Catalog / Business processes / Private capital / Exits / Run a Sale Process
reference process · private-capital · 19 activities · 14 on the roster
Run a Sale Process
The investment committee has approved an exit, and the route is a sale. This process chooses the adviser who will run it against criteria written first, prepares the company's information, and takes it to the buyers the plan named. First bids narrow the field, and the buyers left in do their diligence in the data room, answered by the company's chief financial officer (CFO) and its team. The final bids are compared on price, certainty and terms, and on what each one actually pays the fund. The sale agreement is negotiated with the chosen buyer, the committee and the company's board approve the final terms, and the sellers sign. Before closing, the proceeds are checked against the cap table so every class of share is paid what its rights say. The run closes when the fund's money has arrived, any amount held back for claims has its release date on the record, and the result is set against the plan.
The goals
Sell at or above the floor price
Close the sale within 9 months of approval
Keep proceeds held back under 10%
Hold sale costs under 2% of proceeds
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
19 activities from the committee approves a sale as the exit route to the sale closed, the fund paid, and the result set against the plan, 4 of them gates a person has to sign.
Run a Sale Process the committee approves a sale as the exit route → the sale closed, the fund paid, and the result set against the plan
too few bids to keep a contest no final bid reaches the floor the buyer cuts its price after diligence the committee will not approve the terms the board will not approve the sale a condition will not be met in time the payout does not match the cap table the money differs from the funds flow the committee approves a sale as the exit route 1 Take in the Approved Exit Plan route, timing, buyers, floor and conditions 2 Choose the Sell-Side Adviser advisers scored against criteria written first 3 Sign the Adviser's Engagement the scope, the fee and the term, signed a person signs · never an agent 4 Prepare the Company's Information the memorandum, the model and any report for buyers 5 Open the Data Room documents indexed, and access set buyer by buyer 6 Approach the Buyers the teaser out, and confidentiality agreements signed 7 Take in the First Bids each bid logged with its price and its conditions 8 Choose Who Goes to the Second Round the buyers kept in, and why each one was kept 9 Answer the Buyers' Diligence every question logged, answered and dated 10 Take in the Final Bids and Markups final prices, and each buyer's markup of the agreement 11 Compare the Final Bids price, certainty, terms and what each pays the fund 12 Negotiate the Sale Agreement each ask logged, priced and closed one at a time 13 Approve the Final Terms the committee approves the price and the terms a person signs · never an agent 14 Approve the Sale at the Company's Board the board votes the sale, as the law requires a person signs · never an agent 15 Sign the Sale Agreement each seller signs the version that was approved a person signs · never an agent 16 Meet the Conditions to Close approvals, consents and filings, each with an owner 17 Check the Proceeds against the Cap Table each class paid what its rights and the charter say 18 Confirm the Money Has Arrived the fund's proceeds matched to the funds flow 19 Record the Result against the Plan price, return, holdbacks and what was learned the sale closed, the fund paid, and the result set against the plan
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: run a sale process id: <team> /run-a-sale-process v1
from: ref/pc/run-a-sale-process v1
owner: <who> effective: <date>
trigger: the investment committee approves an exit plan whose route is
a sale of the company, or of the fund's shares in it
watch: record=<exit plan>
system=<your deal pipeline>
change=<the committee approves a sale as the route>
concurrency: one company is in one sale run at a time, and <how many>
sales may run across the fund at once. Funds that sell the
same company sell in the same run
goal: the holding sold at or above the floor within <months> of the
committee's approval, the proceeds matched to the cap table and
received in full, and every amount held back recorded with its
release date
phases:
take-in-plan - human: read the approved exit plan and write
down the route, the timing, the buyers, the
floor and every condition the committee set
owner: exit-planner after: trigger
automation: <level>
choose-adviser - runs assessment: candidate advisers scored
against criteria written before any was
approached: sales in the sector, reach to the
buyers, the team, conflicts and the fee
owner: supplier-check after: take-in-plan
by: <weeks> automation: <level>
engage-adviser - convenes approval: the engagement letter with
the scope, the fee, the term and any fee owed on
a later sale, signed by <who>
owner: <your deal lead role>
after: choose-adviser automation: never
prepare-information - human: the teaser, the information memorandum,
the financial model and any report the fund
commissions for buyers, each checked against the
company's records
owner: exit-planner after: engage-adviser
by: <weeks> automation: <level>
open-data-room - system: the documents loaded and indexed, and
access set for each buyer by stage, with every
view logged
owner: exit-planner
after: prepare-information automation: <level>
approach-buyers - human: the teaser sent to each buyer on the
approved list, and the information memorandum
released to a buyer only once its
confidentiality agreement has been signed
owner: <your sell-side adviser>
after: prepare-information automation: <level>
take-first-bids - runs collect-and-report: each first bid logged
with its price, how it will be paid for, its
conditions and the diligence it still needs
owner: negotiation-coordinator
after: approach-buyers by: <date>
automation: <level>
choose-second-round - convenes decide-and-announce: the buyers kept
in for the second round, why each was kept, and
why each other buyer was let go
owner: <your deal lead role>
after: take-first-bids automation: <level>
answer-diligence - runs collect-and-report: every buyer question
logged, answered from the company's records and
dated, and posted to every buyer in the round
when it is not specific to one buyer
owner: exit-planner
after: choose-second-round + open-data-room
by: <weeks> automation: <level>
take-final-bids - runs collect-and-report: each final price, and
each buyer's markup of the sale agreement logged
clause by clause
owner: negotiation-coordinator
after: answer-diligence by: <date>
automation: <level>
compare-bids - runs assessment: each final bid read for price,
certainty of closing, financing, the promises
asked of the sellers, escrow and timing, and for
what it pays the fund after the debt and the
preferences
owner: negotiation-coordinator
after: take-final-bids automation: <level>
negotiate-agreement - human: the chosen buyer's asks worked through
one at a time, each closed as given, traded or
refused, with the person who agreed it named
owner: <your deal lead role>
after: compare-bids by: <weeks>
automation: <level>
approve-terms - convenes approval: the investment committee
approves the final price and terms, or sends
them back with its reasons
owner: <your investment committee>
after: negotiate-agreement automation: never
board-approval - convenes approval: the company's board votes the
sale, and the shareholder consents the law and
the shareholders' agreement require are
collected
owner: <your portfolio company board>
after: approve-terms automation: never
sign-agreement - convenes approval: each seller signs the
approved version, in the order and under the
authority the signature path names
owner: <your authorized signer role>
after: board-approval automation: never
meet-conditions - runs collect-and-report: every condition to
close, such as competition filings, consents
from third parties and the buyer's financing,
each with an owner and a date
owner: exit-planner after: sign-agreement
by: <the outside date> automation: <level>
check-proceeds - runs assessment: the funds flow and the payout
schedule read against the cap table record, so
each class and each holder is paid what its
rights say, with escrow, fees and debt taken
where the agreement puts them
owner: cap-table-keeper
after: meet-conditions automation: <level>
confirm-receipt - system: the fund's proceeds matched in the bank
portal to the funds flow, by amount, date and
sender
owner: wire-check
after: check-proceeds automation: <level>
record-result - convenes debrief: the price and the return
against the plan, the amounts held back with
their release dates, and what the sale taught
owner: exit-planner
after: confirm-receipt or compare-bids,
whichever ends the sale
automation: <level>
run-scoped:
status - runs roll-call owner: exit-planner
every: <cadence>
from: engage-adviser until: confirm-receipt
ask-log - runs collect-and-report owner: negotiation-coordinator
from: take-final-bids until: sign-agreement
costs - runs allocate-and-reconcile owner: <your CFO role>
from: engage-adviser until: run close
handoffs:
take-in-plan -> choose-adviser [sale-brief]: the route, the timing,
the buyers, the floor and the committee's conditions
choose-adviser -> engage-adviser [adviser-choice]: the adviser chosen,
the scoring sheet for every candidate, and the conflicts declared
engage-adviser -> prepare-information [adviser-engagement]: the signed
engagement letter, its fee terms and its term
prepare-information -> open-data-room / approach-buyers
[sale-materials]: the teaser, the memorandum, the model and any
report for buyers, each at a version
open-data-room -> answer-diligence [data-room-index]: the index, and
the access each buyer has at each stage
approach-buyers -> take-first-bids [buyers-approached]: each buyer
approached, its signed confidentiality agreement, and the date it
received the memorandum
take-first-bids -> choose-second-round [first-bids]: each first bid,
its price, its funding and its conditions
choose-second-round -> answer-diligence [second-round-buyers]: the
buyers kept in, and the reason for each one kept or let go
answer-diligence -> take-final-bids [diligence-log]: every question
and answer, dated, with what was posted to every buyer
take-final-bids -> compare-bids [final-bids]: each final price and
each markup of the agreement, clause by clause
compare-bids -> negotiate-agreement [bid-comparison]: the bids side
by side, with what each pays the fund after the debt and the
preferences
negotiate-agreement -> approve-terms [agreed-terms]: every ask closed
as given, traded or refused, and the agreement at a version
approve-terms -> board-approval [approved-terms]: the price and terms
the committee approved, and any condition it set
board-approval -> sign-agreement [board-resolution]: the board's
resolution and the shareholder consents collected
sign-agreement -> meet-conditions [signed-agreement]: the executed
agreement, its signers, its date and the conditions to close
meet-conditions -> check-proceeds [conditions-met]: each condition met
or waived in writing, with the date and the person who confirmed it
check-proceeds -> confirm-receipt [checked-funds-flow]: the funds
flow as checked, and what the fund is owed at closing
confirm-receipt -> record-result [proceeds-received]: the money
received, matched to the funds flow, and the amounts held back
deviations:
take-first-bids -> approach-buyers [too-few-bids]: too few bids came
in to keep a contest, so more buyers are approached from the plan's
list before the field is narrowed
compare-bids -> record-result [no-bid-reaches-floor]: no final bid
reaches the floor, so the sale stops and the result goes back to
the committee with the bids as they stood
negotiate-agreement -> compare-bids [price-cut-after-diligence]: the
chosen buyer cuts its price after diligence, so its bid is compared
again with the others still open
approve-terms -> negotiate-agreement [committee-will-not-approve]:
the committee will not approve the terms, so the terms it named go
back to the table
board-approval -> negotiate-agreement [board-will-not-approve]: the
company's board will not approve the sale, so the terms the board
named go back to the table
meet-conditions -> negotiate-agreement [condition-will-not-be-met]: a
condition will not be met by the outside date, so the parties
agree a new date or new terms, or the agreement is ended as it
provides
check-proceeds -> meet-conditions [payout-does-not-match]: the payout
does not match the cap table, so the closing is held until the
funds flow is corrected
confirm-receipt -> check-proceeds [receipt-differs]: the money
received differs from the funds flow, so the difference is traced
before the sale is recorded as settled
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the deal lead, the sell-side
adviser, counsel, the members of the investment committee,
the company's board, the authorized signers, the controller
and the company's CFO>
systems: the deal pipeline (write), the data room (write),
the cap table record (read), the signature system (write),
the bank portal (read), the fund accounting system (write),
the notification channel (write)
data: the approved exit plan <version> , the shareholders'
agreement and the company's charter at their current
versions, <your adviser selection criteria> <version> ,
<your delegation of authority> <version> , the sale
agreement at a version, the funds flow at a version
policy:
no buyer sees the information memorandum before its confidentiality
agreement is signed, and every confidentiality agreement is signed
by a person the delegation of authority names
every buyer in a round gets the same information at the same time,
and an answer that is not specific to one buyer is posted for all
the fund sells only at or above the floor the committee set, and only
the committee moves the floor
the committee's approval, the board's vote and every signature are
human gates and are never delegated to an agent
the proceeds are checked against the cap table before the funds flow
is final, and a difference holds the closing
management's interest in which buyer wins is disclosed to the board
before a buyer is chosen
a buyer related to the firm needs the limited partner advisory
committee's consent before the terms are approved
money owed to the fund later is recorded with its amount, its
conditions and its release date
the adviser is chosen against criteria written before any adviser was
approached
measures:
cycle time: <weeks> from the approved plan to the money received
price: <target> for the price achieved against the floor and the plan
certainty: <target> share of signed sales that close
volume: <sales per year>
quality gate: every payment to the fund ties to the cap table and the
funds flow, and every amount held back has a release
date
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
367 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: run a sale process id: <team>/run-a-sale-process v1
from: ref/pc/run-a-sale-process v1
owner: <who> effective: <date>
trigger: the investment committee approves an exit plan whose route is
a sale of the company, or of the fund's shares in it
watch: record=<exit plan>
system=<your deal pipeline>
change=<the committee approves a sale as the route>
concurrency: one company is in one sale run at a time, and <how many>
sales may run across the fund at once. Funds that sell the
same company sell in the same run
goal: the holding sold at or above the floor within <months> of the
committee's approval, the proceeds matched to the cap table and
received in full, and every amount held back recorded with its
release date
phases:
take-in-plan - human: read the approved exit plan and write
down the route, the timing, the buyers, the
floor and every condition the committee set
owner: exit-planner after: trigger
automation: <level>
choose-adviser - runs assessment: candidate advisers scored
against criteria written before any was
approached: sales in the sector, reach to the
buyers, the team, conflicts and the fee
owner: supplier-check after: take-in-plan
by: <weeks> automation: <level>
engage-adviser - convenes approval: the engagement letter with
the scope, the fee, the term and any fee owed on
a later sale, signed by <who>
owner: <your deal lead role>
after: choose-adviser automation: never
prepare-information - human: the teaser, the information memorandum,
the financial model and any report the fund
commissions for buyers, each checked against the
company's records
owner: exit-planner after: engage-adviser
by: <weeks> automation: <level>
open-data-room - system: the documents loaded and indexed, and
access set for each buyer by stage, with every
view logged
owner: exit-planner
after: prepare-information automation: <level>
approach-buyers - human: the teaser sent to each buyer on the
approved list, and the information memorandum
released to a buyer only once its
confidentiality agreement has been signed
owner: <your sell-side adviser>
after: prepare-information automation: <level>
take-first-bids - runs collect-and-report: each first bid logged
with its price, how it will be paid for, its
conditions and the diligence it still needs
owner: negotiation-coordinator
after: approach-buyers by: <date>
automation: <level>
choose-second-round - convenes decide-and-announce: the buyers kept
in for the second round, why each was kept, and
why each other buyer was let go
owner: <your deal lead role>
after: take-first-bids automation: <level>
answer-diligence - runs collect-and-report: every buyer question
logged, answered from the company's records and
dated, and posted to every buyer in the round
when it is not specific to one buyer
owner: exit-planner
after: choose-second-round + open-data-room
by: <weeks> automation: <level>
take-final-bids - runs collect-and-report: each final price, and
each buyer's markup of the sale agreement logged
clause by clause
owner: negotiation-coordinator
after: answer-diligence by: <date>
automation: <level>
compare-bids - runs assessment: each final bid read for price,
certainty of closing, financing, the promises
asked of the sellers, escrow and timing, and for
what it pays the fund after the debt and the
preferences
owner: negotiation-coordinator
after: take-final-bids automation: <level>
negotiate-agreement - human: the chosen buyer's asks worked through
one at a time, each closed as given, traded or
refused, with the person who agreed it named
owner: <your deal lead role>
after: compare-bids by: <weeks>
automation: <level>
approve-terms - convenes approval: the investment committee
approves the final price and terms, or sends
them back with its reasons
owner: <your investment committee>
after: negotiate-agreement automation: never
board-approval - convenes approval: the company's board votes the
sale, and the shareholder consents the law and
the shareholders' agreement require are
collected
owner: <your portfolio company board>
after: approve-terms automation: never
sign-agreement - convenes approval: each seller signs the
approved version, in the order and under the
authority the signature path names
owner: <your authorized signer role>
after: board-approval automation: never
meet-conditions - runs collect-and-report: every condition to
close, such as competition filings, consents
from third parties and the buyer's financing,
each with an owner and a date
owner: exit-planner after: sign-agreement
by: <the outside date> automation: <level>
check-proceeds - runs assessment: the funds flow and the payout
schedule read against the cap table record, so
each class and each holder is paid what its
rights say, with escrow, fees and debt taken
where the agreement puts them
owner: cap-table-keeper
after: meet-conditions automation: <level>
confirm-receipt - system: the fund's proceeds matched in the bank
portal to the funds flow, by amount, date and
sender
owner: wire-check
after: check-proceeds automation: <level>
record-result - convenes debrief: the price and the return
against the plan, the amounts held back with
their release dates, and what the sale taught
owner: exit-planner
after: confirm-receipt or compare-bids,
whichever ends the sale
automation: <level>
run-scoped:
status - runs roll-call owner: exit-planner
every: <cadence>
from: engage-adviser until: confirm-receipt
ask-log - runs collect-and-report owner: negotiation-coordinator
from: take-final-bids until: sign-agreement
costs - runs allocate-and-reconcile owner: <your CFO role>
from: engage-adviser until: run close
handoffs:
take-in-plan -> choose-adviser [sale-brief]: the route, the timing,
the buyers, the floor and the committee's conditions
choose-adviser -> engage-adviser [adviser-choice]: the adviser chosen,
the scoring sheet for every candidate, and the conflicts declared
engage-adviser -> prepare-information [adviser-engagement]: the signed
engagement letter, its fee terms and its term
prepare-information -> open-data-room / approach-buyers
[sale-materials]: the teaser, the memorandum, the model and any
report for buyers, each at a version
open-data-room -> answer-diligence [data-room-index]: the index, and
the access each buyer has at each stage
approach-buyers -> take-first-bids [buyers-approached]: each buyer
approached, its signed confidentiality agreement, and the date it
received the memorandum
take-first-bids -> choose-second-round [first-bids]: each first bid,
its price, its funding and its conditions
choose-second-round -> answer-diligence [second-round-buyers]: the
buyers kept in, and the reason for each one kept or let go
answer-diligence -> take-final-bids [diligence-log]: every question
and answer, dated, with what was posted to every buyer
take-final-bids -> compare-bids [final-bids]: each final price and
each markup of the agreement, clause by clause
compare-bids -> negotiate-agreement [bid-comparison]: the bids side
by side, with what each pays the fund after the debt and the
preferences
negotiate-agreement -> approve-terms [agreed-terms]: every ask closed
as given, traded or refused, and the agreement at a version
approve-terms -> board-approval [approved-terms]: the price and terms
the committee approved, and any condition it set
board-approval -> sign-agreement [board-resolution]: the board's
resolution and the shareholder consents collected
sign-agreement -> meet-conditions [signed-agreement]: the executed
agreement, its signers, its date and the conditions to close
meet-conditions -> check-proceeds [conditions-met]: each condition met
or waived in writing, with the date and the person who confirmed it
check-proceeds -> confirm-receipt [checked-funds-flow]: the funds
flow as checked, and what the fund is owed at closing
confirm-receipt -> record-result [proceeds-received]: the money
received, matched to the funds flow, and the amounts held back
deviations:
take-first-bids -> approach-buyers [too-few-bids]: too few bids came
in to keep a contest, so more buyers are approached from the plan's
list before the field is narrowed
compare-bids -> record-result [no-bid-reaches-floor]: no final bid
reaches the floor, so the sale stops and the result goes back to
the committee with the bids as they stood
negotiate-agreement -> compare-bids [price-cut-after-diligence]: the
chosen buyer cuts its price after diligence, so its bid is compared
again with the others still open
approve-terms -> negotiate-agreement [committee-will-not-approve]:
the committee will not approve the terms, so the terms it named go
back to the table
board-approval -> negotiate-agreement [board-will-not-approve]: the
company's board will not approve the sale, so the terms the board
named go back to the table
meet-conditions -> negotiate-agreement [condition-will-not-be-met]: a
condition will not be met by the outside date, so the parties
agree a new date or new terms, or the agreement is ended as it
provides
check-proceeds -> meet-conditions [payout-does-not-match]: the payout
does not match the cap table, so the closing is held until the
funds flow is corrected
confirm-receipt -> check-proceeds [receipt-differs]: the money
received differs from the funds flow, so the difference is traced
before the sale is recorded as settled
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the deal lead, the sell-side
adviser, counsel, the members of the investment committee,
the company's board, the authorized signers, the controller
and the company's CFO>
systems: the deal pipeline (write), the data room (write),
the cap table record (read), the signature system (write),
the bank portal (read), the fund accounting system (write),
the notification channel (write)
data: the approved exit plan <version>, the shareholders'
agreement and the company's charter at their current
versions, <your adviser selection criteria> <version>,
<your delegation of authority> <version>, the sale
agreement at a version, the funds flow at a version
policy:
no buyer sees the information memorandum before its confidentiality
agreement is signed, and every confidentiality agreement is signed
by a person the delegation of authority names
every buyer in a round gets the same information at the same time,
and an answer that is not specific to one buyer is posted for all
the fund sells only at or above the floor the committee set, and only
the committee moves the floor
the committee's approval, the board's vote and every signature are
human gates and are never delegated to an agent
the proceeds are checked against the cap table before the funds flow
is final, and a difference holds the closing
management's interest in which buyer wins is disclosed to the board
before a buyer is chosen
a buyer related to the firm needs the limited partner advisory
committee's consent before the terms are approved
money owed to the fund later is recorded with its amount, its
conditions and its release date
the adviser is chosen against criteria written before any adviser was
approached
measures:
cycle time: <weeks> from the approved plan to the money received
price: <target> for the price achieved against the floor and the plan
certainty: <target> share of signed sales that close
volume: <sales per year>
quality gate: every payment to the fund ties to the cap table and the
funds flow, and every amount held back has a release
date
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
422 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: run a sale process id: <team>/run-a-sale-process v1
from: ref/pc/run-a-sale-process v1
owner: <who> effective: <date>
trigger: the investment committee approves an exit plan whose route is
a sale of the company, or of the fund's shares in it
watch: record=<exit plan>
system=<your deal pipeline>
change=<the committee approves a sale as the route>
concurrency: one company is in one sale run at a time, and <how many>
sales may run across the fund at once. Funds that sell the
same company sell in the same run
goal: the holding sold at or above the floor within <months> of the
committee's approval, the proceeds matched to the cap table and
received in full, and every amount held back recorded with its
release date
phases:
take-in-plan - human: read the approved exit plan and write
down the route, the timing, the buyers, the
floor and every condition the committee set
owner: exit-planner after: trigger
automation: <level>
choose-adviser - runs assessment: candidate advisers scored
against criteria written before any was
approached: sales in the sector, reach to the
buyers, the team, conflicts and the fee
owner: supplier-check after: take-in-plan
by: <weeks> automation: <level>
engage-adviser - convenes approval: the engagement letter with
the scope, the fee, the term and any fee owed on
a later sale, signed by <who>
owner: <your deal lead role>
after: choose-adviser automation: never
prepare-information - human: the teaser, the information memorandum,
the financial model and any report the fund
commissions for buyers, each checked against the
company's records
owner: exit-planner after: engage-adviser
by: <weeks> automation: <level>
open-data-room - system: the documents loaded and indexed, and
access set for each buyer by stage, with every
view logged
owner: exit-planner
after: prepare-information automation: <level>
approach-buyers - human: the teaser sent to each buyer on the
approved list, and the information memorandum
released to a buyer only once its
confidentiality agreement has been signed
owner: <your sell-side adviser>
after: prepare-information automation: <level>
take-first-bids - runs collect-and-report: each first bid logged
with its price, how it will be paid for, its
conditions and the diligence it still needs
owner: negotiation-coordinator
after: approach-buyers by: <date>
automation: <level>
choose-second-round - convenes decide-and-announce: the buyers kept
in for the second round, why each was kept, and
why each other buyer was let go
owner: <your deal lead role>
after: take-first-bids automation: <level>
answer-diligence - runs collect-and-report: every buyer question
logged, answered from the company's records and
dated, and posted to every buyer in the round
when it is not specific to one buyer
owner: exit-planner
after: choose-second-round + open-data-room
by: <weeks> automation: <level>
take-final-bids - runs collect-and-report: each final price, and
each buyer's markup of the sale agreement logged
clause by clause
owner: negotiation-coordinator
after: answer-diligence by: <date>
automation: <level>
compare-bids - runs assessment: each final bid read for price,
certainty of closing, financing, the promises
asked of the sellers, escrow and timing, and for
what it pays the fund after the debt and the
preferences
owner: negotiation-coordinator
after: take-final-bids automation: <level>
negotiate-agreement - human: the chosen buyer's asks worked through
one at a time, each closed as given, traded or
refused, with the person who agreed it named
owner: <your deal lead role>
after: compare-bids by: <weeks>
automation: <level>
approve-terms - convenes approval: the investment committee
approves the final price and terms, or sends
them back with its reasons
owner: <your investment committee>
after: negotiate-agreement automation: never
board-approval - convenes approval: the company's board votes the
sale, and the shareholder consents the law and
the shareholders' agreement require are
collected
owner: <your portfolio company board>
after: approve-terms automation: never
sign-agreement - convenes approval: each seller signs the
approved version, in the order and under the
authority the signature path names
owner: <your authorized signer role>
after: board-approval automation: never
meet-conditions - runs collect-and-report: every condition to
close, such as competition filings, consents
from third parties and the buyer's financing,
each with an owner and a date
owner: exit-planner after: sign-agreement
by: <the outside date> automation: <level>
check-proceeds - runs assessment: the funds flow and the payout
schedule read against the cap table record, so
each class and each holder is paid what its
rights say, with escrow, fees and debt taken
where the agreement puts them
owner: cap-table-keeper
after: meet-conditions automation: <level>
confirm-receipt - system: the fund's proceeds matched in the bank
portal to the funds flow, by amount, date and
sender
owner: wire-check
after: check-proceeds automation: <level>
record-result - convenes debrief: the price and the return
against the plan, the amounts held back with
their release dates, and what the sale taught
owner: exit-planner
after: confirm-receipt or compare-bids,
whichever ends the sale
automation: <level>
run-scoped:
status - runs roll-call owner: exit-planner
every: <cadence>
from: engage-adviser until: confirm-receipt
ask-log - runs collect-and-report owner: negotiation-coordinator
from: take-final-bids until: sign-agreement
costs - runs allocate-and-reconcile owner: <your CFO role>
from: engage-adviser until: run close
handoffs:
take-in-plan -> choose-adviser [sale-brief]: the route, the timing,
the buyers, the floor and the committee's conditions
choose-adviser -> engage-adviser [adviser-choice]: the adviser chosen,
the scoring sheet for every candidate, and the conflicts declared
engage-adviser -> prepare-information [adviser-engagement]: the signed
engagement letter, its fee terms and its term
prepare-information -> open-data-room / approach-buyers
[sale-materials]: the teaser, the memorandum, the model and any
report for buyers, each at a version
open-data-room -> answer-diligence [data-room-index]: the index, and
the access each buyer has at each stage
approach-buyers -> take-first-bids [buyers-approached]: each buyer
approached, its signed confidentiality agreement, and the date it
received the memorandum
take-first-bids -> choose-second-round [first-bids]: each first bid,
its price, its funding and its conditions
choose-second-round -> answer-diligence [second-round-buyers]: the
buyers kept in, and the reason for each one kept or let go
answer-diligence -> take-final-bids [diligence-log]: every question
and answer, dated, with what was posted to every buyer
take-final-bids -> compare-bids [final-bids]: each final price and
each markup of the agreement, clause by clause
compare-bids -> negotiate-agreement [bid-comparison]: the bids side
by side, with what each pays the fund after the debt and the
preferences
negotiate-agreement -> approve-terms [agreed-terms]: every ask closed
as given, traded or refused, and the agreement at a version
approve-terms -> board-approval [approved-terms]: the price and terms
the committee approved, and any condition it set
board-approval -> sign-agreement [board-resolution]: the board's
resolution and the shareholder consents collected
sign-agreement -> meet-conditions [signed-agreement]: the executed
agreement, its signers, its date and the conditions to close
meet-conditions -> check-proceeds [conditions-met]: each condition met
or waived in writing, with the date and the person who confirmed it
check-proceeds -> confirm-receipt [checked-funds-flow]: the funds
flow as checked, and what the fund is owed at closing
confirm-receipt -> record-result [proceeds-received]: the money
received, matched to the funds flow, and the amounts held back
deviations:
take-first-bids -> approach-buyers [too-few-bids]: too few bids came
in to keep a contest, so more buyers are approached from the plan's
list before the field is narrowed
compare-bids -> record-result [no-bid-reaches-floor]: no final bid
reaches the floor, so the sale stops and the result goes back to
the committee with the bids as they stood
negotiate-agreement -> compare-bids [price-cut-after-diligence]: the
chosen buyer cuts its price after diligence, so its bid is compared
again with the others still open
approve-terms -> negotiate-agreement [committee-will-not-approve]:
the committee will not approve the terms, so the terms it named go
back to the table
board-approval -> negotiate-agreement [board-will-not-approve]: the
company's board will not approve the sale, so the terms the board
named go back to the table
meet-conditions -> negotiate-agreement [condition-will-not-be-met]: a
condition will not be met by the outside date, so the parties
agree a new date or new terms, or the agreement is ended as it
provides
check-proceeds -> meet-conditions [payout-does-not-match]: the payout
does not match the cap table, so the closing is held until the
funds flow is corrected
confirm-receipt -> check-proceeds [receipt-differs]: the money
received differs from the funds flow, so the difference is traced
before the sale is recorded as settled
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the deal lead, the sell-side
adviser, counsel, the members of the investment committee,
the company's board, the authorized signers, the controller
and the company's CFO>
systems: the deal pipeline (write), the data room (write),
the cap table record (read), the signature system (write),
the bank portal (read), the fund accounting system (write),
the notification channel (write)
data: the approved exit plan <version>, the shareholders'
agreement and the company's charter at their current
versions, <your adviser selection criteria> <version>,
<your delegation of authority> <version>, the sale
agreement at a version, the funds flow at a version
policy:
no buyer sees the information memorandum before its confidentiality
agreement is signed, and every confidentiality agreement is signed
by a person the delegation of authority names
every buyer in a round gets the same information at the same time,
and an answer that is not specific to one buyer is posted for all
the fund sells only at or above the floor the committee set, and only
the committee moves the floor
the committee's approval, the board's vote and every signature are
human gates and are never delegated to an agent
the proceeds are checked against the cap table before the funds flow
is final, and a difference holds the closing
management's interest in which buyer wins is disclosed to the board
before a buyer is chosen
a buyer related to the firm needs the limited partner advisory
committee's consent before the terms are approved
money owed to the fund later is recorded with its amount, its
conditions and its release date
the adviser is chosen against criteria written before any adviser was
approached
measures:
cycle time: <weeks> from the approved plan to the money received
price: <target> for the price achieved against the floor and the plan
certainty: <target> share of signed sales that close
volume: <sales per year>
quality gate: every payment to the fund ties to the cap table and the
funds flow, and every amount held back has a release
date
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
427 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: run a sale process id: <team>/run-a-sale-process v1
from: ref/pc/run-a-sale-process v1
owner: <who> effective: <date>
trigger: the investment committee approves an exit plan whose route is
a sale of the company, or of the fund's shares in it
watch: record=<exit plan>
system=<your deal pipeline>
change=<the committee approves a sale as the route>
concurrency: one company is in one sale run at a time, and <how many>
sales may run across the fund at once. Funds that sell the
same company sell in the same run
goal: the holding sold at or above the floor within <months> of the
committee's approval, the proceeds matched to the cap table and
received in full, and every amount held back recorded with its
release date
phases:
take-in-plan - human: read the approved exit plan and write
down the route, the timing, the buyers, the
floor and every condition the committee set
owner: exit-planner after: trigger
automation: <level>
choose-adviser - runs assessment: candidate advisers scored
against criteria written before any was
approached: sales in the sector, reach to the
buyers, the team, conflicts and the fee
owner: supplier-check after: take-in-plan
by: <weeks> automation: <level>
engage-adviser - convenes approval: the engagement letter with
the scope, the fee, the term and any fee owed on
a later sale, signed by <who>
owner: <your deal lead role>
after: choose-adviser automation: never
prepare-information - human: the teaser, the information memorandum,
the financial model and any report the fund
commissions for buyers, each checked against the
company's records
owner: exit-planner after: engage-adviser
by: <weeks> automation: <level>
open-data-room - system: the documents loaded and indexed, and
access set for each buyer by stage, with every
view logged
owner: exit-planner
after: prepare-information automation: <level>
approach-buyers - human: the teaser sent to each buyer on the
approved list, and the information memorandum
released to a buyer only once its
confidentiality agreement has been signed
owner: <your sell-side adviser>
after: prepare-information automation: <level>
take-first-bids - runs collect-and-report: each first bid logged
with its price, how it will be paid for, its
conditions and the diligence it still needs
owner: negotiation-coordinator
after: approach-buyers by: <date>
automation: <level>
choose-second-round - convenes decide-and-announce: the buyers kept
in for the second round, why each was kept, and
why each other buyer was let go
owner: <your deal lead role>
after: take-first-bids automation: <level>
answer-diligence - runs collect-and-report: every buyer question
logged, answered from the company's records and
dated, and posted to every buyer in the round
when it is not specific to one buyer
owner: exit-planner
after: choose-second-round + open-data-room
by: <weeks> automation: <level>
take-final-bids - runs collect-and-report: each final price, and
each buyer's markup of the sale agreement logged
clause by clause
owner: negotiation-coordinator
after: answer-diligence by: <date>
automation: <level>
compare-bids - runs assessment: each final bid read for price,
certainty of closing, financing, the promises
asked of the sellers, escrow and timing, and for
what it pays the fund after the debt and the
preferences
owner: negotiation-coordinator
after: take-final-bids automation: <level>
negotiate-agreement - human: the chosen buyer's asks worked through
one at a time, each closed as given, traded or
refused, with the person who agreed it named
owner: <your deal lead role>
after: compare-bids by: <weeks>
automation: <level>
approve-terms - convenes approval: the investment committee
approves the final price and terms, or sends
them back with its reasons
owner: <your investment committee>
after: negotiate-agreement automation: never
board-approval - convenes approval: the company's board votes the
sale, and the shareholder consents the law and
the shareholders' agreement require are
collected
owner: <your portfolio company board>
after: approve-terms automation: never
sign-agreement - convenes approval: each seller signs the
approved version, in the order and under the
authority the signature path names
owner: <your authorized signer role>
after: board-approval automation: never
meet-conditions - runs collect-and-report: every condition to
close, such as competition filings, consents
from third parties and the buyer's financing,
each with an owner and a date
owner: exit-planner after: sign-agreement
by: <the outside date> automation: <level>
check-proceeds - runs assessment: the funds flow and the payout
schedule read against the cap table record, so
each class and each holder is paid what its
rights say, with escrow, fees and debt taken
where the agreement puts them
owner: cap-table-keeper
after: meet-conditions automation: <level>
confirm-receipt - system: the fund's proceeds matched in the bank
portal to the funds flow, by amount, date and
sender
owner: wire-check
after: check-proceeds automation: <level>
record-result - convenes debrief: the price and the return
against the plan, the amounts held back with
their release dates, and what the sale taught
owner: exit-planner
after: confirm-receipt or compare-bids,
whichever ends the sale
automation: <level>
run-scoped:
status - runs roll-call owner: exit-planner
every: <cadence>
from: engage-adviser until: confirm-receipt
ask-log - runs collect-and-report owner: negotiation-coordinator
from: take-final-bids until: sign-agreement
costs - runs allocate-and-reconcile owner: <your CFO role>
from: engage-adviser until: run close
handoffs:
take-in-plan -> choose-adviser [sale-brief]: the route, the timing,
the buyers, the floor and the committee's conditions
choose-adviser -> engage-adviser [adviser-choice]: the adviser chosen,
the scoring sheet for every candidate, and the conflicts declared
engage-adviser -> prepare-information [adviser-engagement]: the signed
engagement letter, its fee terms and its term
prepare-information -> open-data-room / approach-buyers
[sale-materials]: the teaser, the memorandum, the model and any
report for buyers, each at a version
open-data-room -> answer-diligence [data-room-index]: the index, and
the access each buyer has at each stage
approach-buyers -> take-first-bids [buyers-approached]: each buyer
approached, its signed confidentiality agreement, and the date it
received the memorandum
take-first-bids -> choose-second-round [first-bids]: each first bid,
its price, its funding and its conditions
choose-second-round -> answer-diligence [second-round-buyers]: the
buyers kept in, and the reason for each one kept or let go
answer-diligence -> take-final-bids [diligence-log]: every question
and answer, dated, with what was posted to every buyer
take-final-bids -> compare-bids [final-bids]: each final price and
each markup of the agreement, clause by clause
compare-bids -> negotiate-agreement [bid-comparison]: the bids side
by side, with what each pays the fund after the debt and the
preferences
negotiate-agreement -> approve-terms [agreed-terms]: every ask closed
as given, traded or refused, and the agreement at a version
approve-terms -> board-approval [approved-terms]: the price and terms
the committee approved, and any condition it set
board-approval -> sign-agreement [board-resolution]: the board's
resolution and the shareholder consents collected
sign-agreement -> meet-conditions [signed-agreement]: the executed
agreement, its signers, its date and the conditions to close
meet-conditions -> check-proceeds [conditions-met]: each condition met
or waived in writing, with the date and the person who confirmed it
check-proceeds -> confirm-receipt [checked-funds-flow]: the funds
flow as checked, and what the fund is owed at closing
confirm-receipt -> record-result [proceeds-received]: the money
received, matched to the funds flow, and the amounts held back
deviations:
take-first-bids -> approach-buyers [too-few-bids]: too few bids came
in to keep a contest, so more buyers are approached from the plan's
list before the field is narrowed
compare-bids -> record-result [no-bid-reaches-floor]: no final bid
reaches the floor, so the sale stops and the result goes back to
the committee with the bids as they stood
negotiate-agreement -> compare-bids [price-cut-after-diligence]: the
chosen buyer cuts its price after diligence, so its bid is compared
again with the others still open
approve-terms -> negotiate-agreement [committee-will-not-approve]:
the committee will not approve the terms, so the terms it named go
back to the table
board-approval -> negotiate-agreement [board-will-not-approve]: the
company's board will not approve the sale, so the terms the board
named go back to the table
meet-conditions -> negotiate-agreement [condition-will-not-be-met]: a
condition will not be met by the outside date, so the parties
agree a new date or new terms, or the agreement is ended as it
provides
check-proceeds -> meet-conditions [payout-does-not-match]: the payout
does not match the cap table, so the closing is held until the
funds flow is corrected
confirm-receipt -> check-proceeds [receipt-differs]: the money
received differs from the funds flow, so the difference is traced
before the sale is recorded as settled
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the deal lead, the sell-side
adviser, counsel, the members of the investment committee,
the company's board, the authorized signers, the controller
and the company's CFO>
systems: the deal pipeline (write), the data room (write),
the cap table record (read), the signature system (write),
the bank portal (read), the fund accounting system (write),
the notification channel (write)
data: the approved exit plan <version>, the shareholders'
agreement and the company's charter at their current
versions, <your adviser selection criteria> <version>,
<your delegation of authority> <version>, the sale
agreement at a version, the funds flow at a version
policy:
no buyer sees the information memorandum before its confidentiality
agreement is signed, and every confidentiality agreement is signed
by a person the delegation of authority names
every buyer in a round gets the same information at the same time,
and an answer that is not specific to one buyer is posted for all
the fund sells only at or above the floor the committee set, and only
the committee moves the floor
the committee's approval, the board's vote and every signature are
human gates and are never delegated to an agent
the proceeds are checked against the cap table before the funds flow
is final, and a difference holds the closing
management's interest in which buyer wins is disclosed to the board
before a buyer is chosen
a buyer related to the firm needs the limited partner advisory
committee's consent before the terms are approved
money owed to the fund later is recorded with its amount, its
conditions and its release date
the adviser is chosen against criteria written before any adviser was
approached
measures:
cycle time: <weeks> from the approved plan to the money received
price: <target> for the price achieved against the floor and the plan
certainty: <target> share of signed sales that close
volume: <sales per year>
quality gate: every payment to the fund ties to the cap table and the
funds flow, and every amount held back has a release
date
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
418 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: run a sale process id: <team>/run-a-sale-process v1
from: ref/pc/run-a-sale-process v1
owner: <who> effective: <date>
trigger: the investment committee approves an exit plan whose route is
a sale of the company, or of the fund's shares in it
watch: record=<exit plan>
system=<your deal pipeline>
change=<the committee approves a sale as the route>
concurrency: one company is in one sale run at a time, and <how many>
sales may run across the fund at once. Funds that sell the
same company sell in the same run
goal: the holding sold at or above the floor within <months> of the
committee's approval, the proceeds matched to the cap table and
received in full, and every amount held back recorded with its
release date
phases:
take-in-plan - human: read the approved exit plan and write
down the route, the timing, the buyers, the
floor and every condition the committee set
owner: exit-planner after: trigger
automation: <level>
choose-adviser - runs assessment: candidate advisers scored
against criteria written before any was
approached: sales in the sector, reach to the
buyers, the team, conflicts and the fee
owner: supplier-check after: take-in-plan
by: <weeks> automation: <level>
engage-adviser - convenes approval: the engagement letter with
the scope, the fee, the term and any fee owed on
a later sale, signed by <who>
owner: <your deal lead role>
after: choose-adviser automation: never
prepare-information - human: the teaser, the information memorandum,
the financial model and any report the fund
commissions for buyers, each checked against the
company's records
owner: exit-planner after: engage-adviser
by: <weeks> automation: <level>
open-data-room - system: the documents loaded and indexed, and
access set for each buyer by stage, with every
view logged
owner: exit-planner
after: prepare-information automation: <level>
approach-buyers - human: the teaser sent to each buyer on the
approved list, and the information memorandum
released to a buyer only once its
confidentiality agreement has been signed
owner: <your sell-side adviser>
after: prepare-information automation: <level>
take-first-bids - runs collect-and-report: each first bid logged
with its price, how it will be paid for, its
conditions and the diligence it still needs
owner: negotiation-coordinator
after: approach-buyers by: <date>
automation: <level>
choose-second-round - convenes decide-and-announce: the buyers kept
in for the second round, why each was kept, and
why each other buyer was let go
owner: <your deal lead role>
after: take-first-bids automation: <level>
answer-diligence - runs collect-and-report: every buyer question
logged, answered from the company's records and
dated, and posted to every buyer in the round
when it is not specific to one buyer
owner: exit-planner
after: choose-second-round + open-data-room
by: <weeks> automation: <level>
take-final-bids - runs collect-and-report: each final price, and
each buyer's markup of the sale agreement logged
clause by clause
owner: negotiation-coordinator
after: answer-diligence by: <date>
automation: <level>
compare-bids - runs assessment: each final bid read for price,
certainty of closing, financing, the promises
asked of the sellers, escrow and timing, and for
what it pays the fund after the debt and the
preferences
owner: negotiation-coordinator
after: take-final-bids automation: <level>
negotiate-agreement - human: the chosen buyer's asks worked through
one at a time, each closed as given, traded or
refused, with the person who agreed it named
owner: <your deal lead role>
after: compare-bids by: <weeks>
automation: <level>
approve-terms - convenes approval: the investment committee
approves the final price and terms, or sends
them back with its reasons
owner: <your investment committee>
after: negotiate-agreement automation: never
board-approval - convenes approval: the company's board votes the
sale, and the shareholder consents the law and
the shareholders' agreement require are
collected
owner: <your portfolio company board>
after: approve-terms automation: never
sign-agreement - convenes approval: each seller signs the
approved version, in the order and under the
authority the signature path names
owner: <your authorized signer role>
after: board-approval automation: never
meet-conditions - runs collect-and-report: every condition to
close, such as competition filings, consents
from third parties and the buyer's financing,
each with an owner and a date
owner: exit-planner after: sign-agreement
by: <the outside date> automation: <level>
check-proceeds - runs assessment: the funds flow and the payout
schedule read against the cap table record, so
each class and each holder is paid what its
rights say, with escrow, fees and debt taken
where the agreement puts them
owner: cap-table-keeper
after: meet-conditions automation: <level>
confirm-receipt - system: the fund's proceeds matched in the bank
portal to the funds flow, by amount, date and
sender
owner: wire-check
after: check-proceeds automation: <level>
record-result - convenes debrief: the price and the return
against the plan, the amounts held back with
their release dates, and what the sale taught
owner: exit-planner
after: confirm-receipt or compare-bids,
whichever ends the sale
automation: <level>
run-scoped:
status - runs roll-call owner: exit-planner
every: <cadence>
from: engage-adviser until: confirm-receipt
ask-log - runs collect-and-report owner: negotiation-coordinator
from: take-final-bids until: sign-agreement
costs - runs allocate-and-reconcile owner: <your CFO role>
from: engage-adviser until: run close
handoffs:
take-in-plan -> choose-adviser [sale-brief]: the route, the timing,
the buyers, the floor and the committee's conditions
choose-adviser -> engage-adviser [adviser-choice]: the adviser chosen,
the scoring sheet for every candidate, and the conflicts declared
engage-adviser -> prepare-information [adviser-engagement]: the signed
engagement letter, its fee terms and its term
prepare-information -> open-data-room / approach-buyers
[sale-materials]: the teaser, the memorandum, the model and any
report for buyers, each at a version
open-data-room -> answer-diligence [data-room-index]: the index, and
the access each buyer has at each stage
approach-buyers -> take-first-bids [buyers-approached]: each buyer
approached, its signed confidentiality agreement, and the date it
received the memorandum
take-first-bids -> choose-second-round [first-bids]: each first bid,
its price, its funding and its conditions
choose-second-round -> answer-diligence [second-round-buyers]: the
buyers kept in, and the reason for each one kept or let go
answer-diligence -> take-final-bids [diligence-log]: every question
and answer, dated, with what was posted to every buyer
take-final-bids -> compare-bids [final-bids]: each final price and
each markup of the agreement, clause by clause
compare-bids -> negotiate-agreement [bid-comparison]: the bids side
by side, with what each pays the fund after the debt and the
preferences
negotiate-agreement -> approve-terms [agreed-terms]: every ask closed
as given, traded or refused, and the agreement at a version
approve-terms -> board-approval [approved-terms]: the price and terms
the committee approved, and any condition it set
board-approval -> sign-agreement [board-resolution]: the board's
resolution and the shareholder consents collected
sign-agreement -> meet-conditions [signed-agreement]: the executed
agreement, its signers, its date and the conditions to close
meet-conditions -> check-proceeds [conditions-met]: each condition met
or waived in writing, with the date and the person who confirmed it
check-proceeds -> confirm-receipt [checked-funds-flow]: the funds
flow as checked, and what the fund is owed at closing
confirm-receipt -> record-result [proceeds-received]: the money
received, matched to the funds flow, and the amounts held back
deviations:
take-first-bids -> approach-buyers [too-few-bids]: too few bids came
in to keep a contest, so more buyers are approached from the plan's
list before the field is narrowed
compare-bids -> record-result [no-bid-reaches-floor]: no final bid
reaches the floor, so the sale stops and the result goes back to
the committee with the bids as they stood
negotiate-agreement -> compare-bids [price-cut-after-diligence]: the
chosen buyer cuts its price after diligence, so its bid is compared
again with the others still open
approve-terms -> negotiate-agreement [committee-will-not-approve]:
the committee will not approve the terms, so the terms it named go
back to the table
board-approval -> negotiate-agreement [board-will-not-approve]: the
company's board will not approve the sale, so the terms the board
named go back to the table
meet-conditions -> negotiate-agreement [condition-will-not-be-met]: a
condition will not be met by the outside date, so the parties
agree a new date or new terms, or the agreement is ended as it
provides
check-proceeds -> meet-conditions [payout-does-not-match]: the payout
does not match the cap table, so the closing is held until the
funds flow is corrected
confirm-receipt -> check-proceeds [receipt-differs]: the money
received differs from the funds flow, so the difference is traced
before the sale is recorded as settled
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the deal lead, the sell-side
adviser, counsel, the members of the investment committee,
the company's board, the authorized signers, the controller
and the company's CFO>
systems: the deal pipeline (write), the data room (write),
the cap table record (read), the signature system (write),
the bank portal (read), the fund accounting system (write),
the notification channel (write)
data: the approved exit plan <version>, the shareholders'
agreement and the company's charter at their current
versions, <your adviser selection criteria> <version>,
<your delegation of authority> <version>, the sale
agreement at a version, the funds flow at a version
policy:
no buyer sees the information memorandum before its confidentiality
agreement is signed, and every confidentiality agreement is signed
by a person the delegation of authority names
every buyer in a round gets the same information at the same time,
and an answer that is not specific to one buyer is posted for all
the fund sells only at or above the floor the committee set, and only
the committee moves the floor
the committee's approval, the board's vote and every signature are
human gates and are never delegated to an agent
the proceeds are checked against the cap table before the funds flow
is final, and a difference holds the closing
management's interest in which buyer wins is disclosed to the board
before a buyer is chosen
a buyer related to the firm needs the limited partner advisory
committee's consent before the terms are approved
money owed to the fund later is recorded with its amount, its
conditions and its release date
the adviser is chosen against criteria written before any adviser was
approached
measures:
cycle time: <weeks> from the approved plan to the money received
price: <target> for the price achieved against the floor and the plan
certainty: <target> share of signed sales that close
volume: <sales per year>
quality gate: every payment to the fund ties to the cap table and the
funds flow, and every amount held back has a release
date
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
49 blanks to fill. Everything else is the process.
this process
from: ref/pc/run-a-sale-process v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.