Allocate Fees and Expenses

Each fee period the fund owes its management fee and carries its share of the costs of running it, and every charge has to land on the party the partnership agreement puts it on: the fund, the firm, or a portfolio company. This process works out each limited partner's (LP's) fee on the basis the fund's stage requires, applies every discount and waiver its side letter promised, and reduces the fee by the share of the fees the firm took from portfolio companies that the agreement gives back to the fund. Every expense is classified, shared costs are split by the written policy, and the caps are tested. Compliance reads every charge that benefits the firm itself, someone other than whoever worked the figures works them out again, and the chief financial officer (CFO) signs the period's charges. Payments go only to verified accounts, signed by two people. The run closes when each capital account carries its share and whatever the firm or a company owes the fund has been billed.

The goals
  • Charge each fee period within 10 days
  • Recover 100% of costs the agreement allows
  • Keep charges over a cap at zero
  • Keep fee errors investors find at zero

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

19 activities from a fee period opens on the fee calendar to every fee and expense sits with the party the agreement puts it on, and is paid, 3 of them gates a person has to sign.

Allocate Fees and Expensesa fee period opens on the fee calendar → every fee and expense sits with the party the agreement puts it on, and is paid
a charge breaks a capcompliance refuses a chargethe two workings disagreethe CFO will not sign a chargea signer will not signa fee period opens on the feecalendar1Open the Fee Periodthe period, the fee basis, and thecharges to allocate2Set the Fee Basiscommitments or invested capital,as the fund's stage sets3Apply the Side Letter FeeTermsthe discounts, early-closer ratesand waivers promised4Work Out the Management Feeeach investor's fee for theperiod, to the cent5Collect the Fees Paid byCompaniestransaction, monitoring, directorand break-up fees6Work Out the Fee Offsetsthe share of company fees thatreduces the fee7Gather the Period's Expensesevery invoice and cost that namesthe fund or a deal8Classify Each Expensethe fund's, the firm's or acompany's, by the agreement9Split the Shared Costscosts shared across funds andco-investors by the policy10Allocate the Broken-DealCoststhe costs of deals that did notclose, shared by the policy11Check the Charges against theCapsthe expense caps in the agreementand each side letter12Review Charges That Benefitthe Firmanything that helps the firmitself, read by compliancea person signs · never an agent13Check the FiguresIndependentlythe administrator or thecontroller works them out again14Sign the Period's Chargesthe CFO signs the fee, the offsetsand the expensesa person signs · never an agent15Verify the PaymentInstructionseach payee's account against theverified record16Release the Paymentstwo people sign the fee andexpense paymentsa person signs · never an agent17Post the Charges to theCapital Accountseach investor's share of fees andexpenses booked18Bill What Others Owe the Fundthe firm and companies billed forcosts the fund paid19Record What the Period Taughtwhat was moved, capped or refused,and whyevery fee and expense sitswith the party the agreementputs it on, and is paid
The roster this process needs
capital-account-keeper 13 side-letter-keeper 3 CFO 3 controller 2 chief compliance officer 1 fund administrator 1 wire-check 1 second signer 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: allocate fees and expenses   id: <team>/allocate-fees-and-expenses   v1
from: ref/pc/allocate-fees-and-expenses v1
owner: <who>                          effective: <date>
trigger: a fee period opens on <your fee calendar>, <in advance or in
         arrears> as the partnership agreement sets
         watch: record=<fee period> system=<your fund accounting system>
                change=<a fee period opens>
concurrency: one fee period per fund is open at a time - the next
             period's run waits until this one is signed, and an expense
             that arrives after <the cut-off day> goes into the next
             period
goal: the period's fee and expenses charged within <days> of the period
      opening, each on the party the agreement puts it on, with every
      offset applied and no expense over a cap charged to the fund
phases:
  open-period          - system: the period opens with its dates, the
                         funds and vehicles it covers, and the cut-off
                         for expenses
                         owner: capital-account-keeper   after: trigger
                         automation: <level>
  set-fee-basis        - runs assessment: commitments during the
                         investment period, invested capital after it,
                         or whatever basis the agreement sets, with any
                         step-down in the rate of <rate>
                         owner: capital-account-keeper
                         after: open-period         automation: <level>
  apply-fee-terms      - runs assessment: each side letter read for fee
                         discounts, rates for investors who closed early,
                         waivers and most favoured nation elections
                         owner: side-letter-keeper
                         after: set-fee-basis       automation: <level>
  work-out-fee         - runs allocate-and-reconcile: each investor's fee
                         for the period from its basis, its rate and its
                         side letter terms, with partial periods for
                         investors who joined at a later close
                         owner: capital-account-keeper
                         after: apply-fee-terms     automation: <level>
  collect-company-fees - runs collect-and-report: every transaction,
                         monitoring, director and break-up fee that a
                         portfolio company paid the firm, an affiliate
                         or anyone at the firm in the period
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  work-out-offsets     - runs allocate-and-reconcile: the share of those
                         fees the agreement gives back to the fund, at
                         <offset share>, set against each investor's fee,
                         with any excess carried forward as it allows
                         owner: capital-account-keeper
                         after: work-out-fee + collect-company-fees
                         automation: <level>
  gather-expenses      - runs collect-and-report: every invoice and cost
                         that names the fund, a deal or a portfolio
                         company, received by <the cut-off day>
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  classify-expenses    - runs assessment: each expense classed as the
                         fund's, the firm's or a company's, with the
                         clause of the agreement that allows it, and an
                         expense the agreement does not name treated as
                         the firm's
                         owner: capital-account-keeper
                         after: gather-expenses     automation: <level>
  split-shared         - runs allocate-and-reconcile: costs shared across
                         funds, parallel funds and co-investment vehicles
                         split under <your expense allocation policy>
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  allocate-broken-deal - runs allocate-and-reconcile: the costs of deals
                         that did not close, shared among the fund and
                         the co-investors who would have invested, under
                         the same policy
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  check-caps           - runs assessment: the period's charges against
                         the caps on organizational costs and other
                         expenses in the agreement and every side letter,
                         with the running total for the year
                         owner: side-letter-keeper
                         after: work-out-offsets + split-shared +
                         allocate-broken-deal       automation: <level>
  review-conflicts     - runs assessment: every charge that benefits the
                         firm, an affiliate or a person at the firm read
                         for whether the agreement allows the fund to
                         carry it
                         owner: <your chief compliance officer role>
                         after: check-caps          by: <days>
                         automation: never
  check-figures        - runs assessment: the fee, the offsets and the
                         allocations worked out again from the same
                         inputs, without sight of the first answer, by
                         the outside fund administrator where the firm
                         uses one to check its work, or by <your
                         controller role>
                         owner: <your independent check role>
                         after: review-conflicts    by: <days>
                         automation: <level>
  sign-charges         - convenes approval: <your CFO role> signs the
                         period's fee, offsets and expenses as a named
                         signer
                         owner: <your CFO role>
                         after: check-figures       by: <days>
                         automation: never
  verify-instructions  - runs assessment: the account of every payee,
                         the firm included, checked against <your
                         verified payee record>, and any change confirmed
                         by a call to a number already on file
                         owner: wire-check
                         after: sign-charges        automation: <level>
  release-payments     - convenes approval: <your CFO role> and <your
                         second signer role> each sign the fee and
                         expense payments in the bank portal, against
                         the signed charges and the verified accounts
                         owner: <your CFO role>
                         after: verify-instructions by: <days>
                         automation: never
  post-charges         - system: each investor's share of the fee, the
                         offsets and the expenses booked to its capital
                         account
                         owner: capital-account-keeper
                         after: sign-charges        automation: <level>
  bill-others          - human: the firm billed for the firm's costs the
                         fund paid, and each company billed for its own,
                         with the date each bill is due
                         owner: capital-account-keeper
                         after: post-charges        by: <days>
                         automation: <level>
  record-learning      - convenes debrief: what was moved between the
                         fund and the firm, what a cap stopped, what
                         compliance refused, and what the next period
                         does differently
                         owner: capital-account-keeper
                         after: release-payments + bill-others
                         automation: <level>
run-scoped:
  cap-tracker - runs allocate-and-reconcile     owner: side-letter-keeper
                from: check-caps   until: run close
  close-date  - runs roll-call                  owner: capital-account-keeper
                every: <cadence>
                from: open-period  until: sign-charges
handoffs:
  open-period -> set-fee-basis [fee-period]: the period, the funds and
    vehicles it covers, and the cut-off for expenses
  set-fee-basis -> apply-fee-terms [fee-basis]: the basis and the rate
    for the period, with the clause each rests on
  apply-fee-terms -> work-out-fee [fee-terms]: each investor's fee terms
    from its side letter, with the clause for each
  work-out-fee -> work-out-offsets [gross-fees]: each investor's fee
    before offsets, summing to the fund's fee to the cent
  collect-company-fees -> work-out-offsets [company-fees]: every fee a
    company paid the firm or its people, with the invoice and the date
  work-out-offsets -> check-caps [net-fees]: each investor's fee after
    offsets, and any excess carried forward
  gather-expenses -> classify-expenses [period-expenses]: every expense
    received by the cut-off, with its invoice
  classify-expenses -> split-shared / allocate-broken-deal
    [classified-expenses]: each expense with its class and the clause
    that allows it
  split-shared -> check-caps [shared-cost-split]: each shared cost and
    the share each fund and vehicle carries
  allocate-broken-deal -> check-caps [broken-deal-split]: the costs of
    each deal that did not close, and who carries them
  check-caps -> review-conflicts [capped-charges]: the charges inside
    the caps, and any excess moved to the firm
  review-conflicts -> check-figures [reviewed-charges]: the charges
    compliance cleared, and the reason for each one it refused
  check-figures -> sign-charges [checked-charges]: the charges as both
    workings agree them, with the name of whoever checked them
  sign-charges -> verify-instructions / post-charges [signed-charges]:
    the signed fee, offsets and expenses. A change to any line voids the
    signature
  verify-instructions -> release-payments [verified-payees]: each
    payee's account, confirmed against the record, and the date
  release-payments -> record-learning [released-payments]: every
    payment signed, with its amount, payee and bank reference
  post-charges -> bill-others [posted-charges]: each capital account
    after the period's charges
  bill-others -> record-learning [bills-issued]: each bill to the firm
    or a company, with its amount and due date
deviations:
  check-caps -> classify-expenses [cap-broken]: a charge breaks a cap,
    so the excess is classed as the firm's and the split is worked again
  review-conflicts -> classify-expenses [charge-refused]: compliance
    refuses a charge the fund may not carry, so it is classed as the
    firm's
  check-figures -> work-out-fee [workings-disagree]: the two workings
    disagree, so the figures are worked out again and the difference is
    traced before anything is signed
  sign-charges -> classify-expenses [signer-refuses]: the CFO will not
    sign a charge, so it is classed again on the line the CFO named
  release-payments -> sign-charges [payment-not-signed]: a signer will
    not sign a payment, so the charge behind it goes back to the CFO
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, or the outside fund administrator where it holds
           capital-account-keeper or wire-check for the firm, and named
           people for the CFO, the second signer, the controller and the
           chief compliance officer>
  systems: the fund accounting system (write), the bank portal (read),
           the side letter register (read), the portfolio reporting
           system (read), <your accounts payable system> (write), <your
           verified payee record> (read), the notification channel
           (write)
  data:    the partnership agreement <version>, every side letter at
           its current version and the elections made under it, <your
           expense allocation policy> <version>, <your fee calendar>,
           the firm's conflicts policy <version>
policy:
  every expense charged to the fund names the clause of the partnership
    agreement that allows it, and an expense the agreement does not name
    is the firm's
  fees the firm or its people take from portfolio companies are offset
    at <offset share> as the agreement requires, whoever received them
  shared costs are split by <your expense allocation policy>, applied
    the same way to every fund and vehicle that shares them
  a charge over a cap is the firm's, and a cap is raised only with the
    consent the agreement requires, sought at
    ref/pc/seek-an-advisory-committee-consent
  every charge that benefits the firm is read by <your chief compliance
    officer role> before it is signed
  the figures are worked out again by someone other than whoever worked
    them first
  every payment is signed in the bank portal by two named people
    against a verified account, and no agent releases money
  the period's charges appear in the next quarterly report, line by
    line, as the agreement and <your regulator's rules> require
measures:
  cycle time: <days> from the period opening to the charges signed
  accuracy: <target> share of periods with no charge corrected later
  volume: <expenses per period>
  quality gate: every charge to the fund names its clause, and every
                company fee shows its offset
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

356 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: allocate fees and expenses   id: <team>/allocate-fees-and-expenses   v1
from: ref/pc/allocate-fees-and-expenses v1
owner: <who>                          effective: <date>
trigger: a fee period opens on <your fee calendar>, <in advance or in
         arrears> as the partnership agreement sets
         watch: record=<fee period> system=<your fund accounting system>
                change=<a fee period opens>
concurrency: one fee period per fund is open at a time - the next
             period's run waits until this one is signed, and an expense
             that arrives after <the cut-off day> goes into the next
             period
goal: the period's fee and expenses charged within <days> of the period
      opening, each on the party the agreement puts it on, with every
      offset applied and no expense over a cap charged to the fund
phases:
  open-period          - system: the period opens with its dates, the
                         funds and vehicles it covers, and the cut-off
                         for expenses
                         owner: capital-account-keeper   after: trigger
                         automation: <level>
  set-fee-basis        - runs assessment: commitments during the
                         investment period, invested capital after it,
                         or whatever basis the agreement sets, with any
                         step-down in the rate of <rate>
                         owner: capital-account-keeper
                         after: open-period         automation: <level>
  apply-fee-terms      - runs assessment: each side letter read for fee
                         discounts, rates for investors who closed early,
                         waivers and most favoured nation elections
                         owner: side-letter-keeper
                         after: set-fee-basis       automation: <level>
  work-out-fee         - runs allocate-and-reconcile: each investor's fee
                         for the period from its basis, its rate and its
                         side letter terms, with partial periods for
                         investors who joined at a later close
                         owner: capital-account-keeper
                         after: apply-fee-terms     automation: <level>
  collect-company-fees - runs collect-and-report: every transaction,
                         monitoring, director and break-up fee that a
                         portfolio company paid the firm, an affiliate
                         or anyone at the firm in the period
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  work-out-offsets     - runs allocate-and-reconcile: the share of those
                         fees the agreement gives back to the fund, at
                         <offset share>, set against each investor's fee,
                         with any excess carried forward as it allows
                         owner: capital-account-keeper
                         after: work-out-fee + collect-company-fees
                         automation: <level>
  gather-expenses      - runs collect-and-report: every invoice and cost
                         that names the fund, a deal or a portfolio
                         company, received by <the cut-off day>
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  classify-expenses    - runs assessment: each expense classed as the
                         fund's, the firm's or a company's, with the
                         clause of the agreement that allows it, and an
                         expense the agreement does not name treated as
                         the firm's
                         owner: capital-account-keeper
                         after: gather-expenses     automation: <level>
  split-shared         - runs allocate-and-reconcile: costs shared across
                         funds, parallel funds and co-investment vehicles
                         split under <your expense allocation policy>
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  allocate-broken-deal - runs allocate-and-reconcile: the costs of deals
                         that did not close, shared among the fund and
                         the co-investors who would have invested, under
                         the same policy
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  check-caps           - runs assessment: the period's charges against
                         the caps on organizational costs and other
                         expenses in the agreement and every side letter,
                         with the running total for the year
                         owner: side-letter-keeper
                         after: work-out-offsets + split-shared +
                         allocate-broken-deal       automation: <level>
  review-conflicts     - runs assessment: every charge that benefits the
                         firm, an affiliate or a person at the firm read
                         for whether the agreement allows the fund to
                         carry it
                         owner: <your chief compliance officer role>
                         after: check-caps          by: <days>
                         automation: never
  check-figures        - runs assessment: the fee, the offsets and the
                         allocations worked out again from the same
                         inputs, without sight of the first answer, by
                         the outside fund administrator where the firm
                         uses one to check its work, or by <your
                         controller role>
                         owner: <your independent check role>
                         after: review-conflicts    by: <days>
                         automation: <level>
  sign-charges         - convenes approval: <your CFO role> signs the
                         period's fee, offsets and expenses as a named
                         signer
                         owner: <your CFO role>
                         after: check-figures       by: <days>
                         automation: never
  verify-instructions  - runs assessment: the account of every payee,
                         the firm included, checked against <your
                         verified payee record>, and any change confirmed
                         by a call to a number already on file
                         owner: wire-check
                         after: sign-charges        automation: <level>
  release-payments     - convenes approval: <your CFO role> and <your
                         second signer role> each sign the fee and
                         expense payments in the bank portal, against
                         the signed charges and the verified accounts
                         owner: <your CFO role>
                         after: verify-instructions by: <days>
                         automation: never
  post-charges         - system: each investor's share of the fee, the
                         offsets and the expenses booked to its capital
                         account
                         owner: capital-account-keeper
                         after: sign-charges        automation: <level>
  bill-others          - human: the firm billed for the firm's costs the
                         fund paid, and each company billed for its own,
                         with the date each bill is due
                         owner: capital-account-keeper
                         after: post-charges        by: <days>
                         automation: <level>
  record-learning      - convenes debrief: what was moved between the
                         fund and the firm, what a cap stopped, what
                         compliance refused, and what the next period
                         does differently
                         owner: capital-account-keeper
                         after: release-payments + bill-others
                         automation: <level>
run-scoped:
  cap-tracker - runs allocate-and-reconcile     owner: side-letter-keeper
                from: check-caps   until: run close
  close-date  - runs roll-call                  owner: capital-account-keeper
                every: <cadence>
                from: open-period  until: sign-charges
handoffs:
  open-period -> set-fee-basis [fee-period]: the period, the funds and
    vehicles it covers, and the cut-off for expenses
  set-fee-basis -> apply-fee-terms [fee-basis]: the basis and the rate
    for the period, with the clause each rests on
  apply-fee-terms -> work-out-fee [fee-terms]: each investor's fee terms
    from its side letter, with the clause for each
  work-out-fee -> work-out-offsets [gross-fees]: each investor's fee
    before offsets, summing to the fund's fee to the cent
  collect-company-fees -> work-out-offsets [company-fees]: every fee a
    company paid the firm or its people, with the invoice and the date
  work-out-offsets -> check-caps [net-fees]: each investor's fee after
    offsets, and any excess carried forward
  gather-expenses -> classify-expenses [period-expenses]: every expense
    received by the cut-off, with its invoice
  classify-expenses -> split-shared / allocate-broken-deal
    [classified-expenses]: each expense with its class and the clause
    that allows it
  split-shared -> check-caps [shared-cost-split]: each shared cost and
    the share each fund and vehicle carries
  allocate-broken-deal -> check-caps [broken-deal-split]: the costs of
    each deal that did not close, and who carries them
  check-caps -> review-conflicts [capped-charges]: the charges inside
    the caps, and any excess moved to the firm
  review-conflicts -> check-figures [reviewed-charges]: the charges
    compliance cleared, and the reason for each one it refused
  check-figures -> sign-charges [checked-charges]: the charges as both
    workings agree them, with the name of whoever checked them
  sign-charges -> verify-instructions / post-charges [signed-charges]:
    the signed fee, offsets and expenses. A change to any line voids the
    signature
  verify-instructions -> release-payments [verified-payees]: each
    payee's account, confirmed against the record, and the date
  release-payments -> record-learning [released-payments]: every
    payment signed, with its amount, payee and bank reference
  post-charges -> bill-others [posted-charges]: each capital account
    after the period's charges
  bill-others -> record-learning [bills-issued]: each bill to the firm
    or a company, with its amount and due date
deviations:
  check-caps -> classify-expenses [cap-broken]: a charge breaks a cap,
    so the excess is classed as the firm's and the split is worked again
  review-conflicts -> classify-expenses [charge-refused]: compliance
    refuses a charge the fund may not carry, so it is classed as the
    firm's
  check-figures -> work-out-fee [workings-disagree]: the two workings
    disagree, so the figures are worked out again and the difference is
    traced before anything is signed
  sign-charges -> classify-expenses [signer-refuses]: the CFO will not
    sign a charge, so it is classed again on the line the CFO named
  release-payments -> sign-charges [payment-not-signed]: a signer will
    not sign a payment, so the charge behind it goes back to the CFO
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, or the outside fund administrator where it holds
           capital-account-keeper or wire-check for the firm, and named
           people for the CFO, the second signer, the controller and the
           chief compliance officer>
  systems: the fund accounting system (write), the bank portal (read),
           the side letter register (read), the portfolio reporting
           system (read), <your accounts payable system> (write), <your
           verified payee record> (read), the notification channel
           (write)
  data:    the partnership agreement <version>, every side letter at
           its current version and the elections made under it, <your
           expense allocation policy> <version>, <your fee calendar>,
           the firm's conflicts policy <version>
policy:
  every expense charged to the fund names the clause of the partnership
    agreement that allows it, and an expense the agreement does not name
    is the firm's
  fees the firm or its people take from portfolio companies are offset
    at <offset share> as the agreement requires, whoever received them
  shared costs are split by <your expense allocation policy>, applied
    the same way to every fund and vehicle that shares them
  a charge over a cap is the firm's, and a cap is raised only with the
    consent the agreement requires, sought at
    ref/pc/seek-an-advisory-committee-consent
  every charge that benefits the firm is read by <your chief compliance
    officer role> before it is signed
  the figures are worked out again by someone other than whoever worked
    them first
  every payment is signed in the bank portal by two named people
    against a verified account, and no agent releases money
  the period's charges appear in the next quarterly report, line by
    line, as the agreement and <your regulator's rules> require
measures:
  cycle time: <days> from the period opening to the charges signed
  accuracy: <target> share of periods with no charge corrected later
  volume: <expenses per period>
  quality gate: every charge to the fund names its clause, and every
                company fee shows its offset
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

411 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: allocate fees and expenses   id: <team>/allocate-fees-and-expenses   v1
from: ref/pc/allocate-fees-and-expenses v1
owner: <who>                          effective: <date>
trigger: a fee period opens on <your fee calendar>, <in advance or in
         arrears> as the partnership agreement sets
         watch: record=<fee period> system=<your fund accounting system>
                change=<a fee period opens>
concurrency: one fee period per fund is open at a time - the next
             period's run waits until this one is signed, and an expense
             that arrives after <the cut-off day> goes into the next
             period
goal: the period's fee and expenses charged within <days> of the period
      opening, each on the party the agreement puts it on, with every
      offset applied and no expense over a cap charged to the fund
phases:
  open-period          - system: the period opens with its dates, the
                         funds and vehicles it covers, and the cut-off
                         for expenses
                         owner: capital-account-keeper   after: trigger
                         automation: <level>
  set-fee-basis        - runs assessment: commitments during the
                         investment period, invested capital after it,
                         or whatever basis the agreement sets, with any
                         step-down in the rate of <rate>
                         owner: capital-account-keeper
                         after: open-period         automation: <level>
  apply-fee-terms      - runs assessment: each side letter read for fee
                         discounts, rates for investors who closed early,
                         waivers and most favoured nation elections
                         owner: side-letter-keeper
                         after: set-fee-basis       automation: <level>
  work-out-fee         - runs allocate-and-reconcile: each investor's fee
                         for the period from its basis, its rate and its
                         side letter terms, with partial periods for
                         investors who joined at a later close
                         owner: capital-account-keeper
                         after: apply-fee-terms     automation: <level>
  collect-company-fees - runs collect-and-report: every transaction,
                         monitoring, director and break-up fee that a
                         portfolio company paid the firm, an affiliate
                         or anyone at the firm in the period
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  work-out-offsets     - runs allocate-and-reconcile: the share of those
                         fees the agreement gives back to the fund, at
                         <offset share>, set against each investor's fee,
                         with any excess carried forward as it allows
                         owner: capital-account-keeper
                         after: work-out-fee + collect-company-fees
                         automation: <level>
  gather-expenses      - runs collect-and-report: every invoice and cost
                         that names the fund, a deal or a portfolio
                         company, received by <the cut-off day>
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  classify-expenses    - runs assessment: each expense classed as the
                         fund's, the firm's or a company's, with the
                         clause of the agreement that allows it, and an
                         expense the agreement does not name treated as
                         the firm's
                         owner: capital-account-keeper
                         after: gather-expenses     automation: <level>
  split-shared         - runs allocate-and-reconcile: costs shared across
                         funds, parallel funds and co-investment vehicles
                         split under <your expense allocation policy>
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  allocate-broken-deal - runs allocate-and-reconcile: the costs of deals
                         that did not close, shared among the fund and
                         the co-investors who would have invested, under
                         the same policy
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  check-caps           - runs assessment: the period's charges against
                         the caps on organizational costs and other
                         expenses in the agreement and every side letter,
                         with the running total for the year
                         owner: side-letter-keeper
                         after: work-out-offsets + split-shared +
                         allocate-broken-deal       automation: <level>
  review-conflicts     - runs assessment: every charge that benefits the
                         firm, an affiliate or a person at the firm read
                         for whether the agreement allows the fund to
                         carry it
                         owner: <your chief compliance officer role>
                         after: check-caps          by: <days>
                         automation: never
  check-figures        - runs assessment: the fee, the offsets and the
                         allocations worked out again from the same
                         inputs, without sight of the first answer, by
                         the outside fund administrator where the firm
                         uses one to check its work, or by <your
                         controller role>
                         owner: <your independent check role>
                         after: review-conflicts    by: <days>
                         automation: <level>
  sign-charges         - convenes approval: <your CFO role> signs the
                         period's fee, offsets and expenses as a named
                         signer
                         owner: <your CFO role>
                         after: check-figures       by: <days>
                         automation: never
  verify-instructions  - runs assessment: the account of every payee,
                         the firm included, checked against <your
                         verified payee record>, and any change confirmed
                         by a call to a number already on file
                         owner: wire-check
                         after: sign-charges        automation: <level>
  release-payments     - convenes approval: <your CFO role> and <your
                         second signer role> each sign the fee and
                         expense payments in the bank portal, against
                         the signed charges and the verified accounts
                         owner: <your CFO role>
                         after: verify-instructions by: <days>
                         automation: never
  post-charges         - system: each investor's share of the fee, the
                         offsets and the expenses booked to its capital
                         account
                         owner: capital-account-keeper
                         after: sign-charges        automation: <level>
  bill-others          - human: the firm billed for the firm's costs the
                         fund paid, and each company billed for its own,
                         with the date each bill is due
                         owner: capital-account-keeper
                         after: post-charges        by: <days>
                         automation: <level>
  record-learning      - convenes debrief: what was moved between the
                         fund and the firm, what a cap stopped, what
                         compliance refused, and what the next period
                         does differently
                         owner: capital-account-keeper
                         after: release-payments + bill-others
                         automation: <level>
run-scoped:
  cap-tracker - runs allocate-and-reconcile     owner: side-letter-keeper
                from: check-caps   until: run close
  close-date  - runs roll-call                  owner: capital-account-keeper
                every: <cadence>
                from: open-period  until: sign-charges
handoffs:
  open-period -> set-fee-basis [fee-period]: the period, the funds and
    vehicles it covers, and the cut-off for expenses
  set-fee-basis -> apply-fee-terms [fee-basis]: the basis and the rate
    for the period, with the clause each rests on
  apply-fee-terms -> work-out-fee [fee-terms]: each investor's fee terms
    from its side letter, with the clause for each
  work-out-fee -> work-out-offsets [gross-fees]: each investor's fee
    before offsets, summing to the fund's fee to the cent
  collect-company-fees -> work-out-offsets [company-fees]: every fee a
    company paid the firm or its people, with the invoice and the date
  work-out-offsets -> check-caps [net-fees]: each investor's fee after
    offsets, and any excess carried forward
  gather-expenses -> classify-expenses [period-expenses]: every expense
    received by the cut-off, with its invoice
  classify-expenses -> split-shared / allocate-broken-deal
    [classified-expenses]: each expense with its class and the clause
    that allows it
  split-shared -> check-caps [shared-cost-split]: each shared cost and
    the share each fund and vehicle carries
  allocate-broken-deal -> check-caps [broken-deal-split]: the costs of
    each deal that did not close, and who carries them
  check-caps -> review-conflicts [capped-charges]: the charges inside
    the caps, and any excess moved to the firm
  review-conflicts -> check-figures [reviewed-charges]: the charges
    compliance cleared, and the reason for each one it refused
  check-figures -> sign-charges [checked-charges]: the charges as both
    workings agree them, with the name of whoever checked them
  sign-charges -> verify-instructions / post-charges [signed-charges]:
    the signed fee, offsets and expenses. A change to any line voids the
    signature
  verify-instructions -> release-payments [verified-payees]: each
    payee's account, confirmed against the record, and the date
  release-payments -> record-learning [released-payments]: every
    payment signed, with its amount, payee and bank reference
  post-charges -> bill-others [posted-charges]: each capital account
    after the period's charges
  bill-others -> record-learning [bills-issued]: each bill to the firm
    or a company, with its amount and due date
deviations:
  check-caps -> classify-expenses [cap-broken]: a charge breaks a cap,
    so the excess is classed as the firm's and the split is worked again
  review-conflicts -> classify-expenses [charge-refused]: compliance
    refuses a charge the fund may not carry, so it is classed as the
    firm's
  check-figures -> work-out-fee [workings-disagree]: the two workings
    disagree, so the figures are worked out again and the difference is
    traced before anything is signed
  sign-charges -> classify-expenses [signer-refuses]: the CFO will not
    sign a charge, so it is classed again on the line the CFO named
  release-payments -> sign-charges [payment-not-signed]: a signer will
    not sign a payment, so the charge behind it goes back to the CFO
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, or the outside fund administrator where it holds
           capital-account-keeper or wire-check for the firm, and named
           people for the CFO, the second signer, the controller and the
           chief compliance officer>
  systems: the fund accounting system (write), the bank portal (read),
           the side letter register (read), the portfolio reporting
           system (read), <your accounts payable system> (write), <your
           verified payee record> (read), the notification channel
           (write)
  data:    the partnership agreement <version>, every side letter at
           its current version and the elections made under it, <your
           expense allocation policy> <version>, <your fee calendar>,
           the firm's conflicts policy <version>
policy:
  every expense charged to the fund names the clause of the partnership
    agreement that allows it, and an expense the agreement does not name
    is the firm's
  fees the firm or its people take from portfolio companies are offset
    at <offset share> as the agreement requires, whoever received them
  shared costs are split by <your expense allocation policy>, applied
    the same way to every fund and vehicle that shares them
  a charge over a cap is the firm's, and a cap is raised only with the
    consent the agreement requires, sought at
    ref/pc/seek-an-advisory-committee-consent
  every charge that benefits the firm is read by <your chief compliance
    officer role> before it is signed
  the figures are worked out again by someone other than whoever worked
    them first
  every payment is signed in the bank portal by two named people
    against a verified account, and no agent releases money
  the period's charges appear in the next quarterly report, line by
    line, as the agreement and <your regulator's rules> require
measures:
  cycle time: <days> from the period opening to the charges signed
  accuracy: <target> share of periods with no charge corrected later
  volume: <expenses per period>
  quality gate: every charge to the fund names its clause, and every
                company fee shows its offset
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

416 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: allocate fees and expenses   id: <team>/allocate-fees-and-expenses   v1
from: ref/pc/allocate-fees-and-expenses v1
owner: <who>                          effective: <date>
trigger: a fee period opens on <your fee calendar>, <in advance or in
         arrears> as the partnership agreement sets
         watch: record=<fee period> system=<your fund accounting system>
                change=<a fee period opens>
concurrency: one fee period per fund is open at a time - the next
             period's run waits until this one is signed, and an expense
             that arrives after <the cut-off day> goes into the next
             period
goal: the period's fee and expenses charged within <days> of the period
      opening, each on the party the agreement puts it on, with every
      offset applied and no expense over a cap charged to the fund
phases:
  open-period          - system: the period opens with its dates, the
                         funds and vehicles it covers, and the cut-off
                         for expenses
                         owner: capital-account-keeper   after: trigger
                         automation: <level>
  set-fee-basis        - runs assessment: commitments during the
                         investment period, invested capital after it,
                         or whatever basis the agreement sets, with any
                         step-down in the rate of <rate>
                         owner: capital-account-keeper
                         after: open-period         automation: <level>
  apply-fee-terms      - runs assessment: each side letter read for fee
                         discounts, rates for investors who closed early,
                         waivers and most favoured nation elections
                         owner: side-letter-keeper
                         after: set-fee-basis       automation: <level>
  work-out-fee         - runs allocate-and-reconcile: each investor's fee
                         for the period from its basis, its rate and its
                         side letter terms, with partial periods for
                         investors who joined at a later close
                         owner: capital-account-keeper
                         after: apply-fee-terms     automation: <level>
  collect-company-fees - runs collect-and-report: every transaction,
                         monitoring, director and break-up fee that a
                         portfolio company paid the firm, an affiliate
                         or anyone at the firm in the period
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  work-out-offsets     - runs allocate-and-reconcile: the share of those
                         fees the agreement gives back to the fund, at
                         <offset share>, set against each investor's fee,
                         with any excess carried forward as it allows
                         owner: capital-account-keeper
                         after: work-out-fee + collect-company-fees
                         automation: <level>
  gather-expenses      - runs collect-and-report: every invoice and cost
                         that names the fund, a deal or a portfolio
                         company, received by <the cut-off day>
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  classify-expenses    - runs assessment: each expense classed as the
                         fund's, the firm's or a company's, with the
                         clause of the agreement that allows it, and an
                         expense the agreement does not name treated as
                         the firm's
                         owner: capital-account-keeper
                         after: gather-expenses     automation: <level>
  split-shared         - runs allocate-and-reconcile: costs shared across
                         funds, parallel funds and co-investment vehicles
                         split under <your expense allocation policy>
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  allocate-broken-deal - runs allocate-and-reconcile: the costs of deals
                         that did not close, shared among the fund and
                         the co-investors who would have invested, under
                         the same policy
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  check-caps           - runs assessment: the period's charges against
                         the caps on organizational costs and other
                         expenses in the agreement and every side letter,
                         with the running total for the year
                         owner: side-letter-keeper
                         after: work-out-offsets + split-shared +
                         allocate-broken-deal       automation: <level>
  review-conflicts     - runs assessment: every charge that benefits the
                         firm, an affiliate or a person at the firm read
                         for whether the agreement allows the fund to
                         carry it
                         owner: <your chief compliance officer role>
                         after: check-caps          by: <days>
                         automation: never
  check-figures        - runs assessment: the fee, the offsets and the
                         allocations worked out again from the same
                         inputs, without sight of the first answer, by
                         the outside fund administrator where the firm
                         uses one to check its work, or by <your
                         controller role>
                         owner: <your independent check role>
                         after: review-conflicts    by: <days>
                         automation: <level>
  sign-charges         - convenes approval: <your CFO role> signs the
                         period's fee, offsets and expenses as a named
                         signer
                         owner: <your CFO role>
                         after: check-figures       by: <days>
                         automation: never
  verify-instructions  - runs assessment: the account of every payee,
                         the firm included, checked against <your
                         verified payee record>, and any change confirmed
                         by a call to a number already on file
                         owner: wire-check
                         after: sign-charges        automation: <level>
  release-payments     - convenes approval: <your CFO role> and <your
                         second signer role> each sign the fee and
                         expense payments in the bank portal, against
                         the signed charges and the verified accounts
                         owner: <your CFO role>
                         after: verify-instructions by: <days>
                         automation: never
  post-charges         - system: each investor's share of the fee, the
                         offsets and the expenses booked to its capital
                         account
                         owner: capital-account-keeper
                         after: sign-charges        automation: <level>
  bill-others          - human: the firm billed for the firm's costs the
                         fund paid, and each company billed for its own,
                         with the date each bill is due
                         owner: capital-account-keeper
                         after: post-charges        by: <days>
                         automation: <level>
  record-learning      - convenes debrief: what was moved between the
                         fund and the firm, what a cap stopped, what
                         compliance refused, and what the next period
                         does differently
                         owner: capital-account-keeper
                         after: release-payments + bill-others
                         automation: <level>
run-scoped:
  cap-tracker - runs allocate-and-reconcile     owner: side-letter-keeper
                from: check-caps   until: run close
  close-date  - runs roll-call                  owner: capital-account-keeper
                every: <cadence>
                from: open-period  until: sign-charges
handoffs:
  open-period -> set-fee-basis [fee-period]: the period, the funds and
    vehicles it covers, and the cut-off for expenses
  set-fee-basis -> apply-fee-terms [fee-basis]: the basis and the rate
    for the period, with the clause each rests on
  apply-fee-terms -> work-out-fee [fee-terms]: each investor's fee terms
    from its side letter, with the clause for each
  work-out-fee -> work-out-offsets [gross-fees]: each investor's fee
    before offsets, summing to the fund's fee to the cent
  collect-company-fees -> work-out-offsets [company-fees]: every fee a
    company paid the firm or its people, with the invoice and the date
  work-out-offsets -> check-caps [net-fees]: each investor's fee after
    offsets, and any excess carried forward
  gather-expenses -> classify-expenses [period-expenses]: every expense
    received by the cut-off, with its invoice
  classify-expenses -> split-shared / allocate-broken-deal
    [classified-expenses]: each expense with its class and the clause
    that allows it
  split-shared -> check-caps [shared-cost-split]: each shared cost and
    the share each fund and vehicle carries
  allocate-broken-deal -> check-caps [broken-deal-split]: the costs of
    each deal that did not close, and who carries them
  check-caps -> review-conflicts [capped-charges]: the charges inside
    the caps, and any excess moved to the firm
  review-conflicts -> check-figures [reviewed-charges]: the charges
    compliance cleared, and the reason for each one it refused
  check-figures -> sign-charges [checked-charges]: the charges as both
    workings agree them, with the name of whoever checked them
  sign-charges -> verify-instructions / post-charges [signed-charges]:
    the signed fee, offsets and expenses. A change to any line voids the
    signature
  verify-instructions -> release-payments [verified-payees]: each
    payee's account, confirmed against the record, and the date
  release-payments -> record-learning [released-payments]: every
    payment signed, with its amount, payee and bank reference
  post-charges -> bill-others [posted-charges]: each capital account
    after the period's charges
  bill-others -> record-learning [bills-issued]: each bill to the firm
    or a company, with its amount and due date
deviations:
  check-caps -> classify-expenses [cap-broken]: a charge breaks a cap,
    so the excess is classed as the firm's and the split is worked again
  review-conflicts -> classify-expenses [charge-refused]: compliance
    refuses a charge the fund may not carry, so it is classed as the
    firm's
  check-figures -> work-out-fee [workings-disagree]: the two workings
    disagree, so the figures are worked out again and the difference is
    traced before anything is signed
  sign-charges -> classify-expenses [signer-refuses]: the CFO will not
    sign a charge, so it is classed again on the line the CFO named
  release-payments -> sign-charges [payment-not-signed]: a signer will
    not sign a payment, so the charge behind it goes back to the CFO
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, or the outside fund administrator where it holds
           capital-account-keeper or wire-check for the firm, and named
           people for the CFO, the second signer, the controller and the
           chief compliance officer>
  systems: the fund accounting system (write), the bank portal (read),
           the side letter register (read), the portfolio reporting
           system (read), <your accounts payable system> (write), <your
           verified payee record> (read), the notification channel
           (write)
  data:    the partnership agreement <version>, every side letter at
           its current version and the elections made under it, <your
           expense allocation policy> <version>, <your fee calendar>,
           the firm's conflicts policy <version>
policy:
  every expense charged to the fund names the clause of the partnership
    agreement that allows it, and an expense the agreement does not name
    is the firm's
  fees the firm or its people take from portfolio companies are offset
    at <offset share> as the agreement requires, whoever received them
  shared costs are split by <your expense allocation policy>, applied
    the same way to every fund and vehicle that shares them
  a charge over a cap is the firm's, and a cap is raised only with the
    consent the agreement requires, sought at
    ref/pc/seek-an-advisory-committee-consent
  every charge that benefits the firm is read by <your chief compliance
    officer role> before it is signed
  the figures are worked out again by someone other than whoever worked
    them first
  every payment is signed in the bank portal by two named people
    against a verified account, and no agent releases money
  the period's charges appear in the next quarterly report, line by
    line, as the agreement and <your regulator's rules> require
measures:
  cycle time: <days> from the period opening to the charges signed
  accuracy: <target> share of periods with no charge corrected later
  volume: <expenses per period>
  quality gate: every charge to the fund names its clause, and every
                company fee shows its offset
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

407 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: allocate fees and expenses   id: <team>/allocate-fees-and-expenses   v1
from: ref/pc/allocate-fees-and-expenses v1
owner: <who>                          effective: <date>
trigger: a fee period opens on <your fee calendar>, <in advance or in
         arrears> as the partnership agreement sets
         watch: record=<fee period> system=<your fund accounting system>
                change=<a fee period opens>
concurrency: one fee period per fund is open at a time - the next
             period's run waits until this one is signed, and an expense
             that arrives after <the cut-off day> goes into the next
             period
goal: the period's fee and expenses charged within <days> of the period
      opening, each on the party the agreement puts it on, with every
      offset applied and no expense over a cap charged to the fund
phases:
  open-period          - system: the period opens with its dates, the
                         funds and vehicles it covers, and the cut-off
                         for expenses
                         owner: capital-account-keeper   after: trigger
                         automation: <level>
  set-fee-basis        - runs assessment: commitments during the
                         investment period, invested capital after it,
                         or whatever basis the agreement sets, with any
                         step-down in the rate of <rate>
                         owner: capital-account-keeper
                         after: open-period         automation: <level>
  apply-fee-terms      - runs assessment: each side letter read for fee
                         discounts, rates for investors who closed early,
                         waivers and most favoured nation elections
                         owner: side-letter-keeper
                         after: set-fee-basis       automation: <level>
  work-out-fee         - runs allocate-and-reconcile: each investor's fee
                         for the period from its basis, its rate and its
                         side letter terms, with partial periods for
                         investors who joined at a later close
                         owner: capital-account-keeper
                         after: apply-fee-terms     automation: <level>
  collect-company-fees - runs collect-and-report: every transaction,
                         monitoring, director and break-up fee that a
                         portfolio company paid the firm, an affiliate
                         or anyone at the firm in the period
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  work-out-offsets     - runs allocate-and-reconcile: the share of those
                         fees the agreement gives back to the fund, at
                         <offset share>, set against each investor's fee,
                         with any excess carried forward as it allows
                         owner: capital-account-keeper
                         after: work-out-fee + collect-company-fees
                         automation: <level>
  gather-expenses      - runs collect-and-report: every invoice and cost
                         that names the fund, a deal or a portfolio
                         company, received by <the cut-off day>
                         owner: capital-account-keeper
                         after: open-period         by: <days>
                         automation: <level>
  classify-expenses    - runs assessment: each expense classed as the
                         fund's, the firm's or a company's, with the
                         clause of the agreement that allows it, and an
                         expense the agreement does not name treated as
                         the firm's
                         owner: capital-account-keeper
                         after: gather-expenses     automation: <level>
  split-shared         - runs allocate-and-reconcile: costs shared across
                         funds, parallel funds and co-investment vehicles
                         split under <your expense allocation policy>
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  allocate-broken-deal - runs allocate-and-reconcile: the costs of deals
                         that did not close, shared among the fund and
                         the co-investors who would have invested, under
                         the same policy
                         owner: capital-account-keeper
                         after: classify-expenses   automation: <level>
  check-caps           - runs assessment: the period's charges against
                         the caps on organizational costs and other
                         expenses in the agreement and every side letter,
                         with the running total for the year
                         owner: side-letter-keeper
                         after: work-out-offsets + split-shared +
                         allocate-broken-deal       automation: <level>
  review-conflicts     - runs assessment: every charge that benefits the
                         firm, an affiliate or a person at the firm read
                         for whether the agreement allows the fund to
                         carry it
                         owner: <your chief compliance officer role>
                         after: check-caps          by: <days>
                         automation: never
  check-figures        - runs assessment: the fee, the offsets and the
                         allocations worked out again from the same
                         inputs, without sight of the first answer, by
                         the outside fund administrator where the firm
                         uses one to check its work, or by <your
                         controller role>
                         owner: <your independent check role>
                         after: review-conflicts    by: <days>
                         automation: <level>
  sign-charges         - convenes approval: <your CFO role> signs the
                         period's fee, offsets and expenses as a named
                         signer
                         owner: <your CFO role>
                         after: check-figures       by: <days>
                         automation: never
  verify-instructions  - runs assessment: the account of every payee,
                         the firm included, checked against <your
                         verified payee record>, and any change confirmed
                         by a call to a number already on file
                         owner: wire-check
                         after: sign-charges        automation: <level>
  release-payments     - convenes approval: <your CFO role> and <your
                         second signer role> each sign the fee and
                         expense payments in the bank portal, against
                         the signed charges and the verified accounts
                         owner: <your CFO role>
                         after: verify-instructions by: <days>
                         automation: never
  post-charges         - system: each investor's share of the fee, the
                         offsets and the expenses booked to its capital
                         account
                         owner: capital-account-keeper
                         after: sign-charges        automation: <level>
  bill-others          - human: the firm billed for the firm's costs the
                         fund paid, and each company billed for its own,
                         with the date each bill is due
                         owner: capital-account-keeper
                         after: post-charges        by: <days>
                         automation: <level>
  record-learning      - convenes debrief: what was moved between the
                         fund and the firm, what a cap stopped, what
                         compliance refused, and what the next period
                         does differently
                         owner: capital-account-keeper
                         after: release-payments + bill-others
                         automation: <level>
run-scoped:
  cap-tracker - runs allocate-and-reconcile     owner: side-letter-keeper
                from: check-caps   until: run close
  close-date  - runs roll-call                  owner: capital-account-keeper
                every: <cadence>
                from: open-period  until: sign-charges
handoffs:
  open-period -> set-fee-basis [fee-period]: the period, the funds and
    vehicles it covers, and the cut-off for expenses
  set-fee-basis -> apply-fee-terms [fee-basis]: the basis and the rate
    for the period, with the clause each rests on
  apply-fee-terms -> work-out-fee [fee-terms]: each investor's fee terms
    from its side letter, with the clause for each
  work-out-fee -> work-out-offsets [gross-fees]: each investor's fee
    before offsets, summing to the fund's fee to the cent
  collect-company-fees -> work-out-offsets [company-fees]: every fee a
    company paid the firm or its people, with the invoice and the date
  work-out-offsets -> check-caps [net-fees]: each investor's fee after
    offsets, and any excess carried forward
  gather-expenses -> classify-expenses [period-expenses]: every expense
    received by the cut-off, with its invoice
  classify-expenses -> split-shared / allocate-broken-deal
    [classified-expenses]: each expense with its class and the clause
    that allows it
  split-shared -> check-caps [shared-cost-split]: each shared cost and
    the share each fund and vehicle carries
  allocate-broken-deal -> check-caps [broken-deal-split]: the costs of
    each deal that did not close, and who carries them
  check-caps -> review-conflicts [capped-charges]: the charges inside
    the caps, and any excess moved to the firm
  review-conflicts -> check-figures [reviewed-charges]: the charges
    compliance cleared, and the reason for each one it refused
  check-figures -> sign-charges [checked-charges]: the charges as both
    workings agree them, with the name of whoever checked them
  sign-charges -> verify-instructions / post-charges [signed-charges]:
    the signed fee, offsets and expenses. A change to any line voids the
    signature
  verify-instructions -> release-payments [verified-payees]: each
    payee's account, confirmed against the record, and the date
  release-payments -> record-learning [released-payments]: every
    payment signed, with its amount, payee and bank reference
  post-charges -> bill-others [posted-charges]: each capital account
    after the period's charges
  bill-others -> record-learning [bills-issued]: each bill to the firm
    or a company, with its amount and due date
deviations:
  check-caps -> classify-expenses [cap-broken]: a charge breaks a cap,
    so the excess is classed as the firm's and the split is worked again
  review-conflicts -> classify-expenses [charge-refused]: compliance
    refuses a charge the fund may not carry, so it is classed as the
    firm's
  check-figures -> work-out-fee [workings-disagree]: the two workings
    disagree, so the figures are worked out again and the difference is
    traced before anything is signed
  sign-charges -> classify-expenses [signer-refuses]: the CFO will not
    sign a charge, so it is classed again on the line the CFO named
  release-payments -> sign-charges [payment-not-signed]: a signer will
    not sign a payment, so the charge behind it goes back to the CFO
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, or the outside fund administrator where it holds
           capital-account-keeper or wire-check for the firm, and named
           people for the CFO, the second signer, the controller and the
           chief compliance officer>
  systems: the fund accounting system (write), the bank portal (read),
           the side letter register (read), the portfolio reporting
           system (read), <your accounts payable system> (write), <your
           verified payee record> (read), the notification channel
           (write)
  data:    the partnership agreement <version>, every side letter at
           its current version and the elections made under it, <your
           expense allocation policy> <version>, <your fee calendar>,
           the firm's conflicts policy <version>
policy:
  every expense charged to the fund names the clause of the partnership
    agreement that allows it, and an expense the agreement does not name
    is the firm's
  fees the firm or its people take from portfolio companies are offset
    at <offset share> as the agreement requires, whoever received them
  shared costs are split by <your expense allocation policy>, applied
    the same way to every fund and vehicle that shares them
  a charge over a cap is the firm's, and a cap is raised only with the
    consent the agreement requires, sought at
    ref/pc/seek-an-advisory-committee-consent
  every charge that benefits the firm is read by <your chief compliance
    officer role> before it is signed
  the figures are worked out again by someone other than whoever worked
    them first
  every payment is signed in the bank portal by two named people
    against a verified account, and no agent releases money
  the period's charges appear in the next quarterly report, line by
    line, as the agreement and <your regulator's rules> require
measures:
  cycle time: <days> from the period opening to the charges signed
  accuracy: <target> share of periods with no charge corrected later
  volume: <expenses per period>
  quality gate: every charge to the fund names its clause, and every
                company fee shows its offset
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

54 blanks to fill. Everything else is the process.

this process from: ref/pc/allocate-fees-and-expenses v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.