the
           chair of the review>
  systems: the HR system (read), the workforce plan (write), the
           development plan record (write), the performance review
           system (read), the decision record (write), the calendar
           (write)
  data:    <your succession policy> <version>, <your readiness scale>
           <version>, the workforce plan <version>, <your data
           protection policy> <version>
policy:
  successors and their readiness are agreed by the leaders at the
    review, and no agent names, ranks or scores a successor
  every readiness view rests on evidence of the work the manager wrote
    down
  no step weighs a protected characteristic, and the pack carries no
    pay, health, leave, accommodation or case record
  how soon a key role may open is read only from notice the holder gave
    or plans the holder shared, and never from the holder's age
  the plan is open only to <the named leaders>, and a named successor is
    told <as your succession policy sets>
  a development action enters a person's plan only with that person's
    agreement
  being named on the plan promises no one a role, and a key role that
    opens is filled on the same criteria as any other
  a change to the recorded plan is a new version, and the version it
    replaces is kept
  the plan is kept under <your jurisdiction's rule on keeping employee
    records>
measures:
  cycle time: <weeks> from the review opening to every gap having an
              action
  coverage: <target> share of key roles with a ready-now successor
  volume: <key roles per review>
  quality gate: every successor named has a readiness view with evidence
                behind it, and every gap has an action, an owner and a
                date
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

46 blanks to fill. Everything else is the process.

this process from: ref/hr/plan-succession-for-key-roles v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.