The marks are approved, and the partners now go through every company in the fund together. This process puts each company's condition in one place: its results against plan, its cash, its covenants, its mark and what its board has asked for. The companies are ranked by risk, the deal leads give their account, and the partners decide the watch list, what each company on it needs, and the reserve the fund holds back for each company's later rounds or add-on acquisitions. The fund model shows what those reserves leave for new investments and whether the fund can carry them, and the chief financial officer (CFO) checks them against the capital the fund can still call. The run closes when the watch list is current, every reserve is set with its reason, and every action has one owner and one date.

The goals
  • Review every company within 15 days of the marks
  • Hold reserves under 15% of the fund
  • Flag 90% of later write-downs a quarter ahead

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

17 activities from the quarter's marks are approved to the watch list current, every reserve set, and every action owned and dated.

Run the Portfolio Reviewthe quarter's marks are approved → the watch list current, every reserve set, and every action owned and dated
a company is in breach or out of cashthe fund cannot carry the reservesthe agreed reserves exceed what the fundcan carrythe quarter's marks areapproved1Open the Reviewthe fund, the date, the companiesand the partners2Gather Each Company'sConditionresults, cash, covenants, mark andboard requests3Rank the Companies by Riskeach company placed on the watchlist scale4Read Each Company against ItsPlanvalue creation plan progress,change by change5Propose Each Company'sReservethe money its next rounds oradd-ons may need6Model the Fund with theReserveswhat the reserves leave for newinvestments7Check the Fund Can Carry theReservesreserves against uncalled capitaland the fund's terms8Send the Pack Aheadone pack, with the questions thepartners must settle9Hear the Deal Leadseach deal lead's account of thecompany and the ask10Decide the Watch Listwho goes on, who comes off, and atwhat level11Set the Reserveseach company's reserve agreed,with its reason12Decide What Each WatchedCompany Needshelp, a change of course, or arestructuring13Name an Owner and a Date forEach Actionevery action with one owner andone date14Start the Work a CompanyNeedsa company in trouble goes to itsown process15Record the Decisionswatch list, reserves and actions,with any dissent16Update the Fund Modelthe agreed reserves set into thefund's plan17Hand On the Watch List andReservesto the next marks, the report andthe board workthe watch list current, everyreserve set, and every actionowned and dated
The roster this process needs
decision-coordinator 8 portfolio-monitor 5 fund-modeler 5 deal lead partner 3 partners 3 operating partner 1 CFO 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: run the portfolio review     id: <team>/run-the-portfolio-review   v1
from: ref/pc/run-the-portfolio-review v1
owner: <who>                          effective: <date>
trigger: the quarter's marks are approved, and the review is held
         within <days> of the approval
         watch: record=<quarterly marks>
                system=<your fund accounting system>
                change=<the valuation committee approves the marks>
concurrency: one fund and one quarter is one run. An out-of-cycle
             review, called by <who> after a market shock, runs as its
             own run, and its decisions replace the quarter's for the
             companies it covers
goal: every company in the fund reviewed within <days> of the approved
      marks, with a watch list level, a reserve and a reason for each,
      reserves inside what the fund can carry, and every action owned
      and dated
phases:
  open-review         - system: the fund, the review date, every
                        company it holds, the partners who sit, and the
                        approved marks the review reads from
                        owner: decision-coordinator after: trigger
                        automation: <level>
  gather-condition    - runs collect-and-report: each company's results
                        against plan, cash runway, covenant headroom,
                        approved mark, open board requests and the
                        actions left open by the last review
                        owner: portfolio-monitor    after: open-review
                        automation: <level>
  rank-risk           - runs assessment: each company placed on <your
                        watch list scale> against <your watch list
                        criteria>, with the reason for any change of
                        level since last quarter
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  read-against-plan   - runs assessment: each change in the value
                        creation plan read for progress, with its
                        owner, its measure and the date it is due
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  propose-reserves    - runs assessment: the money each company's next
                        rounds, add-on acquisitions or rescue may need,
                        with the deal lead's ask and the case for it
                        owner: fund-modeler
                        after: rank-risk + read-against-plan
                        automation: <level>
  model-fund          - runs assessment: the fund modeled with the
                        proposed reserves, showing what is left for new
                        investments, the pace of investing, and the
                        fund's expected return at each reserve level
                        owner: fund-modeler     after: propose-reserves
                        automation: <level>
  check-capacity      - runs assessment: the reserves against uncalled
                        capital, the recycling the partnership agreement
                        allows, the limit per company, and whether the
                        investment period has ended
                        owner: fund-modeler         after: model-fund
                        automation: <level>
  send-pack           - runs collect-and-report: one pack with every
                        company's condition, the ranking, the proposed
                        reserves and the questions the review must
                        settle, sent <days> ahead
                        owner: decision-coordinator
                        after: check-capacity       automation: <level>
  hear-deal-leads     - convenes briefing: each deal lead's account of
                        the company, what its board is facing, and what
                        the deal lead asks the partners for
                        owner: <your deal lead role>
                        after: send-pack            automation: <level>
  decide-watch-list   - convenes decide-and-announce: which companies
                        go on the watch list, which come off, and at
                        what level, with the reason for each
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  set-reserves        - convenes decide-and-announce: each company's
                        reserve agreed with its reason, and whether the
                        fund means to take its full share of the next
                        round
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  decide-actions      - convenes decide-and-announce: for each watched
                        company, help from the firm, a change of course
                        through the board, a restructuring, or no
                        further money
                        owner: <your partners>
                        after: decide-watch-list    automation: <level>
  assign-actions      - human: every action written once with one owner
                        and one date, and each action left open by the
                        last review closed, carried or dropped on the
                        record
                        owner: decision-coordinator
                        after: set-reserves + decide-actions
                        by: <days>                  automation: <level>
  start-work          - convenes briefing: a company that needs it
                        handed to the process that does the work, with
                        its condition and the partners' decision
                        attached
                        owner: portfolio-monitor
                        after: assign-actions or rank-risk, whichever
                        comes first for that company
                        by: <days>                  automation: <level>
  record-decisions    - runs collect-and-report: the watch list, the
                        reserves and the actions, with who decided, any
                        dissent and its reason
                        owner: decision-coordinator
                        after: assign-actions + start-work
                        automation: <level>
  update-fund-model   - system: the agreed reserves written into the
                        fund model at a version, replacing last
                        quarter's
                        owner: fund-modeler
                        after: record-decisions     automation: <level>
  hand-on             - convenes briefing: the watch list and the
                        reserves handed to the next quarter's
                        valuation, the quarterly report and each
                        company's board work
                        owner: decision-coordinator
                        after: update-fund-model    automation: <level>
run-scoped:
  clock   - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: open-review     until: record-decisions
  actions - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: assign-actions  until: run close
handoffs:
  open-review -> gather-condition [review-roster]: the fund, the date,
    the companies, the partners, and the approved marks at their version
  gather-condition -> rank-risk / read-against-plan [company-condition]:
    each company's results, cash, covenants, mark, board requests and
    open actions, each with its source
  rank-risk -> propose-reserves [risk-ranking]: each company's level on
    the watch list scale and the reason for any change
  read-against-plan -> propose-reserves [plan-progress]: each change in
    the value creation plan, on track, late or dropped, with its owner
  propose-reserves -> model-fund [proposed-reserves]: the reserve asked
    for each company, and the case for it
  model-fund -> check-capacity [fund-model-run]: the fund with the
    proposed reserves, what is left for new investments, and the
    expected return
  check-capacity -> send-pack [capacity-check]: whether the fund can
    carry the reserves, and the limit or term each one was tested
    against
  send-pack -> hear-deal-leads [review-pack]: the pack the partners
    read, at a version, and the questions it asks them to settle
  hear-deal-leads -> decide-watch-list / set-reserves [deal-lead-accounts]:
    each deal lead's account and ask, recorded as the deal lead gave it
  decide-watch-list -> decide-actions [watch-list]: the watch list, each
    level and its reason
  set-reserves -> assign-actions [agreed-reserves]: each reserve agreed,
    its reason, and the share of the next round it allows for
  decide-actions -> assign-actions [company-actions]: what each watched
    company needs, decided, with who decided it
  assign-actions -> start-work / record-decisions [owned-actions]: every
    action with one owner and one date, and the fate of each action
    left open last quarter
  start-work -> record-decisions [work-started]: the process each
    company was handed to, and its run
  record-decisions -> update-fund-model [review-record]: the decisions,
    who made them, and any dissent with its reason
  update-fund-model -> hand-on [fund-model-version]: the fund model at
    its new version, with the reserves it now carries
deviations:
  rank-risk -> start-work [urgent-trouble]: a company is in breach of a
    covenant or short of cash, so it goes to the work it needs the day
    the ranking finds it and the review hears it afterwards
  check-capacity -> propose-reserves [fund-cannot-carry]: the proposed
    reserves exceed what the fund can call or the terms allow, so the
    reserves are proposed again before the partners see them
  set-reserves -> model-fund [agreed-reserves-exceed-capacity]: the
    reserves the partners agree exceed what the fund can carry, so the
    fund is modeled again and the partners decide on the result
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the partners, each deal lead,
           the operating partner and the CFO>
  systems: the portfolio reporting system (read),
           the fund accounting system (read),
           <your fund model> (write),
           the value creation plan (read),
           the notification channel (write)
  data:    <your watch list scale> <version>, <your watch list
           criteria> <version>, <your reserve policy> <version>, the
           partnership agreement's investment and recycling terms, the
           quarter's approved marks
policy:
  every company in the fund is reviewed every quarter, including the
    ones going well
  a company in breach of a covenant or short of cash goes to the work it
    needs the day the ranking finds it, without waiting for the meeting
  reserves never exceed what the fund can call plus the recycling the
    partnership agreement allows, and the check runs before the partners
    decide
  a reserve sets money aside in the fund's plan, and spending it still
    goes through diligence and the investment committee
  after the investment period ends, reserves are set only for the
    investments the partnership agreement still allows
  a partner who is a director of a company gives an account of it and
    does not set its reserve alone
  every action has one owner and one date, and an action left open last
    quarter is closed, carried or dropped on the record
  dissent is recorded with its reason
measures:
  cycle time: <days> from approved marks to recorded decisions
  coverage: every company in the fund reviewed every quarter
  reserve accuracy: <target> gap between the reserve set and the
                    follow-on money later invested, by company
  follow-through: <target> share of actions done by their date
  volume: <companies per review>
  quality gate: every company has a watch list level, a reserve and a
                reason for each, and every action has one owner and one
                date
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

334 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: run the portfolio review     id: <team>/run-the-portfolio-review   v1
from: ref/pc/run-the-portfolio-review v1
owner: <who>                          effective: <date>
trigger: the quarter's marks are approved, and the review is held
         within <days> of the approval
         watch: record=<quarterly marks>
                system=<your fund accounting system>
                change=<the valuation committee approves the marks>
concurrency: one fund and one quarter is one run. An out-of-cycle
             review, called by <who> after a market shock, runs as its
             own run, and its decisions replace the quarter's for the
             companies it covers
goal: every company in the fund reviewed within <days> of the approved
      marks, with a watch list level, a reserve and a reason for each,
      reserves inside what the fund can carry, and every action owned
      and dated
phases:
  open-review         - system: the fund, the review date, every
                        company it holds, the partners who sit, and the
                        approved marks the review reads from
                        owner: decision-coordinator after: trigger
                        automation: <level>
  gather-condition    - runs collect-and-report: each company's results
                        against plan, cash runway, covenant headroom,
                        approved mark, open board requests and the
                        actions left open by the last review
                        owner: portfolio-monitor    after: open-review
                        automation: <level>
  rank-risk           - runs assessment: each company placed on <your
                        watch list scale> against <your watch list
                        criteria>, with the reason for any change of
                        level since last quarter
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  read-against-plan   - runs assessment: each change in the value
                        creation plan read for progress, with its
                        owner, its measure and the date it is due
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  propose-reserves    - runs assessment: the money each company's next
                        rounds, add-on acquisitions or rescue may need,
                        with the deal lead's ask and the case for it
                        owner: fund-modeler
                        after: rank-risk + read-against-plan
                        automation: <level>
  model-fund          - runs assessment: the fund modeled with the
                        proposed reserves, showing what is left for new
                        investments, the pace of investing, and the
                        fund's expected return at each reserve level
                        owner: fund-modeler     after: propose-reserves
                        automation: <level>
  check-capacity      - runs assessment: the reserves against uncalled
                        capital, the recycling the partnership agreement
                        allows, the limit per company, and whether the
                        investment period has ended
                        owner: fund-modeler         after: model-fund
                        automation: <level>
  send-pack           - runs collect-and-report: one pack with every
                        company's condition, the ranking, the proposed
                        reserves and the questions the review must
                        settle, sent <days> ahead
                        owner: decision-coordinator
                        after: check-capacity       automation: <level>
  hear-deal-leads     - convenes briefing: each deal lead's account of
                        the company, what its board is facing, and what
                        the deal lead asks the partners for
                        owner: <your deal lead role>
                        after: send-pack            automation: <level>
  decide-watch-list   - convenes decide-and-announce: which companies
                        go on the watch list, which come off, and at
                        what level, with the reason for each
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  set-reserves        - convenes decide-and-announce: each company's
                        reserve agreed with its reason, and whether the
                        fund means to take its full share of the next
                        round
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  decide-actions      - convenes decide-and-announce: for each watched
                        company, help from the firm, a change of course
                        through the board, a restructuring, or no
                        further money
                        owner: <your partners>
                        after: decide-watch-list    automation: <level>
  assign-actions      - human: every action written once with one owner
                        and one date, and each action left open by the
                        last review closed, carried or dropped on the
                        record
                        owner: decision-coordinator
                        after: set-reserves + decide-actions
                        by: <days>                  automation: <level>
  start-work          - convenes briefing: a company that needs it
                        handed to the process that does the work, with
                        its condition and the partners' decision
                        attached
                        owner: portfolio-monitor
                        after: assign-actions or rank-risk, whichever
                        comes first for that company
                        by: <days>                  automation: <level>
  record-decisions    - runs collect-and-report: the watch list, the
                        reserves and the actions, with who decided, any
                        dissent and its reason
                        owner: decision-coordinator
                        after: assign-actions + start-work
                        automation: <level>
  update-fund-model   - system: the agreed reserves written into the
                        fund model at a version, replacing last
                        quarter's
                        owner: fund-modeler
                        after: record-decisions     automation: <level>
  hand-on             - convenes briefing: the watch list and the
                        reserves handed to the next quarter's
                        valuation, the quarterly report and each
                        company's board work
                        owner: decision-coordinator
                        after: update-fund-model    automation: <level>
run-scoped:
  clock   - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: open-review     until: record-decisions
  actions - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: assign-actions  until: run close
handoffs:
  open-review -> gather-condition [review-roster]: the fund, the date,
    the companies, the partners, and the approved marks at their version
  gather-condition -> rank-risk / read-against-plan [company-condition]:
    each company's results, cash, covenants, mark, board requests and
    open actions, each with its source
  rank-risk -> propose-reserves [risk-ranking]: each company's level on
    the watch list scale and the reason for any change
  read-against-plan -> propose-reserves [plan-progress]: each change in
    the value creation plan, on track, late or dropped, with its owner
  propose-reserves -> model-fund [proposed-reserves]: the reserve asked
    for each company, and the case for it
  model-fund -> check-capacity [fund-model-run]: the fund with the
    proposed reserves, what is left for new investments, and the
    expected return
  check-capacity -> send-pack [capacity-check]: whether the fund can
    carry the reserves, and the limit or term each one was tested
    against
  send-pack -> hear-deal-leads [review-pack]: the pack the partners
    read, at a version, and the questions it asks them to settle
  hear-deal-leads -> decide-watch-list / set-reserves [deal-lead-accounts]:
    each deal lead's account and ask, recorded as the deal lead gave it
  decide-watch-list -> decide-actions [watch-list]: the watch list, each
    level and its reason
  set-reserves -> assign-actions [agreed-reserves]: each reserve agreed,
    its reason, and the share of the next round it allows for
  decide-actions -> assign-actions [company-actions]: what each watched
    company needs, decided, with who decided it
  assign-actions -> start-work / record-decisions [owned-actions]: every
    action with one owner and one date, and the fate of each action
    left open last quarter
  start-work -> record-decisions [work-started]: the process each
    company was handed to, and its run
  record-decisions -> update-fund-model [review-record]: the decisions,
    who made them, and any dissent with its reason
  update-fund-model -> hand-on [fund-model-version]: the fund model at
    its new version, with the reserves it now carries
deviations:
  rank-risk -> start-work [urgent-trouble]: a company is in breach of a
    covenant or short of cash, so it goes to the work it needs the day
    the ranking finds it and the review hears it afterwards
  check-capacity -> propose-reserves [fund-cannot-carry]: the proposed
    reserves exceed what the fund can call or the terms allow, so the
    reserves are proposed again before the partners see them
  set-reserves -> model-fund [agreed-reserves-exceed-capacity]: the
    reserves the partners agree exceed what the fund can carry, so the
    fund is modeled again and the partners decide on the result
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the partners, each deal lead,
           the operating partner and the CFO>
  systems: the portfolio reporting system (read),
           the fund accounting system (read),
           <your fund model> (write),
           the value creation plan (read),
           the notification channel (write)
  data:    <your watch list scale> <version>, <your watch list
           criteria> <version>, <your reserve policy> <version>, the
           partnership agreement's investment and recycling terms, the
           quarter's approved marks
policy:
  every company in the fund is reviewed every quarter, including the
    ones going well
  a company in breach of a covenant or short of cash goes to the work it
    needs the day the ranking finds it, without waiting for the meeting
  reserves never exceed what the fund can call plus the recycling the
    partnership agreement allows, and the check runs before the partners
    decide
  a reserve sets money aside in the fund's plan, and spending it still
    goes through diligence and the investment committee
  after the investment period ends, reserves are set only for the
    investments the partnership agreement still allows
  a partner who is a director of a company gives an account of it and
    does not set its reserve alone
  every action has one owner and one date, and an action left open last
    quarter is closed, carried or dropped on the record
  dissent is recorded with its reason
measures:
  cycle time: <days> from approved marks to recorded decisions
  coverage: every company in the fund reviewed every quarter
  reserve accuracy: <target> gap between the reserve set and the
                    follow-on money later invested, by company
  follow-through: <target> share of actions done by their date
  volume: <companies per review>
  quality gate: every company has a watch list level, a reserve and a
                reason for each, and every action has one owner and one
                date
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

389 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: run the portfolio review     id: <team>/run-the-portfolio-review   v1
from: ref/pc/run-the-portfolio-review v1
owner: <who>                          effective: <date>
trigger: the quarter's marks are approved, and the review is held
         within <days> of the approval
         watch: record=<quarterly marks>
                system=<your fund accounting system>
                change=<the valuation committee approves the marks>
concurrency: one fund and one quarter is one run. An out-of-cycle
             review, called by <who> after a market shock, runs as its
             own run, and its decisions replace the quarter's for the
             companies it covers
goal: every company in the fund reviewed within <days> of the approved
      marks, with a watch list level, a reserve and a reason for each,
      reserves inside what the fund can carry, and every action owned
      and dated
phases:
  open-review         - system: the fund, the review date, every
                        company it holds, the partners who sit, and the
                        approved marks the review reads from
                        owner: decision-coordinator after: trigger
                        automation: <level>
  gather-condition    - runs collect-and-report: each company's results
                        against plan, cash runway, covenant headroom,
                        approved mark, open board requests and the
                        actions left open by the last review
                        owner: portfolio-monitor    after: open-review
                        automation: <level>
  rank-risk           - runs assessment: each company placed on <your
                        watch list scale> against <your watch list
                        criteria>, with the reason for any change of
                        level since last quarter
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  read-against-plan   - runs assessment: each change in the value
                        creation plan read for progress, with its
                        owner, its measure and the date it is due
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  propose-reserves    - runs assessment: the money each company's next
                        rounds, add-on acquisitions or rescue may need,
                        with the deal lead's ask and the case for it
                        owner: fund-modeler
                        after: rank-risk + read-against-plan
                        automation: <level>
  model-fund          - runs assessment: the fund modeled with the
                        proposed reserves, showing what is left for new
                        investments, the pace of investing, and the
                        fund's expected return at each reserve level
                        owner: fund-modeler     after: propose-reserves
                        automation: <level>
  check-capacity      - runs assessment: the reserves against uncalled
                        capital, the recycling the partnership agreement
                        allows, the limit per company, and whether the
                        investment period has ended
                        owner: fund-modeler         after: model-fund
                        automation: <level>
  send-pack           - runs collect-and-report: one pack with every
                        company's condition, the ranking, the proposed
                        reserves and the questions the review must
                        settle, sent <days> ahead
                        owner: decision-coordinator
                        after: check-capacity       automation: <level>
  hear-deal-leads     - convenes briefing: each deal lead's account of
                        the company, what its board is facing, and what
                        the deal lead asks the partners for
                        owner: <your deal lead role>
                        after: send-pack            automation: <level>
  decide-watch-list   - convenes decide-and-announce: which companies
                        go on the watch list, which come off, and at
                        what level, with the reason for each
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  set-reserves        - convenes decide-and-announce: each company's
                        reserve agreed with its reason, and whether the
                        fund means to take its full share of the next
                        round
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  decide-actions      - convenes decide-and-announce: for each watched
                        company, help from the firm, a change of course
                        through the board, a restructuring, or no
                        further money
                        owner: <your partners>
                        after: decide-watch-list    automation: <level>
  assign-actions      - human: every action written once with one owner
                        and one date, and each action left open by the
                        last review closed, carried or dropped on the
                        record
                        owner: decision-coordinator
                        after: set-reserves + decide-actions
                        by: <days>                  automation: <level>
  start-work          - convenes briefing: a company that needs it
                        handed to the process that does the work, with
                        its condition and the partners' decision
                        attached
                        owner: portfolio-monitor
                        after: assign-actions or rank-risk, whichever
                        comes first for that company
                        by: <days>                  automation: <level>
  record-decisions    - runs collect-and-report: the watch list, the
                        reserves and the actions, with who decided, any
                        dissent and its reason
                        owner: decision-coordinator
                        after: assign-actions + start-work
                        automation: <level>
  update-fund-model   - system: the agreed reserves written into the
                        fund model at a version, replacing last
                        quarter's
                        owner: fund-modeler
                        after: record-decisions     automation: <level>
  hand-on             - convenes briefing: the watch list and the
                        reserves handed to the next quarter's
                        valuation, the quarterly report and each
                        company's board work
                        owner: decision-coordinator
                        after: update-fund-model    automation: <level>
run-scoped:
  clock   - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: open-review     until: record-decisions
  actions - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: assign-actions  until: run close
handoffs:
  open-review -> gather-condition [review-roster]: the fund, the date,
    the companies, the partners, and the approved marks at their version
  gather-condition -> rank-risk / read-against-plan [company-condition]:
    each company's results, cash, covenants, mark, board requests and
    open actions, each with its source
  rank-risk -> propose-reserves [risk-ranking]: each company's level on
    the watch list scale and the reason for any change
  read-against-plan -> propose-reserves [plan-progress]: each change in
    the value creation plan, on track, late or dropped, with its owner
  propose-reserves -> model-fund [proposed-reserves]: the reserve asked
    for each company, and the case for it
  model-fund -> check-capacity [fund-model-run]: the fund with the
    proposed reserves, what is left for new investments, and the
    expected return
  check-capacity -> send-pack [capacity-check]: whether the fund can
    carry the reserves, and the limit or term each one was tested
    against
  send-pack -> hear-deal-leads [review-pack]: the pack the partners
    read, at a version, and the questions it asks them to settle
  hear-deal-leads -> decide-watch-list / set-reserves [deal-lead-accounts]:
    each deal lead's account and ask, recorded as the deal lead gave it
  decide-watch-list -> decide-actions [watch-list]: the watch list, each
    level and its reason
  set-reserves -> assign-actions [agreed-reserves]: each reserve agreed,
    its reason, and the share of the next round it allows for
  decide-actions -> assign-actions [company-actions]: what each watched
    company needs, decided, with who decided it
  assign-actions -> start-work / record-decisions [owned-actions]: every
    action with one owner and one date, and the fate of each action
    left open last quarter
  start-work -> record-decisions [work-started]: the process each
    company was handed to, and its run
  record-decisions -> update-fund-model [review-record]: the decisions,
    who made them, and any dissent with its reason
  update-fund-model -> hand-on [fund-model-version]: the fund model at
    its new version, with the reserves it now carries
deviations:
  rank-risk -> start-work [urgent-trouble]: a company is in breach of a
    covenant or short of cash, so it goes to the work it needs the day
    the ranking finds it and the review hears it afterwards
  check-capacity -> propose-reserves [fund-cannot-carry]: the proposed
    reserves exceed what the fund can call or the terms allow, so the
    reserves are proposed again before the partners see them
  set-reserves -> model-fund [agreed-reserves-exceed-capacity]: the
    reserves the partners agree exceed what the fund can carry, so the
    fund is modeled again and the partners decide on the result
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the partners, each deal lead,
           the operating partner and the CFO>
  systems: the portfolio reporting system (read),
           the fund accounting system (read),
           <your fund model> (write),
           the value creation plan (read),
           the notification channel (write)
  data:    <your watch list scale> <version>, <your watch list
           criteria> <version>, <your reserve policy> <version>, the
           partnership agreement's investment and recycling terms, the
           quarter's approved marks
policy:
  every company in the fund is reviewed every quarter, including the
    ones going well
  a company in breach of a covenant or short of cash goes to the work it
    needs the day the ranking finds it, without waiting for the meeting
  reserves never exceed what the fund can call plus the recycling the
    partnership agreement allows, and the check runs before the partners
    decide
  a reserve sets money aside in the fund's plan, and spending it still
    goes through diligence and the investment committee
  after the investment period ends, reserves are set only for the
    investments the partnership agreement still allows
  a partner who is a director of a company gives an account of it and
    does not set its reserve alone
  every action has one owner and one date, and an action left open last
    quarter is closed, carried or dropped on the record
  dissent is recorded with its reason
measures:
  cycle time: <days> from approved marks to recorded decisions
  coverage: every company in the fund reviewed every quarter
  reserve accuracy: <target> gap between the reserve set and the
                    follow-on money later invested, by company
  follow-through: <target> share of actions done by their date
  volume: <companies per review>
  quality gate: every company has a watch list level, a reserve and a
                reason for each, and every action has one owner and one
                date
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

394 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: run the portfolio review     id: <team>/run-the-portfolio-review   v1
from: ref/pc/run-the-portfolio-review v1
owner: <who>                          effective: <date>
trigger: the quarter's marks are approved, and the review is held
         within <days> of the approval
         watch: record=<quarterly marks>
                system=<your fund accounting system>
                change=<the valuation committee approves the marks>
concurrency: one fund and one quarter is one run. An out-of-cycle
             review, called by <who> after a market shock, runs as its
             own run, and its decisions replace the quarter's for the
             companies it covers
goal: every company in the fund reviewed within <days> of the approved
      marks, with a watch list level, a reserve and a reason for each,
      reserves inside what the fund can carry, and every action owned
      and dated
phases:
  open-review         - system: the fund, the review date, every
                        company it holds, the partners who sit, and the
                        approved marks the review reads from
                        owner: decision-coordinator after: trigger
                        automation: <level>
  gather-condition    - runs collect-and-report: each company's results
                        against plan, cash runway, covenant headroom,
                        approved mark, open board requests and the
                        actions left open by the last review
                        owner: portfolio-monitor    after: open-review
                        automation: <level>
  rank-risk           - runs assessment: each company placed on <your
                        watch list scale> against <your watch list
                        criteria>, with the reason for any change of
                        level since last quarter
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  read-against-plan   - runs assessment: each change in the value
                        creation plan read for progress, with its
                        owner, its measure and the date it is due
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  propose-reserves    - runs assessment: the money each company's next
                        rounds, add-on acquisitions or rescue may need,
                        with the deal lead's ask and the case for it
                        owner: fund-modeler
                        after: rank-risk + read-against-plan
                        automation: <level>
  model-fund          - runs assessment: the fund modeled with the
                        proposed reserves, showing what is left for new
                        investments, the pace of investing, and the
                        fund's expected return at each reserve level
                        owner: fund-modeler     after: propose-reserves
                        automation: <level>
  check-capacity      - runs assessment: the reserves against uncalled
                        capital, the recycling the partnership agreement
                        allows, the limit per company, and whether the
                        investment period has ended
                        owner: fund-modeler         after: model-fund
                        automation: <level>
  send-pack           - runs collect-and-report: one pack with every
                        company's condition, the ranking, the proposed
                        reserves and the questions the review must
                        settle, sent <days> ahead
                        owner: decision-coordinator
                        after: check-capacity       automation: <level>
  hear-deal-leads     - convenes briefing: each deal lead's account of
                        the company, what its board is facing, and what
                        the deal lead asks the partners for
                        owner: <your deal lead role>
                        after: send-pack            automation: <level>
  decide-watch-list   - convenes decide-and-announce: which companies
                        go on the watch list, which come off, and at
                        what level, with the reason for each
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  set-reserves        - convenes decide-and-announce: each company's
                        reserve agreed with its reason, and whether the
                        fund means to take its full share of the next
                        round
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  decide-actions      - convenes decide-and-announce: for each watched
                        company, help from the firm, a change of course
                        through the board, a restructuring, or no
                        further money
                        owner: <your partners>
                        after: decide-watch-list    automation: <level>
  assign-actions      - human: every action written once with one owner
                        and one date, and each action left open by the
                        last review closed, carried or dropped on the
                        record
                        owner: decision-coordinator
                        after: set-reserves + decide-actions
                        by: <days>                  automation: <level>
  start-work          - convenes briefing: a company that needs it
                        handed to the process that does the work, with
                        its condition and the partners' decision
                        attached
                        owner: portfolio-monitor
                        after: assign-actions or rank-risk, whichever
                        comes first for that company
                        by: <days>                  automation: <level>
  record-decisions    - runs collect-and-report: the watch list, the
                        reserves and the actions, with who decided, any
                        dissent and its reason
                        owner: decision-coordinator
                        after: assign-actions + start-work
                        automation: <level>
  update-fund-model   - system: the agreed reserves written into the
                        fund model at a version, replacing last
                        quarter's
                        owner: fund-modeler
                        after: record-decisions     automation: <level>
  hand-on             - convenes briefing: the watch list and the
                        reserves handed to the next quarter's
                        valuation, the quarterly report and each
                        company's board work
                        owner: decision-coordinator
                        after: update-fund-model    automation: <level>
run-scoped:
  clock   - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: open-review     until: record-decisions
  actions - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: assign-actions  until: run close
handoffs:
  open-review -> gather-condition [review-roster]: the fund, the date,
    the companies, the partners, and the approved marks at their version
  gather-condition -> rank-risk / read-against-plan [company-condition]:
    each company's results, cash, covenants, mark, board requests and
    open actions, each with its source
  rank-risk -> propose-reserves [risk-ranking]: each company's level on
    the watch list scale and the reason for any change
  read-against-plan -> propose-reserves [plan-progress]: each change in
    the value creation plan, on track, late or dropped, with its owner
  propose-reserves -> model-fund [proposed-reserves]: the reserve asked
    for each company, and the case for it
  model-fund -> check-capacity [fund-model-run]: the fund with the
    proposed reserves, what is left for new investments, and the
    expected return
  check-capacity -> send-pack [capacity-check]: whether the fund can
    carry the reserves, and the limit or term each one was tested
    against
  send-pack -> hear-deal-leads [review-pack]: the pack the partners
    read, at a version, and the questions it asks them to settle
  hear-deal-leads -> decide-watch-list / set-reserves [deal-lead-accounts]:
    each deal lead's account and ask, recorded as the deal lead gave it
  decide-watch-list -> decide-actions [watch-list]: the watch list, each
    level and its reason
  set-reserves -> assign-actions [agreed-reserves]: each reserve agreed,
    its reason, and the share of the next round it allows for
  decide-actions -> assign-actions [company-actions]: what each watched
    company needs, decided, with who decided it
  assign-actions -> start-work / record-decisions [owned-actions]: every
    action with one owner and one date, and the fate of each action
    left open last quarter
  start-work -> record-decisions [work-started]: the process each
    company was handed to, and its run
  record-decisions -> update-fund-model [review-record]: the decisions,
    who made them, and any dissent with its reason
  update-fund-model -> hand-on [fund-model-version]: the fund model at
    its new version, with the reserves it now carries
deviations:
  rank-risk -> start-work [urgent-trouble]: a company is in breach of a
    covenant or short of cash, so it goes to the work it needs the day
    the ranking finds it and the review hears it afterwards
  check-capacity -> propose-reserves [fund-cannot-carry]: the proposed
    reserves exceed what the fund can call or the terms allow, so the
    reserves are proposed again before the partners see them
  set-reserves -> model-fund [agreed-reserves-exceed-capacity]: the
    reserves the partners agree exceed what the fund can carry, so the
    fund is modeled again and the partners decide on the result
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the partners, each deal lead,
           the operating partner and the CFO>
  systems: the portfolio reporting system (read),
           the fund accounting system (read),
           <your fund model> (write),
           the value creation plan (read),
           the notification channel (write)
  data:    <your watch list scale> <version>, <your watch list
           criteria> <version>, <your reserve policy> <version>, the
           partnership agreement's investment and recycling terms, the
           quarter's approved marks
policy:
  every company in the fund is reviewed every quarter, including the
    ones going well
  a company in breach of a covenant or short of cash goes to the work it
    needs the day the ranking finds it, without waiting for the meeting
  reserves never exceed what the fund can call plus the recycling the
    partnership agreement allows, and the check runs before the partners
    decide
  a reserve sets money aside in the fund's plan, and spending it still
    goes through diligence and the investment committee
  after the investment period ends, reserves are set only for the
    investments the partnership agreement still allows
  a partner who is a director of a company gives an account of it and
    does not set its reserve alone
  every action has one owner and one date, and an action left open last
    quarter is closed, carried or dropped on the record
  dissent is recorded with its reason
measures:
  cycle time: <days> from approved marks to recorded decisions
  coverage: every company in the fund reviewed every quarter
  reserve accuracy: <target> gap between the reserve set and the
                    follow-on money later invested, by company
  follow-through: <target> share of actions done by their date
  volume: <companies per review>
  quality gate: every company has a watch list level, a reserve and a
                reason for each, and every action has one owner and one
                date
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

385 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: run the portfolio review     id: <team>/run-the-portfolio-review   v1
from: ref/pc/run-the-portfolio-review v1
owner: <who>                          effective: <date>
trigger: the quarter's marks are approved, and the review is held
         within <days> of the approval
         watch: record=<quarterly marks>
                system=<your fund accounting system>
                change=<the valuation committee approves the marks>
concurrency: one fund and one quarter is one run. An out-of-cycle
             review, called by <who> after a market shock, runs as its
             own run, and its decisions replace the quarter's for the
             companies it covers
goal: every company in the fund reviewed within <days> of the approved
      marks, with a watch list level, a reserve and a reason for each,
      reserves inside what the fund can carry, and every action owned
      and dated
phases:
  open-review         - system: the fund, the review date, every
                        company it holds, the partners who sit, and the
                        approved marks the review reads from
                        owner: decision-coordinator after: trigger
                        automation: <level>
  gather-condition    - runs collect-and-report: each company's results
                        against plan, cash runway, covenant headroom,
                        approved mark, open board requests and the
                        actions left open by the last review
                        owner: portfolio-monitor    after: open-review
                        automation: <level>
  rank-risk           - runs assessment: each company placed on <your
                        watch list scale> against <your watch list
                        criteria>, with the reason for any change of
                        level since last quarter
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  read-against-plan   - runs assessment: each change in the value
                        creation plan read for progress, with its
                        owner, its measure and the date it is due
                        owner: portfolio-monitor
                        after: gather-condition     automation: <level>
  propose-reserves    - runs assessment: the money each company's next
                        rounds, add-on acquisitions or rescue may need,
                        with the deal lead's ask and the case for it
                        owner: fund-modeler
                        after: rank-risk + read-against-plan
                        automation: <level>
  model-fund          - runs assessment: the fund modeled with the
                        proposed reserves, showing what is left for new
                        investments, the pace of investing, and the
                        fund's expected return at each reserve level
                        owner: fund-modeler     after: propose-reserves
                        automation: <level>
  check-capacity      - runs assessment: the reserves against uncalled
                        capital, the recycling the partnership agreement
                        allows, the limit per company, and whether the
                        investment period has ended
                        owner: fund-modeler         after: model-fund
                        automation: <level>
  send-pack           - runs collect-and-report: one pack with every
                        company's condition, the ranking, the proposed
                        reserves and the questions the review must
                        settle, sent <days> ahead
                        owner: decision-coordinator
                        after: check-capacity       automation: <level>
  hear-deal-leads     - convenes briefing: each deal lead's account of
                        the company, what its board is facing, and what
                        the deal lead asks the partners for
                        owner: <your deal lead role>
                        after: send-pack            automation: <level>
  decide-watch-list   - convenes decide-and-announce: which companies
                        go on the watch list, which come off, and at
                        what level, with the reason for each
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  set-reserves        - convenes decide-and-announce: each company's
                        reserve agreed with its reason, and whether the
                        fund means to take its full share of the next
                        round
                        owner: <your partners>
                        after: hear-deal-leads      automation: <level>
  decide-actions      - convenes decide-and-announce: for each watched
                        company, help from the firm, a change of course
                        through the board, a restructuring, or no
                        further money
                        owner: <your partners>
                        after: decide-watch-list    automation: <level>
  assign-actions      - human: every action written once with one owner
                        and one date, and each action left open by the
                        last review closed, carried or dropped on the
                        record
                        owner: decision-coordinator
                        after: set-reserves + decide-actions
                        by: <days>                  automation: <level>
  start-work          - convenes briefing: a company that needs it
                        handed to the process that does the work, with
                        its condition and the partners' decision
                        attached
                        owner: portfolio-monitor
                        after: assign-actions or rank-risk, whichever
                        comes first for that company
                        by: <days>                  automation: <level>
  record-decisions    - runs collect-and-report: the watch list, the
                        reserves and the actions, with who decided, any
                        dissent and its reason
                        owner: decision-coordinator
                        after: assign-actions + start-work
                        automation: <level>
  update-fund-model   - system: the agreed reserves written into the
                        fund model at a version, replacing last
                        quarter's
                        owner: fund-modeler
                        after: record-decisions     automation: <level>
  hand-on             - convenes briefing: the watch list and the
                        reserves handed to the next quarter's
                        valuation, the quarterly report and each
                        company's board work
                        owner: decision-coordinator
                        after: update-fund-model    automation: <level>
run-scoped:
  clock   - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: open-review     until: record-decisions
  actions - runs roll-call                   owner: decision-coordinator
            every: <cadence>
            from: assign-actions  until: run close
handoffs:
  open-review -> gather-condition [review-roster]: the fund, the date,
    the companies, the partners, and the approved marks at their version
  gather-condition -> rank-risk / read-against-plan [company-condition]:
    each company's results, cash, covenants, mark, board requests and
    open actions, each with its source
  rank-risk -> propose-reserves [risk-ranking]: each company's level on
    the watch list scale and the reason for any change
  read-against-plan -> propose-reserves [plan-progress]: each change in
    the value creation plan, on track, late or dropped, with its owner
  propose-reserves -> model-fund [proposed-reserves]: the reserve asked
    for each company, and the case for it
  model-fund -> check-capacity [fund-model-run]: the fund with the
    proposed reserves, what is left for new investments, and the
    expected return
  check-capacity -> send-pack [capacity-check]: whether the fund can
    carry the reserves, and the limit or term each one was tested
    against
  send-pack -> hear-deal-leads [review-pack]: the pack the partners
    read, at a version, and the questions it asks them to settle
  hear-deal-leads -> decide-watch-list / set-reserves [deal-lead-accounts]:
    each deal lead's account and ask, recorded as the deal lead gave it
  decide-watch-list -> decide-actions [watch-list]: the watch list, each
    level and its reason
  set-reserves -> assign-actions [agreed-reserves]: each reserve agreed,
    its reason, and the share of the next round it allows for
  decide-actions -> assign-actions [company-actions]: what each watched
    company needs, decided, with who decided it
  assign-actions -> start-work / record-decisions [owned-actions]: every
    action with one owner and one date, and the fate of each action
    left open last quarter
  start-work -> record-decisions [work-started]: the process each
    company was handed to, and its run
  record-decisions -> update-fund-model [review-record]: the decisions,
    who made them, and any dissent with its reason
  update-fund-model -> hand-on [fund-model-version]: the fund model at
    its new version, with the reserves it now carries
deviations:
  rank-risk -> start-work [urgent-trouble]: a company is in breach of a
    covenant or short of cash, so it goes to the work it needs the day
    the ranking finds it and the review hears it afterwards
  check-capacity -> propose-reserves [fund-cannot-carry]: the proposed
    reserves exceed what the fund can call or the terms allow, so the
    reserves are proposed again before the partners see them
  set-reserves -> model-fund [agreed-reserves-exceed-capacity]: the
    reserves the partners agree exceed what the fund can carry, so the
    fund is modeled again and the partners decide on the result
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the partners, each deal lead,
           the operating partner and the CFO>
  systems: the portfolio reporting system (read),
           the fund accounting system (read),
           <your fund model> (write),
           the value creation plan (read),
           the notification channel (write)
  data:    <your watch list scale> <version>, <your watch list
           criteria> <version>, <your reserve policy> <version>, the
           partnership agreement's investment and recycling terms, the
           quarter's approved marks
policy:
  every company in the fund is reviewed every quarter, including the
    ones going well
  a company in breach of a covenant or short of cash goes to the work it
    needs the day the ranking finds it, without waiting for the meeting
  reserves never exceed what the fund can call plus the recycling the
    partnership agreement allows, and the check runs before the partners
    decide
  a reserve sets money aside in the fund's plan, and spending it still
    goes through diligence and the investment committee
  after the investment period ends, reserves are set only for the
    investments the partnership agreement still allows
  a partner who is a director of a company gives an account of it and
    does not set its reserve alone
  every action has one owner and one date, and an action left open last
    quarter is closed, carried or dropped on the record
  dissent is recorded with its reason
measures:
  cycle time: <days> from approved marks to recorded decisions
  coverage: every company in the fund reviewed every quarter
  reserve accuracy: <target> gap between the reserve set and the
                    follow-on money later invested, by company
  follow-through: <target> share of actions done by their date
  volume: <companies per review>
  quality gate: every company has a watch list level, a reserve and a
                reason for each, and every action has one owner and one
                date
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

45 blanks to fill. Everything else is the process.

this process from: ref/pc/run-the-portfolio-review v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.