Hold a Fund Close
The investors who have committed are ready to be admitted, and the fund holds a close on a set date. This process sends each investor its subscription documents, checks that every subscription is complete and that every investor is eligible to invest, and screens each investor and the people who own and control it against sanctions lists and the anti-money laundering rules. The chief compliance officer clears every hit before an investor can be admitted. The general partner (GP) accepts each subscription, in part when the fund would otherwise pass its hard cap, and the managing partner signs the close. Each new investor's capital account is opened at its commitment. At a later close, the newly admitted limited partners (LPs) are trued up with the earlier ones: they pay their share of what has already been called, with an interest charge, and the earlier investors receive that money back. The chief financial officer (CFO) approves every amount that moves. After the final close, each investor makes its elections under its most favored nation (MFN) clause. The run closes when every investor admitted is on the register with its account open and its side letter in force.
The goals
Hold each close on the set date
Screen 100% of investors before acceptance
Admit 95% of committed investors on time
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
17 activities from a close date is set and committed investors are ready to subscribe to every investor admitted is on the register, its account open and its side letter in force, 3 of them gates a person has to sign.
Hold a Fund Close a close date is set and committed investors are ready to subscribe → every investor admitted is on the register, its account open and its side letter in force
pages or forms are missing the investor is not eligible a hit cannot be cleared an investor is not ready by the close date a signer will not sign the CFO questions the amounts a close date is set and committed investors are ready to subscribe 1 Take in the Close the close date, the investors and their commitments 2 Send the Subscription Documents each investor's pack, its signers and its order 3 Check Each Subscription Is Complete every page, form and signature present 4 Check Each Investor Is Eligible investor status, tax forms and authority to sign 5 Screen Each Investor and Its Owners sanctions, money laundering and who controls it 6 Clear the Screening Hits each hit read and decided by compliance 7 Load the Side Letters to Be Signed each agreed letter held as obligations 8 Check the Total Against the Hard Cap the commitments beside the target and the cap 9 Accept the Subscriptions the GP accepts each, in whole or in part a person signs · never an agent 10 Sign the Close the partnership agreement and side letters signed a person signs · never an agent 11 Open Each Capital Account each new investor entered at its commitment 12 Calculate the Later Investors' True-Up their share of past calls, fees and interest 13 Approve the True-Up the CFO approves what moves, and to whom a person signs · never an agent 14 Confirm the Close to Every Investor the date, the commitment and the signed pages 15 Run the Side Letter Elections after the final close, each investor elects 16 Record the Elections as Obligations each elected term added with its owner 17 File the Close Record signed documents, register and screening on file every investor admitted is on the register, its account open and its side letter in force
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: hold a fund close id: <team> /hold-a-fund-close v1
from: ref/pc/hold-a-fund-close v1
owner: <who> effective: <date>
trigger: <who> sets a close date for the fund, and the investors joining
it have their terms agreed under
ref/pc/negotiate-the-fund-terms-and-side-letters
watch: record=<fund close> system=<your CRM>
change=<a close date is set for the fund>
concurrency: one run per close - the next close of the same fund starts
only after this one is signed, and an investor that misses
this close moves to the next run
goal: every investor joining the close checked, screened, accepted and
on the register by the close date, with its capital account open,
any true-up approved within <days> , and the final close held by
<the final close deadline in the partnership agreement>
phases:
take-in-close - human: the close date, whether it is the first, a
later or the final close, the investors joining and
the commitment each has stated
owner: subscription-reviewer after: trigger
automation: <level>
send-documents - system: each investor's subscription pack sent for
signature, with the signers, the order and the
date it is due back
owner: signature-manager after: take-in-close
by: <days> automation: <level>
check-complete - runs assessment: every page signed, every form
filled, every tax form attached and the commitment
amount matching what the investor stated
owner: subscription-reviewer after: send-documents
automation: <level>
check-eligible - runs assessment: the investor's status under <your
offering rules>, its tax position, any benefit plan
status, and the authority of the person who signed
owner: subscription-reviewer after: check-complete
automation: <level>
screen-investor - runs assessment: the investor, its owners above
<the ownership threshold> and its controllers
screened against sanctions lists and <your
anti-money laundering checks>, with the source of
its money
owner: supplier-check after: check-eligible
by: <days> automation: <level>
clear-hits - convenes decide-and-announce: each hit read, and
cleared as a false match on the record, or the
investor refused
owner: <your compliance role>
after: screen-investor by: <days>
automation: <level>
load-letters - system: each side letter agreed for this close held
as a list of obligations, ready to be in force at
signing
owner: side-letter-keeper after: take-in-close
automation: <level>
check-cap - runs assessment: the commitments cleared for this
close, added to those already admitted, against
the target and <the hard cap> , with the cut each
investor would take if the cap is passed
owner: capital-account-keeper
after: clear-hits + load-letters
automation: <level>
accept - convenes approval: the GP accepts each
subscription in whole or in part, and refuses the
ones that cannot be admitted
owner: <your managing partner role>
after: check-cap by: <the close date>
automation: never
sign-close - convenes approval: the partnership agreement and
each side letter signed by <who> , at the versions
agreed
owner: <your managing partner role>
after: accept by: <the close date>
automation: never
open-accounts - system: each new investor's capital account opened
in the fund accounting system at its commitment,
with its side letter terms attached
owner: capital-account-keeper after: sign-close
automation: <level>
calculate-true-up - runs allocate-and-reconcile: at a later close,
each new investor's share of every call and fee so
far, with interest at <the rate the partnership
agreement sets>, and what each earlier investor
receives back
owner: capital-account-keeper after: open-accounts
automation: <level>
approve-true-up - convenes approval: the CFO approves every amount
that moves, and the calls and distributions that
carry the money are started
owner: <your finance role>
after: calculate-true-up by: <days>
automation: never
confirm-close - system: each investor sent the close date, its
accepted commitment and its signed pages, and its
investor portal access opened
owner: signature-manager
after: open-accounts or approve-true-up
automation: <level>
run-elections - runs collect-and-report: after the final close,
each investor with an MFN right sent the terms it
may elect, and its elections collected by <days>
owner: side-letter-keeper after: confirm-close
automation: <level>
record-elections - system: each elected term added to the investor's
obligations, with its owner and the date it takes
effect
owner: side-letter-keeper after: run-elections
automation: <level>
file-record - runs collect-and-report: the signed documents, the
investor register, the screening results and the
acceptances filed for the close
owner: signature-manager
after: confirm-close or record-elections
automation: <level>
run-scoped:
close-clock - runs roll-call owner: subscription-reviewer
every: <cadence>
from: take-in-close until: sign-close
register - runs collect-and-report owner: capital-account-keeper
from: open-accounts until: run close
handoffs:
take-in-close -> send-documents / load-letters [close-list]: the close
date, its kind, the investors joining and each stated commitment
send-documents -> check-complete [returned-subscriptions]: each
subscription pack as returned, with the date it came back
check-complete -> check-eligible [complete-subscriptions]: each
subscription confirmed complete, with any amount that differs
check-eligible -> screen-investor [eligibility-results]: each investor's
status, tax position and signing authority, each with its evidence
screen-investor -> clear-hits [screening-results]: the screens run,
the sources, the date, and every hit
clear-hits -> check-cap [cleared-investors]: each investor cleared, or
refused with the reason
load-letters -> check-cap [letters-loaded]: each side letter's
obligations, ready to be in force at signing
check-cap -> accept [cap-check]: the total against the target and the
cap, and any cut proposed per investor
accept -> sign-close [accepted-subscriptions]: each subscription
accepted, in whole or in part, or refused
sign-close -> open-accounts [signed-close]: the signed agreement and
side letters, at their versions, with the signers and the date
open-accounts -> calculate-true-up / confirm-close [opened-accounts]:
each capital account and its commitment
calculate-true-up -> approve-true-up [true-up-amounts]: what each new
investor owes, what each earlier investor receives, and the interest
approve-true-up -> confirm-close [approved-true-up]: the approved
amounts, and the call and distribution runs that carry them
confirm-close -> run-elections / file-record [close-confirmations]:
each confirmation sent, with its date
run-elections -> record-elections [elections]: each investor's
elections, and the investors that elected nothing
record-elections -> file-record [elected-obligations]: the elected
terms as obligations with owners and dates
deviations:
check-complete -> send-documents [pages-missing]: pages or forms are
missing, so the investor is sent one list of what is missing, once,
with the date it is needed
check-eligible -> accept [not-eligible]: the investor is not eligible
to invest, so it goes to acceptance to be refused, with the reason
clear-hits -> accept [hit-not-cleared]: a screening hit cannot be
cleared, so the investor goes to acceptance to be refused, and no
money is taken from it
accept -> take-in-close [not-ready]: an investor is not ready by the
close date, so it moves to the next close and this close goes ahead
without it
sign-close -> accept [signer-refuses]: a signer will not sign, so the
acceptances behind the refusal are read again
approve-true-up -> calculate-true-up [amounts-questioned]: the CFO
questions the amounts, so they are worked again with the lines named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, named people for the managing partner, the CFO, the
chief compliance officer and the investor relations lead, and
the outside fund administrator where it holds a role>
systems: the fund accounting system (write), the investor portal
(write), the signature system (trigger), the CRM (read),
<your screening service> (read), <your side letter register>
(write), the document store (write)
data: the partnership agreement <version> , the signed side letters,
the subscription documents <version> , <your offering rules> ,
<your anti-money laundering policy> <version> , the investor
register
policy:
no investor is admitted with a subscription incomplete or a screening
hit open
the fund never passes its hard cap, and a cut is applied by <your
allocation rule> and recorded per investor
every acceptance and every signature is a person's and is never
delegated to an agent
the true-up is worked by the method the partnership agreement sets,
and the CFO approves every amount before any money moves
money moves only through the fund's call and distribution processes,
to verified instructions
a side letter is in force from the signing, and its obligations are
held from that moment
the final close is held by <the deadline the partnership agreement
sets>, or extended only with the consent it requires
measures:
cycle time: <days> from the subscription documents sent to the close
signed
completeness: <target> share of subscriptions complete on first return
volume: <investors admitted per close>
quality gate: every investor admitted has a complete subscription, a
cleared screen, an acceptance and an open capital account
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
326 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: hold a fund close id: <team>/hold-a-fund-close v1
from: ref/pc/hold-a-fund-close v1
owner: <who> effective: <date>
trigger: <who> sets a close date for the fund, and the investors joining
it have their terms agreed under
ref/pc/negotiate-the-fund-terms-and-side-letters
watch: record=<fund close> system=<your CRM>
change=<a close date is set for the fund>
concurrency: one run per close - the next close of the same fund starts
only after this one is signed, and an investor that misses
this close moves to the next run
goal: every investor joining the close checked, screened, accepted and
on the register by the close date, with its capital account open,
any true-up approved within <days>, and the final close held by
<the final close deadline in the partnership agreement>
phases:
take-in-close - human: the close date, whether it is the first, a
later or the final close, the investors joining and
the commitment each has stated
owner: subscription-reviewer after: trigger
automation: <level>
send-documents - system: each investor's subscription pack sent for
signature, with the signers, the order and the
date it is due back
owner: signature-manager after: take-in-close
by: <days> automation: <level>
check-complete - runs assessment: every page signed, every form
filled, every tax form attached and the commitment
amount matching what the investor stated
owner: subscription-reviewer after: send-documents
automation: <level>
check-eligible - runs assessment: the investor's status under <your
offering rules>, its tax position, any benefit plan
status, and the authority of the person who signed
owner: subscription-reviewer after: check-complete
automation: <level>
screen-investor - runs assessment: the investor, its owners above
<the ownership threshold> and its controllers
screened against sanctions lists and <your
anti-money laundering checks>, with the source of
its money
owner: supplier-check after: check-eligible
by: <days> automation: <level>
clear-hits - convenes decide-and-announce: each hit read, and
cleared as a false match on the record, or the
investor refused
owner: <your compliance role>
after: screen-investor by: <days>
automation: <level>
load-letters - system: each side letter agreed for this close held
as a list of obligations, ready to be in force at
signing
owner: side-letter-keeper after: take-in-close
automation: <level>
check-cap - runs assessment: the commitments cleared for this
close, added to those already admitted, against
the target and <the hard cap>, with the cut each
investor would take if the cap is passed
owner: capital-account-keeper
after: clear-hits + load-letters
automation: <level>
accept - convenes approval: the GP accepts each
subscription in whole or in part, and refuses the
ones that cannot be admitted
owner: <your managing partner role>
after: check-cap by: <the close date>
automation: never
sign-close - convenes approval: the partnership agreement and
each side letter signed by <who>, at the versions
agreed
owner: <your managing partner role>
after: accept by: <the close date>
automation: never
open-accounts - system: each new investor's capital account opened
in the fund accounting system at its commitment,
with its side letter terms attached
owner: capital-account-keeper after: sign-close
automation: <level>
calculate-true-up - runs allocate-and-reconcile: at a later close,
each new investor's share of every call and fee so
far, with interest at <the rate the partnership
agreement sets>, and what each earlier investor
receives back
owner: capital-account-keeper after: open-accounts
automation: <level>
approve-true-up - convenes approval: the CFO approves every amount
that moves, and the calls and distributions that
carry the money are started
owner: <your finance role>
after: calculate-true-up by: <days>
automation: never
confirm-close - system: each investor sent the close date, its
accepted commitment and its signed pages, and its
investor portal access opened
owner: signature-manager
after: open-accounts or approve-true-up
automation: <level>
run-elections - runs collect-and-report: after the final close,
each investor with an MFN right sent the terms it
may elect, and its elections collected by <days>
owner: side-letter-keeper after: confirm-close
automation: <level>
record-elections - system: each elected term added to the investor's
obligations, with its owner and the date it takes
effect
owner: side-letter-keeper after: run-elections
automation: <level>
file-record - runs collect-and-report: the signed documents, the
investor register, the screening results and the
acceptances filed for the close
owner: signature-manager
after: confirm-close or record-elections
automation: <level>
run-scoped:
close-clock - runs roll-call owner: subscription-reviewer
every: <cadence>
from: take-in-close until: sign-close
register - runs collect-and-report owner: capital-account-keeper
from: open-accounts until: run close
handoffs:
take-in-close -> send-documents / load-letters [close-list]: the close
date, its kind, the investors joining and each stated commitment
send-documents -> check-complete [returned-subscriptions]: each
subscription pack as returned, with the date it came back
check-complete -> check-eligible [complete-subscriptions]: each
subscription confirmed complete, with any amount that differs
check-eligible -> screen-investor [eligibility-results]: each investor's
status, tax position and signing authority, each with its evidence
screen-investor -> clear-hits [screening-results]: the screens run,
the sources, the date, and every hit
clear-hits -> check-cap [cleared-investors]: each investor cleared, or
refused with the reason
load-letters -> check-cap [letters-loaded]: each side letter's
obligations, ready to be in force at signing
check-cap -> accept [cap-check]: the total against the target and the
cap, and any cut proposed per investor
accept -> sign-close [accepted-subscriptions]: each subscription
accepted, in whole or in part, or refused
sign-close -> open-accounts [signed-close]: the signed agreement and
side letters, at their versions, with the signers and the date
open-accounts -> calculate-true-up / confirm-close [opened-accounts]:
each capital account and its commitment
calculate-true-up -> approve-true-up [true-up-amounts]: what each new
investor owes, what each earlier investor receives, and the interest
approve-true-up -> confirm-close [approved-true-up]: the approved
amounts, and the call and distribution runs that carry them
confirm-close -> run-elections / file-record [close-confirmations]:
each confirmation sent, with its date
run-elections -> record-elections [elections]: each investor's
elections, and the investors that elected nothing
record-elections -> file-record [elected-obligations]: the elected
terms as obligations with owners and dates
deviations:
check-complete -> send-documents [pages-missing]: pages or forms are
missing, so the investor is sent one list of what is missing, once,
with the date it is needed
check-eligible -> accept [not-eligible]: the investor is not eligible
to invest, so it goes to acceptance to be refused, with the reason
clear-hits -> accept [hit-not-cleared]: a screening hit cannot be
cleared, so the investor goes to acceptance to be refused, and no
money is taken from it
accept -> take-in-close [not-ready]: an investor is not ready by the
close date, so it moves to the next close and this close goes ahead
without it
sign-close -> accept [signer-refuses]: a signer will not sign, so the
acceptances behind the refusal are read again
approve-true-up -> calculate-true-up [amounts-questioned]: the CFO
questions the amounts, so they are worked again with the lines named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, named people for the managing partner, the CFO, the
chief compliance officer and the investor relations lead, and
the outside fund administrator where it holds a role>
systems: the fund accounting system (write), the investor portal
(write), the signature system (trigger), the CRM (read),
<your screening service> (read), <your side letter register>
(write), the document store (write)
data: the partnership agreement <version>, the signed side letters,
the subscription documents <version>, <your offering rules>,
<your anti-money laundering policy> <version>, the investor
register
policy:
no investor is admitted with a subscription incomplete or a screening
hit open
the fund never passes its hard cap, and a cut is applied by <your
allocation rule> and recorded per investor
every acceptance and every signature is a person's and is never
delegated to an agent
the true-up is worked by the method the partnership agreement sets,
and the CFO approves every amount before any money moves
money moves only through the fund's call and distribution processes,
to verified instructions
a side letter is in force from the signing, and its obligations are
held from that moment
the final close is held by <the deadline the partnership agreement
sets>, or extended only with the consent it requires
measures:
cycle time: <days> from the subscription documents sent to the close
signed
completeness: <target> share of subscriptions complete on first return
volume: <investors admitted per close>
quality gate: every investor admitted has a complete subscription, a
cleared screen, an acceptance and an open capital account
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
381 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: hold a fund close id: <team>/hold-a-fund-close v1
from: ref/pc/hold-a-fund-close v1
owner: <who> effective: <date>
trigger: <who> sets a close date for the fund, and the investors joining
it have their terms agreed under
ref/pc/negotiate-the-fund-terms-and-side-letters
watch: record=<fund close> system=<your CRM>
change=<a close date is set for the fund>
concurrency: one run per close - the next close of the same fund starts
only after this one is signed, and an investor that misses
this close moves to the next run
goal: every investor joining the close checked, screened, accepted and
on the register by the close date, with its capital account open,
any true-up approved within <days>, and the final close held by
<the final close deadline in the partnership agreement>
phases:
take-in-close - human: the close date, whether it is the first, a
later or the final close, the investors joining and
the commitment each has stated
owner: subscription-reviewer after: trigger
automation: <level>
send-documents - system: each investor's subscription pack sent for
signature, with the signers, the order and the
date it is due back
owner: signature-manager after: take-in-close
by: <days> automation: <level>
check-complete - runs assessment: every page signed, every form
filled, every tax form attached and the commitment
amount matching what the investor stated
owner: subscription-reviewer after: send-documents
automation: <level>
check-eligible - runs assessment: the investor's status under <your
offering rules>, its tax position, any benefit plan
status, and the authority of the person who signed
owner: subscription-reviewer after: check-complete
automation: <level>
screen-investor - runs assessment: the investor, its owners above
<the ownership threshold> and its controllers
screened against sanctions lists and <your
anti-money laundering checks>, with the source of
its money
owner: supplier-check after: check-eligible
by: <days> automation: <level>
clear-hits - convenes decide-and-announce: each hit read, and
cleared as a false match on the record, or the
investor refused
owner: <your compliance role>
after: screen-investor by: <days>
automation: <level>
load-letters - system: each side letter agreed for this close held
as a list of obligations, ready to be in force at
signing
owner: side-letter-keeper after: take-in-close
automation: <level>
check-cap - runs assessment: the commitments cleared for this
close, added to those already admitted, against
the target and <the hard cap>, with the cut each
investor would take if the cap is passed
owner: capital-account-keeper
after: clear-hits + load-letters
automation: <level>
accept - convenes approval: the GP accepts each
subscription in whole or in part, and refuses the
ones that cannot be admitted
owner: <your managing partner role>
after: check-cap by: <the close date>
automation: never
sign-close - convenes approval: the partnership agreement and
each side letter signed by <who>, at the versions
agreed
owner: <your managing partner role>
after: accept by: <the close date>
automation: never
open-accounts - system: each new investor's capital account opened
in the fund accounting system at its commitment,
with its side letter terms attached
owner: capital-account-keeper after: sign-close
automation: <level>
calculate-true-up - runs allocate-and-reconcile: at a later close,
each new investor's share of every call and fee so
far, with interest at <the rate the partnership
agreement sets>, and what each earlier investor
receives back
owner: capital-account-keeper after: open-accounts
automation: <level>
approve-true-up - convenes approval: the CFO approves every amount
that moves, and the calls and distributions that
carry the money are started
owner: <your finance role>
after: calculate-true-up by: <days>
automation: never
confirm-close - system: each investor sent the close date, its
accepted commitment and its signed pages, and its
investor portal access opened
owner: signature-manager
after: open-accounts or approve-true-up
automation: <level>
run-elections - runs collect-and-report: after the final close,
each investor with an MFN right sent the terms it
may elect, and its elections collected by <days>
owner: side-letter-keeper after: confirm-close
automation: <level>
record-elections - system: each elected term added to the investor's
obligations, with its owner and the date it takes
effect
owner: side-letter-keeper after: run-elections
automation: <level>
file-record - runs collect-and-report: the signed documents, the
investor register, the screening results and the
acceptances filed for the close
owner: signature-manager
after: confirm-close or record-elections
automation: <level>
run-scoped:
close-clock - runs roll-call owner: subscription-reviewer
every: <cadence>
from: take-in-close until: sign-close
register - runs collect-and-report owner: capital-account-keeper
from: open-accounts until: run close
handoffs:
take-in-close -> send-documents / load-letters [close-list]: the close
date, its kind, the investors joining and each stated commitment
send-documents -> check-complete [returned-subscriptions]: each
subscription pack as returned, with the date it came back
check-complete -> check-eligible [complete-subscriptions]: each
subscription confirmed complete, with any amount that differs
check-eligible -> screen-investor [eligibility-results]: each investor's
status, tax position and signing authority, each with its evidence
screen-investor -> clear-hits [screening-results]: the screens run,
the sources, the date, and every hit
clear-hits -> check-cap [cleared-investors]: each investor cleared, or
refused with the reason
load-letters -> check-cap [letters-loaded]: each side letter's
obligations, ready to be in force at signing
check-cap -> accept [cap-check]: the total against the target and the
cap, and any cut proposed per investor
accept -> sign-close [accepted-subscriptions]: each subscription
accepted, in whole or in part, or refused
sign-close -> open-accounts [signed-close]: the signed agreement and
side letters, at their versions, with the signers and the date
open-accounts -> calculate-true-up / confirm-close [opened-accounts]:
each capital account and its commitment
calculate-true-up -> approve-true-up [true-up-amounts]: what each new
investor owes, what each earlier investor receives, and the interest
approve-true-up -> confirm-close [approved-true-up]: the approved
amounts, and the call and distribution runs that carry them
confirm-close -> run-elections / file-record [close-confirmations]:
each confirmation sent, with its date
run-elections -> record-elections [elections]: each investor's
elections, and the investors that elected nothing
record-elections -> file-record [elected-obligations]: the elected
terms as obligations with owners and dates
deviations:
check-complete -> send-documents [pages-missing]: pages or forms are
missing, so the investor is sent one list of what is missing, once,
with the date it is needed
check-eligible -> accept [not-eligible]: the investor is not eligible
to invest, so it goes to acceptance to be refused, with the reason
clear-hits -> accept [hit-not-cleared]: a screening hit cannot be
cleared, so the investor goes to acceptance to be refused, and no
money is taken from it
accept -> take-in-close [not-ready]: an investor is not ready by the
close date, so it moves to the next close and this close goes ahead
without it
sign-close -> accept [signer-refuses]: a signer will not sign, so the
acceptances behind the refusal are read again
approve-true-up -> calculate-true-up [amounts-questioned]: the CFO
questions the amounts, so they are worked again with the lines named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, named people for the managing partner, the CFO, the
chief compliance officer and the investor relations lead, and
the outside fund administrator where it holds a role>
systems: the fund accounting system (write), the investor portal
(write), the signature system (trigger), the CRM (read),
<your screening service> (read), <your side letter register>
(write), the document store (write)
data: the partnership agreement <version>, the signed side letters,
the subscription documents <version>, <your offering rules>,
<your anti-money laundering policy> <version>, the investor
register
policy:
no investor is admitted with a subscription incomplete or a screening
hit open
the fund never passes its hard cap, and a cut is applied by <your
allocation rule> and recorded per investor
every acceptance and every signature is a person's and is never
delegated to an agent
the true-up is worked by the method the partnership agreement sets,
and the CFO approves every amount before any money moves
money moves only through the fund's call and distribution processes,
to verified instructions
a side letter is in force from the signing, and its obligations are
held from that moment
the final close is held by <the deadline the partnership agreement
sets>, or extended only with the consent it requires
measures:
cycle time: <days> from the subscription documents sent to the close
signed
completeness: <target> share of subscriptions complete on first return
volume: <investors admitted per close>
quality gate: every investor admitted has a complete subscription, a
cleared screen, an acceptance and an open capital account
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
386 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: hold a fund close id: <team>/hold-a-fund-close v1
from: ref/pc/hold-a-fund-close v1
owner: <who> effective: <date>
trigger: <who> sets a close date for the fund, and the investors joining
it have their terms agreed under
ref/pc/negotiate-the-fund-terms-and-side-letters
watch: record=<fund close> system=<your CRM>
change=<a close date is set for the fund>
concurrency: one run per close - the next close of the same fund starts
only after this one is signed, and an investor that misses
this close moves to the next run
goal: every investor joining the close checked, screened, accepted and
on the register by the close date, with its capital account open,
any true-up approved within <days>, and the final close held by
<the final close deadline in the partnership agreement>
phases:
take-in-close - human: the close date, whether it is the first, a
later or the final close, the investors joining and
the commitment each has stated
owner: subscription-reviewer after: trigger
automation: <level>
send-documents - system: each investor's subscription pack sent for
signature, with the signers, the order and the
date it is due back
owner: signature-manager after: take-in-close
by: <days> automation: <level>
check-complete - runs assessment: every page signed, every form
filled, every tax form attached and the commitment
amount matching what the investor stated
owner: subscription-reviewer after: send-documents
automation: <level>
check-eligible - runs assessment: the investor's status under <your
offering rules>, its tax position, any benefit plan
status, and the authority of the person who signed
owner: subscription-reviewer after: check-complete
automation: <level>
screen-investor - runs assessment: the investor, its owners above
<the ownership threshold> and its controllers
screened against sanctions lists and <your
anti-money laundering checks>, with the source of
its money
owner: supplier-check after: check-eligible
by: <days> automation: <level>
clear-hits - convenes decide-and-announce: each hit read, and
cleared as a false match on the record, or the
investor refused
owner: <your compliance role>
after: screen-investor by: <days>
automation: <level>
load-letters - system: each side letter agreed for this close held
as a list of obligations, ready to be in force at
signing
owner: side-letter-keeper after: take-in-close
automation: <level>
check-cap - runs assessment: the commitments cleared for this
close, added to those already admitted, against
the target and <the hard cap>, with the cut each
investor would take if the cap is passed
owner: capital-account-keeper
after: clear-hits + load-letters
automation: <level>
accept - convenes approval: the GP accepts each
subscription in whole or in part, and refuses the
ones that cannot be admitted
owner: <your managing partner role>
after: check-cap by: <the close date>
automation: never
sign-close - convenes approval: the partnership agreement and
each side letter signed by <who>, at the versions
agreed
owner: <your managing partner role>
after: accept by: <the close date>
automation: never
open-accounts - system: each new investor's capital account opened
in the fund accounting system at its commitment,
with its side letter terms attached
owner: capital-account-keeper after: sign-close
automation: <level>
calculate-true-up - runs allocate-and-reconcile: at a later close,
each new investor's share of every call and fee so
far, with interest at <the rate the partnership
agreement sets>, and what each earlier investor
receives back
owner: capital-account-keeper after: open-accounts
automation: <level>
approve-true-up - convenes approval: the CFO approves every amount
that moves, and the calls and distributions that
carry the money are started
owner: <your finance role>
after: calculate-true-up by: <days>
automation: never
confirm-close - system: each investor sent the close date, its
accepted commitment and its signed pages, and its
investor portal access opened
owner: signature-manager
after: open-accounts or approve-true-up
automation: <level>
run-elections - runs collect-and-report: after the final close,
each investor with an MFN right sent the terms it
may elect, and its elections collected by <days>
owner: side-letter-keeper after: confirm-close
automation: <level>
record-elections - system: each elected term added to the investor's
obligations, with its owner and the date it takes
effect
owner: side-letter-keeper after: run-elections
automation: <level>
file-record - runs collect-and-report: the signed documents, the
investor register, the screening results and the
acceptances filed for the close
owner: signature-manager
after: confirm-close or record-elections
automation: <level>
run-scoped:
close-clock - runs roll-call owner: subscription-reviewer
every: <cadence>
from: take-in-close until: sign-close
register - runs collect-and-report owner: capital-account-keeper
from: open-accounts until: run close
handoffs:
take-in-close -> send-documents / load-letters [close-list]: the close
date, its kind, the investors joining and each stated commitment
send-documents -> check-complete [returned-subscriptions]: each
subscription pack as returned, with the date it came back
check-complete -> check-eligible [complete-subscriptions]: each
subscription confirmed complete, with any amount that differs
check-eligible -> screen-investor [eligibility-results]: each investor's
status, tax position and signing authority, each with its evidence
screen-investor -> clear-hits [screening-results]: the screens run,
the sources, the date, and every hit
clear-hits -> check-cap [cleared-investors]: each investor cleared, or
refused with the reason
load-letters -> check-cap [letters-loaded]: each side letter's
obligations, ready to be in force at signing
check-cap -> accept [cap-check]: the total against the target and the
cap, and any cut proposed per investor
accept -> sign-close [accepted-subscriptions]: each subscription
accepted, in whole or in part, or refused
sign-close -> open-accounts [signed-close]: the signed agreement and
side letters, at their versions, with the signers and the date
open-accounts -> calculate-true-up / confirm-close [opened-accounts]:
each capital account and its commitment
calculate-true-up -> approve-true-up [true-up-amounts]: what each new
investor owes, what each earlier investor receives, and the interest
approve-true-up -> confirm-close [approved-true-up]: the approved
amounts, and the call and distribution runs that carry them
confirm-close -> run-elections / file-record [close-confirmations]:
each confirmation sent, with its date
run-elections -> record-elections [elections]: each investor's
elections, and the investors that elected nothing
record-elections -> file-record [elected-obligations]: the elected
terms as obligations with owners and dates
deviations:
check-complete -> send-documents [pages-missing]: pages or forms are
missing, so the investor is sent one list of what is missing, once,
with the date it is needed
check-eligible -> accept [not-eligible]: the investor is not eligible
to invest, so it goes to acceptance to be refused, with the reason
clear-hits -> accept [hit-not-cleared]: a screening hit cannot be
cleared, so the investor goes to acceptance to be refused, and no
money is taken from it
accept -> take-in-close [not-ready]: an investor is not ready by the
close date, so it moves to the next close and this close goes ahead
without it
sign-close -> accept [signer-refuses]: a signer will not sign, so the
acceptances behind the refusal are read again
approve-true-up -> calculate-true-up [amounts-questioned]: the CFO
questions the amounts, so they are worked again with the lines named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, named people for the managing partner, the CFO, the
chief compliance officer and the investor relations lead, and
the outside fund administrator where it holds a role>
systems: the fund accounting system (write), the investor portal
(write), the signature system (trigger), the CRM (read),
<your screening service> (read), <your side letter register>
(write), the document store (write)
data: the partnership agreement <version>, the signed side letters,
the subscription documents <version>, <your offering rules>,
<your anti-money laundering policy> <version>, the investor
register
policy:
no investor is admitted with a subscription incomplete or a screening
hit open
the fund never passes its hard cap, and a cut is applied by <your
allocation rule> and recorded per investor
every acceptance and every signature is a person's and is never
delegated to an agent
the true-up is worked by the method the partnership agreement sets,
and the CFO approves every amount before any money moves
money moves only through the fund's call and distribution processes,
to verified instructions
a side letter is in force from the signing, and its obligations are
held from that moment
the final close is held by <the deadline the partnership agreement
sets>, or extended only with the consent it requires
measures:
cycle time: <days> from the subscription documents sent to the close
signed
completeness: <target> share of subscriptions complete on first return
volume: <investors admitted per close>
quality gate: every investor admitted has a complete subscription, a
cleared screen, an acceptance and an open capital account
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
377 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: hold a fund close id: <team>/hold-a-fund-close v1
from: ref/pc/hold-a-fund-close v1
owner: <who> effective: <date>
trigger: <who> sets a close date for the fund, and the investors joining
it have their terms agreed under
ref/pc/negotiate-the-fund-terms-and-side-letters
watch: record=<fund close> system=<your CRM>
change=<a close date is set for the fund>
concurrency: one run per close - the next close of the same fund starts
only after this one is signed, and an investor that misses
this close moves to the next run
goal: every investor joining the close checked, screened, accepted and
on the register by the close date, with its capital account open,
any true-up approved within <days>, and the final close held by
<the final close deadline in the partnership agreement>
phases:
take-in-close - human: the close date, whether it is the first, a
later or the final close, the investors joining and
the commitment each has stated
owner: subscription-reviewer after: trigger
automation: <level>
send-documents - system: each investor's subscription pack sent for
signature, with the signers, the order and the
date it is due back
owner: signature-manager after: take-in-close
by: <days> automation: <level>
check-complete - runs assessment: every page signed, every form
filled, every tax form attached and the commitment
amount matching what the investor stated
owner: subscription-reviewer after: send-documents
automation: <level>
check-eligible - runs assessment: the investor's status under <your
offering rules>, its tax position, any benefit plan
status, and the authority of the person who signed
owner: subscription-reviewer after: check-complete
automation: <level>
screen-investor - runs assessment: the investor, its owners above
<the ownership threshold> and its controllers
screened against sanctions lists and <your
anti-money laundering checks>, with the source of
its money
owner: supplier-check after: check-eligible
by: <days> automation: <level>
clear-hits - convenes decide-and-announce: each hit read, and
cleared as a false match on the record, or the
investor refused
owner: <your compliance role>
after: screen-investor by: <days>
automation: <level>
load-letters - system: each side letter agreed for this close held
as a list of obligations, ready to be in force at
signing
owner: side-letter-keeper after: take-in-close
automation: <level>
check-cap - runs assessment: the commitments cleared for this
close, added to those already admitted, against
the target and <the hard cap>, with the cut each
investor would take if the cap is passed
owner: capital-account-keeper
after: clear-hits + load-letters
automation: <level>
accept - convenes approval: the GP accepts each
subscription in whole or in part, and refuses the
ones that cannot be admitted
owner: <your managing partner role>
after: check-cap by: <the close date>
automation: never
sign-close - convenes approval: the partnership agreement and
each side letter signed by <who>, at the versions
agreed
owner: <your managing partner role>
after: accept by: <the close date>
automation: never
open-accounts - system: each new investor's capital account opened
in the fund accounting system at its commitment,
with its side letter terms attached
owner: capital-account-keeper after: sign-close
automation: <level>
calculate-true-up - runs allocate-and-reconcile: at a later close,
each new investor's share of every call and fee so
far, with interest at <the rate the partnership
agreement sets>, and what each earlier investor
receives back
owner: capital-account-keeper after: open-accounts
automation: <level>
approve-true-up - convenes approval: the CFO approves every amount
that moves, and the calls and distributions that
carry the money are started
owner: <your finance role>
after: calculate-true-up by: <days>
automation: never
confirm-close - system: each investor sent the close date, its
accepted commitment and its signed pages, and its
investor portal access opened
owner: signature-manager
after: open-accounts or approve-true-up
automation: <level>
run-elections - runs collect-and-report: after the final close,
each investor with an MFN right sent the terms it
may elect, and its elections collected by <days>
owner: side-letter-keeper after: confirm-close
automation: <level>
record-elections - system: each elected term added to the investor's
obligations, with its owner and the date it takes
effect
owner: side-letter-keeper after: run-elections
automation: <level>
file-record - runs collect-and-report: the signed documents, the
investor register, the screening results and the
acceptances filed for the close
owner: signature-manager
after: confirm-close or record-elections
automation: <level>
run-scoped:
close-clock - runs roll-call owner: subscription-reviewer
every: <cadence>
from: take-in-close until: sign-close
register - runs collect-and-report owner: capital-account-keeper
from: open-accounts until: run close
handoffs:
take-in-close -> send-documents / load-letters [close-list]: the close
date, its kind, the investors joining and each stated commitment
send-documents -> check-complete [returned-subscriptions]: each
subscription pack as returned, with the date it came back
check-complete -> check-eligible [complete-subscriptions]: each
subscription confirmed complete, with any amount that differs
check-eligible -> screen-investor [eligibility-results]: each investor's
status, tax position and signing authority, each with its evidence
screen-investor -> clear-hits [screening-results]: the screens run,
the sources, the date, and every hit
clear-hits -> check-cap [cleared-investors]: each investor cleared, or
refused with the reason
load-letters -> check-cap [letters-loaded]: each side letter's
obligations, ready to be in force at signing
check-cap -> accept [cap-check]: the total against the target and the
cap, and any cut proposed per investor
accept -> sign-close [accepted-subscriptions]: each subscription
accepted, in whole or in part, or refused
sign-close -> open-accounts [signed-close]: the signed agreement and
side letters, at their versions, with the signers and the date
open-accounts -> calculate-true-up / confirm-close [opened-accounts]:
each capital account and its commitment
calculate-true-up -> approve-true-up [true-up-amounts]: what each new
investor owes, what each earlier investor receives, and the interest
approve-true-up -> confirm-close [approved-true-up]: the approved
amounts, and the call and distribution runs that carry them
confirm-close -> run-elections / file-record [close-confirmations]:
each confirmation sent, with its date
run-elections -> record-elections [elections]: each investor's
elections, and the investors that elected nothing
record-elections -> file-record [elected-obligations]: the elected
terms as obligations with owners and dates
deviations:
check-complete -> send-documents [pages-missing]: pages or forms are
missing, so the investor is sent one list of what is missing, once,
with the date it is needed
check-eligible -> accept [not-eligible]: the investor is not eligible
to invest, so it goes to acceptance to be refused, with the reason
clear-hits -> accept [hit-not-cleared]: a screening hit cannot be
cleared, so the investor goes to acceptance to be refused, and no
money is taken from it
accept -> take-in-close [not-ready]: an investor is not ready by the
close date, so it moves to the next close and this close goes ahead
without it
sign-close -> accept [signer-refuses]: a signer will not sign, so the
acceptances behind the refusal are read again
approve-true-up -> calculate-true-up [amounts-questioned]: the CFO
questions the amounts, so they are worked again with the lines named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, named people for the managing partner, the CFO, the
chief compliance officer and the investor relations lead, and
the outside fund administrator where it holds a role>
systems: the fund accounting system (write), the investor portal
(write), the signature system (trigger), the CRM (read),
<your screening service> (read), <your side letter register>
(write), the document store (write)
data: the partnership agreement <version>, the signed side letters,
the subscription documents <version>, <your offering rules>,
<your anti-money laundering policy> <version>, the investor
register
policy:
no investor is admitted with a subscription incomplete or a screening
hit open
the fund never passes its hard cap, and a cut is applied by <your
allocation rule> and recorded per investor
every acceptance and every signature is a person's and is never
delegated to an agent
the true-up is worked by the method the partnership agreement sets,
and the CFO approves every amount before any money moves
money moves only through the fund's call and distribution processes,
to verified instructions
a side letter is in force from the signing, and its obligations are
held from that moment
the final close is held by <the deadline the partnership agreement
sets>, or extended only with the consent it requires
measures:
cycle time: <days> from the subscription documents sent to the close
signed
completeness: <target> share of subscriptions complete on first return
volume: <investors admitted per close>
quality gate: every investor admitted has a complete subscription, a
cleared screen, an acceptance and an open capital account
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
48 blanks to fill. Everything else is the process.
this process
from: ref/pc/hold-a-fund-close v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.