Issue the Quarterly Report and Statements
The quarter has closed and the valuation committee has approved the marks. This process closes the fund's books for the quarter, works out the fund's net asset value and each limited partner's (LP's) share of it, and calculates the fund's performance, its internal rate of return (IRR) and its multiples of paid-in capital, gross and net, under the firm's written method. Someone other than whoever kept the capital accounts works them out again. The quarter's letter says what happened in the portfolio and why the numbers moved, every investor's statement is built from its own capital account, and each statement is read against what that investor's side letter promised about reporting. Compliance reads the report for how performance is shown and what fees are disclosed, and the chief financial officer (CFO) and a partner sign it. The run closes when each investor holds the letter and its own statement on the investor portal by the date it was promised.
The goals
Deliver every investor statement within 45 days
Keep restated figures at zero
Meet 100% of side letter reporting promises
Keep investor questions per report under 10
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
17 activities from the quarter closes, and the valuation committee approves the marks to every investor holds the quarter's letter and its own statement, on time, 2 of them gates a person has to sign.
Issue the Quarterly Report and Statements the quarter closes, and the valuation committee approves the marks → every investor holds the quarter's letter and its own statement, on time
an account does not agree a statement misses a promise compliance asks for a change a signer will not sign an investor finds an error the quarter closes, and the valuation committee approves the marks 1 Open the Quarter's Report what it covers, when it is due, and who it goes to 2 Read the Reporting Promises each side letter's terms on content, format and timing 3 Take in the Approved Marks each holding's fair value as the committee approved it 4 Close the Quarter's Books every call, distribution, fee and expense booked 5 Work Out the Net Asset Value the fund's value, and each investor's share of it 6 Allocate the Quarter's Results gains, losses, income and accrued carry, by the waterfall 7 Check the Capital Accounts Independently the administrator or the controller works them out again 8 Calculate the Fund's Performance the IRR and multiples, gross and net, by the written method 9 Collect the Company Updates each company's quarter, as the portfolio review read it 10 Write the Quarter's Letter what happened, why the numbers moved, what comes next 11 Build Each Investor's Statement committed, paid in, received back, and what it is worth 12 Check Each Statement against Its Side Letter every promised item, format and extra report present 13 Check the Report for Compliance performance shown fairly, and fees and expenses disclosed a person signs · never an agent 14 Sign the Report the CFO and a partner sign before it goes out a person signs · never an agent 15 Publish the Report and Statements each investor sees its own statement, at a version 16 Answer the Investors' Questions each question answered and logged for the next report 17 Record What the Quarter Taught what was late, corrected or asked, and what changes every investor holds the quarter's letter and its own statement, on time
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: quarterly report id: <team> /issue-the-quarterly-report-and-statements v1
from: ref/pc/issue-the-quarterly-report-and-statements v1
owner: <who> effective: <date>
trigger: the quarter ends on <your fiscal calendar> , and the run waits
for the marks <your valuation committee> approves
watch: record=<quarter-end marks> system=<your fund accounting
system> change=<the valuation committee approves the
quarter's marks>
concurrency: one run per fund per quarter - the next quarter's run opens
only when this one has published, and the fourth quarter's
run shares its closed books with the year-end audit
goal: every investor holds the quarter's letter and its own statement
within <days> of the quarter end, and by the earlier date any side
letter promised, with every figure tied to the closed books and
the approved marks
phases:
open-report - human: the period, the due date the agreement
and the side letters set, the investors the
report goes to, and the same request to every
source it draws on
owner: reporting-manager after: trigger
automation: <level>
read-promises - runs collect-and-report: each side letter read
for what the investor was promised: content,
template, currency, timing, and any extra report
such as its own template of fees and expenses
owner: side-letter-keeper after: open-report
automation: <level>
take-in-marks - system: the marks as the valuation committee
approved them, at their version, with the
method and inputs behind each one
owner: reporting-manager after: open-report
automation: <level>
close-books - runs allocate-and-reconcile: every call,
distribution, fee, expense and accrual for the
quarter booked, and the bank and the holdings
agreed to the fund accounting system
owner: capital-account-keeper
after: open-report by: <days>
automation: <level>
work-out-value - runs allocate-and-reconcile: the fund's net
asset value from the approved marks, its cash
and other assets less what it owes, and each
investor's share of it
owner: capital-account-keeper
after: take-in-marks + close-books
automation: <level>
allocate-results - runs allocate-and-reconcile: the quarter's
gains, losses, income, fees and expenses
allocated to each capital account, with the
carry the general partner would earn if the
fund sold everything at the marks, accrued under
<your waterfall>
owner: capital-account-keeper
after: work-out-value automation: <level>
check-accounts - runs assessment: every capital account worked
out again from the same inputs, without sight of
the first answer, by the outside fund
administrator where the firm uses one to check
its work, or by <your controller role>
owner: <your independent check role>
after: allocate-results by: <days>
automation: <level>
calculate-performance - runs assessment: the IRR, the multiple of
total value to paid-in capital and the multiple
of distributions to paid-in capital, gross and
net, for the fund and each holding, from the
cash flows and the approved marks under <your
performance method> <version> , with the effect
of the credit line shown
owner: performance-calculator
after: check-accounts automation: <level>
collect-updates - runs collect-and-report: each company's quarter
as the portfolio review read it, its condition,
its plan and anything the investors must hear,
with any company that has not reported named
owner: reporting-manager after: open-report
by: <days> automation: <level>
write-letter - convenes draft-review-merge: the letter drafted
from the performance, the marks and the company
updates, saying what happened, why the numbers
moved and what comes next, read by <your
managing partner role>
owner: reporting-manager
after: calculate-performance + collect-updates
by: <days> automation: <level>
build-statements - system: each investor's statement from its own
capital account: commitment, contributions,
distributions, fees, expenses, offsets, carry
and closing value, for the quarter, the year and
since it joined
owner: capital-account-keeper
after: check-accounts automation: <level>
check-statements - runs assessment: each statement and its package
against the investor's side letter reporting
terms, including the template, the currency and
every extra report it was promised
owner: side-letter-keeper
after: read-promises + build-statements
automation: <level>
check-compliance - runs assessment: performance shown with net
figures beside gross ones, every fee, expense
and offset disclosed, and nothing in the letter
that the figures do not carry, under <your
regulator's rules>
owner: <your chief compliance officer role>
after: write-letter + check-statements
by: <days> automation: never
sign-report - convenes approval: <your CFO role> and <your
managing partner role> sign the letter, the
fund figures and the statements as named
signers
owner: <your CFO role>
after: check-compliance by: <days>
automation: never
publish-report - system: the letter and the fund figures to
every investor, each statement only to the
investor it belongs to, at a version, and every
named contact told it is there
owner: portal-keeper after: sign-report
by: <the reporting deadline>
automation: <level>
answer-questions - human: every investor question answered, logged
against the report version it asks about, and
an answer given to one investor on a fund matter
offered to all
owner: <your investor relations lead role>
after: publish-report by: <days>
automation: <level>
record-learning - convenes debrief: what was late, which sources
did not answer, what was corrected, what the
investors asked, and what the next quarter's
report changes
owner: reporting-manager
after: answer-questions automation: <level>
run-scoped:
deadline - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: publish-report
ledger - runs allocate-and-reconcile owner: capital-account-keeper
from: close-books until: build-statements
handoffs:
open-report -> read-promises / take-in-marks / close-books /
collect-updates [report-scope]: the period, the due date, the
investors, and what every source is asked for
read-promises -> check-statements [reporting-promises]: each
investor's reporting terms, with the clause for each
take-in-marks -> work-out-value [approved-marks]: the marks at their
version, with the committee's approval and date
close-books -> work-out-value [closed-books]: the quarter's books
closed, with the bank and holdings agreed
work-out-value -> allocate-results [net-asset-value]: the fund's net
asset value and each investor's share of it
allocate-results -> check-accounts [capital-accounts]: every capital
account at the quarter end, and the accrued carry
check-accounts -> calculate-performance / build-statements
[checked-accounts]: the capital accounts as both workings agree
them, with the name of whoever checked them
calculate-performance -> write-letter [fund-performance]: the
performance figures, gross and net, with the method version and the
cash flows they came from
collect-updates -> write-letter [company-updates]: each company's
quarter, and every company that has not reported
write-letter -> check-compliance [letter-draft]: the letter at a
version, with each figure tied to its source
build-statements -> check-statements [investor-statements]: one
statement per investor, at a version
check-statements -> check-compliance [checked-statements]: each
statement matched to its side letter terms, with anything extra it
was promised attached
check-compliance -> sign-report [cleared-report]: the report as
compliance cleared it, with any change it asked for made
sign-report -> publish-report [signed-report]: the signed report and
statements. A change to any figure voids the signatures
publish-report -> answer-questions [published-report]: each document,
its version, who can see it, and the date its contacts were told
answer-questions -> record-learning [question-log]: every question,
its answer, and any correction it caused
deviations:
check-accounts -> allocate-results [account-does-not-agree]: an
account does not agree between the two workings, so the results are
allocated again and the difference traced before anything is built
check-statements -> build-statements [promise-missed]: a statement
misses something its side letter promised, so it is built again with
the missing item
check-compliance -> write-letter [compliance-change]: compliance asks
for a change, so the letter is drafted again on the lines it named
sign-report -> write-letter [signer-refuses]: a signer will not sign,
so the report goes back on the lines the signer named
answer-questions -> build-statements [error-found]: an investor finds
an error, so the statement is built again and published as a new
version
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, or the outside fund administrator where it holds
capital-account-keeper for the firm, and named people for the
CFO, the controller, the managing partner, the chief
compliance officer and the investor relations lead>
systems: the fund accounting system (read), the portfolio reporting
system (read), the investor portal (write), the side letter
register (read), the CRM (write), <your report store>
(write), the notification channel (write)
data: the partnership agreement <version> , every side letter at
its current version, the approved marks at their version,
<your performance method> <version> , <your report template>
<version> , <your regulator's rules>
policy:
the report uses the marks as the valuation committee approved them,
and a mark changes only through that committee
each investor sees only its own statement, and the letter and the
fund figures go to every investor alike
performance is calculated under the written method at its version,
net figures are shown beside gross ones with equal weight, and the
effect of the credit line on the IRR is stated
every fee, expense and offset charged in the quarter is shown, as the
agreement and <your regulator's rules> require
the report goes out by the date the agreement sets and by the earlier
date any side letter promised, and a source that has not answered is
named in the report
nothing is published unsigned
a correction goes out as a new version, the investors who had the old
version are told what changed, and the old version stays where it
was
the capital accounts are worked out again by someone other than
whoever kept them
measures:
cycle time: <days> from the quarter end to the report published
on time: <target> share of investors who receive everything by the
earliest date they were promised
volume: <investors per fund>
quality gate: every figure ties to the closed books or the approved
marks, and every side letter reporting term is met
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
355 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: quarterly report id: <team>/issue-the-quarterly-report-and-statements v1
from: ref/pc/issue-the-quarterly-report-and-statements v1
owner: <who> effective: <date>
trigger: the quarter ends on <your fiscal calendar>, and the run waits
for the marks <your valuation committee> approves
watch: record=<quarter-end marks> system=<your fund accounting
system> change=<the valuation committee approves the
quarter's marks>
concurrency: one run per fund per quarter - the next quarter's run opens
only when this one has published, and the fourth quarter's
run shares its closed books with the year-end audit
goal: every investor holds the quarter's letter and its own statement
within <days> of the quarter end, and by the earlier date any side
letter promised, with every figure tied to the closed books and
the approved marks
phases:
open-report - human: the period, the due date the agreement
and the side letters set, the investors the
report goes to, and the same request to every
source it draws on
owner: reporting-manager after: trigger
automation: <level>
read-promises - runs collect-and-report: each side letter read
for what the investor was promised: content,
template, currency, timing, and any extra report
such as its own template of fees and expenses
owner: side-letter-keeper after: open-report
automation: <level>
take-in-marks - system: the marks as the valuation committee
approved them, at their version, with the
method and inputs behind each one
owner: reporting-manager after: open-report
automation: <level>
close-books - runs allocate-and-reconcile: every call,
distribution, fee, expense and accrual for the
quarter booked, and the bank and the holdings
agreed to the fund accounting system
owner: capital-account-keeper
after: open-report by: <days>
automation: <level>
work-out-value - runs allocate-and-reconcile: the fund's net
asset value from the approved marks, its cash
and other assets less what it owes, and each
investor's share of it
owner: capital-account-keeper
after: take-in-marks + close-books
automation: <level>
allocate-results - runs allocate-and-reconcile: the quarter's
gains, losses, income, fees and expenses
allocated to each capital account, with the
carry the general partner would earn if the
fund sold everything at the marks, accrued under
<your waterfall>
owner: capital-account-keeper
after: work-out-value automation: <level>
check-accounts - runs assessment: every capital account worked
out again from the same inputs, without sight of
the first answer, by the outside fund
administrator where the firm uses one to check
its work, or by <your controller role>
owner: <your independent check role>
after: allocate-results by: <days>
automation: <level>
calculate-performance - runs assessment: the IRR, the multiple of
total value to paid-in capital and the multiple
of distributions to paid-in capital, gross and
net, for the fund and each holding, from the
cash flows and the approved marks under <your
performance method> <version>, with the effect
of the credit line shown
owner: performance-calculator
after: check-accounts automation: <level>
collect-updates - runs collect-and-report: each company's quarter
as the portfolio review read it, its condition,
its plan and anything the investors must hear,
with any company that has not reported named
owner: reporting-manager after: open-report
by: <days> automation: <level>
write-letter - convenes draft-review-merge: the letter drafted
from the performance, the marks and the company
updates, saying what happened, why the numbers
moved and what comes next, read by <your
managing partner role>
owner: reporting-manager
after: calculate-performance + collect-updates
by: <days> automation: <level>
build-statements - system: each investor's statement from its own
capital account: commitment, contributions,
distributions, fees, expenses, offsets, carry
and closing value, for the quarter, the year and
since it joined
owner: capital-account-keeper
after: check-accounts automation: <level>
check-statements - runs assessment: each statement and its package
against the investor's side letter reporting
terms, including the template, the currency and
every extra report it was promised
owner: side-letter-keeper
after: read-promises + build-statements
automation: <level>
check-compliance - runs assessment: performance shown with net
figures beside gross ones, every fee, expense
and offset disclosed, and nothing in the letter
that the figures do not carry, under <your
regulator's rules>
owner: <your chief compliance officer role>
after: write-letter + check-statements
by: <days> automation: never
sign-report - convenes approval: <your CFO role> and <your
managing partner role> sign the letter, the
fund figures and the statements as named
signers
owner: <your CFO role>
after: check-compliance by: <days>
automation: never
publish-report - system: the letter and the fund figures to
every investor, each statement only to the
investor it belongs to, at a version, and every
named contact told it is there
owner: portal-keeper after: sign-report
by: <the reporting deadline>
automation: <level>
answer-questions - human: every investor question answered, logged
against the report version it asks about, and
an answer given to one investor on a fund matter
offered to all
owner: <your investor relations lead role>
after: publish-report by: <days>
automation: <level>
record-learning - convenes debrief: what was late, which sources
did not answer, what was corrected, what the
investors asked, and what the next quarter's
report changes
owner: reporting-manager
after: answer-questions automation: <level>
run-scoped:
deadline - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: publish-report
ledger - runs allocate-and-reconcile owner: capital-account-keeper
from: close-books until: build-statements
handoffs:
open-report -> read-promises / take-in-marks / close-books /
collect-updates [report-scope]: the period, the due date, the
investors, and what every source is asked for
read-promises -> check-statements [reporting-promises]: each
investor's reporting terms, with the clause for each
take-in-marks -> work-out-value [approved-marks]: the marks at their
version, with the committee's approval and date
close-books -> work-out-value [closed-books]: the quarter's books
closed, with the bank and holdings agreed
work-out-value -> allocate-results [net-asset-value]: the fund's net
asset value and each investor's share of it
allocate-results -> check-accounts [capital-accounts]: every capital
account at the quarter end, and the accrued carry
check-accounts -> calculate-performance / build-statements
[checked-accounts]: the capital accounts as both workings agree
them, with the name of whoever checked them
calculate-performance -> write-letter [fund-performance]: the
performance figures, gross and net, with the method version and the
cash flows they came from
collect-updates -> write-letter [company-updates]: each company's
quarter, and every company that has not reported
write-letter -> check-compliance [letter-draft]: the letter at a
version, with each figure tied to its source
build-statements -> check-statements [investor-statements]: one
statement per investor, at a version
check-statements -> check-compliance [checked-statements]: each
statement matched to its side letter terms, with anything extra it
was promised attached
check-compliance -> sign-report [cleared-report]: the report as
compliance cleared it, with any change it asked for made
sign-report -> publish-report [signed-report]: the signed report and
statements. A change to any figure voids the signatures
publish-report -> answer-questions [published-report]: each document,
its version, who can see it, and the date its contacts were told
answer-questions -> record-learning [question-log]: every question,
its answer, and any correction it caused
deviations:
check-accounts -> allocate-results [account-does-not-agree]: an
account does not agree between the two workings, so the results are
allocated again and the difference traced before anything is built
check-statements -> build-statements [promise-missed]: a statement
misses something its side letter promised, so it is built again with
the missing item
check-compliance -> write-letter [compliance-change]: compliance asks
for a change, so the letter is drafted again on the lines it named
sign-report -> write-letter [signer-refuses]: a signer will not sign,
so the report goes back on the lines the signer named
answer-questions -> build-statements [error-found]: an investor finds
an error, so the statement is built again and published as a new
version
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, or the outside fund administrator where it holds
capital-account-keeper for the firm, and named people for the
CFO, the controller, the managing partner, the chief
compliance officer and the investor relations lead>
systems: the fund accounting system (read), the portfolio reporting
system (read), the investor portal (write), the side letter
register (read), the CRM (write), <your report store>
(write), the notification channel (write)
data: the partnership agreement <version>, every side letter at
its current version, the approved marks at their version,
<your performance method> <version>, <your report template>
<version>, <your regulator's rules>
policy:
the report uses the marks as the valuation committee approved them,
and a mark changes only through that committee
each investor sees only its own statement, and the letter and the
fund figures go to every investor alike
performance is calculated under the written method at its version,
net figures are shown beside gross ones with equal weight, and the
effect of the credit line on the IRR is stated
every fee, expense and offset charged in the quarter is shown, as the
agreement and <your regulator's rules> require
the report goes out by the date the agreement sets and by the earlier
date any side letter promised, and a source that has not answered is
named in the report
nothing is published unsigned
a correction goes out as a new version, the investors who had the old
version are told what changed, and the old version stays where it
was
the capital accounts are worked out again by someone other than
whoever kept them
measures:
cycle time: <days> from the quarter end to the report published
on time: <target> share of investors who receive everything by the
earliest date they were promised
volume: <investors per fund>
quality gate: every figure ties to the closed books or the approved
marks, and every side letter reporting term is met
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
410 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: quarterly report id: <team>/issue-the-quarterly-report-and-statements v1
from: ref/pc/issue-the-quarterly-report-and-statements v1
owner: <who> effective: <date>
trigger: the quarter ends on <your fiscal calendar>, and the run waits
for the marks <your valuation committee> approves
watch: record=<quarter-end marks> system=<your fund accounting
system> change=<the valuation committee approves the
quarter's marks>
concurrency: one run per fund per quarter - the next quarter's run opens
only when this one has published, and the fourth quarter's
run shares its closed books with the year-end audit
goal: every investor holds the quarter's letter and its own statement
within <days> of the quarter end, and by the earlier date any side
letter promised, with every figure tied to the closed books and
the approved marks
phases:
open-report - human: the period, the due date the agreement
and the side letters set, the investors the
report goes to, and the same request to every
source it draws on
owner: reporting-manager after: trigger
automation: <level>
read-promises - runs collect-and-report: each side letter read
for what the investor was promised: content,
template, currency, timing, and any extra report
such as its own template of fees and expenses
owner: side-letter-keeper after: open-report
automation: <level>
take-in-marks - system: the marks as the valuation committee
approved them, at their version, with the
method and inputs behind each one
owner: reporting-manager after: open-report
automation: <level>
close-books - runs allocate-and-reconcile: every call,
distribution, fee, expense and accrual for the
quarter booked, and the bank and the holdings
agreed to the fund accounting system
owner: capital-account-keeper
after: open-report by: <days>
automation: <level>
work-out-value - runs allocate-and-reconcile: the fund's net
asset value from the approved marks, its cash
and other assets less what it owes, and each
investor's share of it
owner: capital-account-keeper
after: take-in-marks + close-books
automation: <level>
allocate-results - runs allocate-and-reconcile: the quarter's
gains, losses, income, fees and expenses
allocated to each capital account, with the
carry the general partner would earn if the
fund sold everything at the marks, accrued under
<your waterfall>
owner: capital-account-keeper
after: work-out-value automation: <level>
check-accounts - runs assessment: every capital account worked
out again from the same inputs, without sight of
the first answer, by the outside fund
administrator where the firm uses one to check
its work, or by <your controller role>
owner: <your independent check role>
after: allocate-results by: <days>
automation: <level>
calculate-performance - runs assessment: the IRR, the multiple of
total value to paid-in capital and the multiple
of distributions to paid-in capital, gross and
net, for the fund and each holding, from the
cash flows and the approved marks under <your
performance method> <version>, with the effect
of the credit line shown
owner: performance-calculator
after: check-accounts automation: <level>
collect-updates - runs collect-and-report: each company's quarter
as the portfolio review read it, its condition,
its plan and anything the investors must hear,
with any company that has not reported named
owner: reporting-manager after: open-report
by: <days> automation: <level>
write-letter - convenes draft-review-merge: the letter drafted
from the performance, the marks and the company
updates, saying what happened, why the numbers
moved and what comes next, read by <your
managing partner role>
owner: reporting-manager
after: calculate-performance + collect-updates
by: <days> automation: <level>
build-statements - system: each investor's statement from its own
capital account: commitment, contributions,
distributions, fees, expenses, offsets, carry
and closing value, for the quarter, the year and
since it joined
owner: capital-account-keeper
after: check-accounts automation: <level>
check-statements - runs assessment: each statement and its package
against the investor's side letter reporting
terms, including the template, the currency and
every extra report it was promised
owner: side-letter-keeper
after: read-promises + build-statements
automation: <level>
check-compliance - runs assessment: performance shown with net
figures beside gross ones, every fee, expense
and offset disclosed, and nothing in the letter
that the figures do not carry, under <your
regulator's rules>
owner: <your chief compliance officer role>
after: write-letter + check-statements
by: <days> automation: never
sign-report - convenes approval: <your CFO role> and <your
managing partner role> sign the letter, the
fund figures and the statements as named
signers
owner: <your CFO role>
after: check-compliance by: <days>
automation: never
publish-report - system: the letter and the fund figures to
every investor, each statement only to the
investor it belongs to, at a version, and every
named contact told it is there
owner: portal-keeper after: sign-report
by: <the reporting deadline>
automation: <level>
answer-questions - human: every investor question answered, logged
against the report version it asks about, and
an answer given to one investor on a fund matter
offered to all
owner: <your investor relations lead role>
after: publish-report by: <days>
automation: <level>
record-learning - convenes debrief: what was late, which sources
did not answer, what was corrected, what the
investors asked, and what the next quarter's
report changes
owner: reporting-manager
after: answer-questions automation: <level>
run-scoped:
deadline - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: publish-report
ledger - runs allocate-and-reconcile owner: capital-account-keeper
from: close-books until: build-statements
handoffs:
open-report -> read-promises / take-in-marks / close-books /
collect-updates [report-scope]: the period, the due date, the
investors, and what every source is asked for
read-promises -> check-statements [reporting-promises]: each
investor's reporting terms, with the clause for each
take-in-marks -> work-out-value [approved-marks]: the marks at their
version, with the committee's approval and date
close-books -> work-out-value [closed-books]: the quarter's books
closed, with the bank and holdings agreed
work-out-value -> allocate-results [net-asset-value]: the fund's net
asset value and each investor's share of it
allocate-results -> check-accounts [capital-accounts]: every capital
account at the quarter end, and the accrued carry
check-accounts -> calculate-performance / build-statements
[checked-accounts]: the capital accounts as both workings agree
them, with the name of whoever checked them
calculate-performance -> write-letter [fund-performance]: the
performance figures, gross and net, with the method version and the
cash flows they came from
collect-updates -> write-letter [company-updates]: each company's
quarter, and every company that has not reported
write-letter -> check-compliance [letter-draft]: the letter at a
version, with each figure tied to its source
build-statements -> check-statements [investor-statements]: one
statement per investor, at a version
check-statements -> check-compliance [checked-statements]: each
statement matched to its side letter terms, with anything extra it
was promised attached
check-compliance -> sign-report [cleared-report]: the report as
compliance cleared it, with any change it asked for made
sign-report -> publish-report [signed-report]: the signed report and
statements. A change to any figure voids the signatures
publish-report -> answer-questions [published-report]: each document,
its version, who can see it, and the date its contacts were told
answer-questions -> record-learning [question-log]: every question,
its answer, and any correction it caused
deviations:
check-accounts -> allocate-results [account-does-not-agree]: an
account does not agree between the two workings, so the results are
allocated again and the difference traced before anything is built
check-statements -> build-statements [promise-missed]: a statement
misses something its side letter promised, so it is built again with
the missing item
check-compliance -> write-letter [compliance-change]: compliance asks
for a change, so the letter is drafted again on the lines it named
sign-report -> write-letter [signer-refuses]: a signer will not sign,
so the report goes back on the lines the signer named
answer-questions -> build-statements [error-found]: an investor finds
an error, so the statement is built again and published as a new
version
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, or the outside fund administrator where it holds
capital-account-keeper for the firm, and named people for the
CFO, the controller, the managing partner, the chief
compliance officer and the investor relations lead>
systems: the fund accounting system (read), the portfolio reporting
system (read), the investor portal (write), the side letter
register (read), the CRM (write), <your report store>
(write), the notification channel (write)
data: the partnership agreement <version>, every side letter at
its current version, the approved marks at their version,
<your performance method> <version>, <your report template>
<version>, <your regulator's rules>
policy:
the report uses the marks as the valuation committee approved them,
and a mark changes only through that committee
each investor sees only its own statement, and the letter and the
fund figures go to every investor alike
performance is calculated under the written method at its version,
net figures are shown beside gross ones with equal weight, and the
effect of the credit line on the IRR is stated
every fee, expense and offset charged in the quarter is shown, as the
agreement and <your regulator's rules> require
the report goes out by the date the agreement sets and by the earlier
date any side letter promised, and a source that has not answered is
named in the report
nothing is published unsigned
a correction goes out as a new version, the investors who had the old
version are told what changed, and the old version stays where it
was
the capital accounts are worked out again by someone other than
whoever kept them
measures:
cycle time: <days> from the quarter end to the report published
on time: <target> share of investors who receive everything by the
earliest date they were promised
volume: <investors per fund>
quality gate: every figure ties to the closed books or the approved
marks, and every side letter reporting term is met
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
415 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: quarterly report id: <team>/issue-the-quarterly-report-and-statements v1
from: ref/pc/issue-the-quarterly-report-and-statements v1
owner: <who> effective: <date>
trigger: the quarter ends on <your fiscal calendar>, and the run waits
for the marks <your valuation committee> approves
watch: record=<quarter-end marks> system=<your fund accounting
system> change=<the valuation committee approves the
quarter's marks>
concurrency: one run per fund per quarter - the next quarter's run opens
only when this one has published, and the fourth quarter's
run shares its closed books with the year-end audit
goal: every investor holds the quarter's letter and its own statement
within <days> of the quarter end, and by the earlier date any side
letter promised, with every figure tied to the closed books and
the approved marks
phases:
open-report - human: the period, the due date the agreement
and the side letters set, the investors the
report goes to, and the same request to every
source it draws on
owner: reporting-manager after: trigger
automation: <level>
read-promises - runs collect-and-report: each side letter read
for what the investor was promised: content,
template, currency, timing, and any extra report
such as its own template of fees and expenses
owner: side-letter-keeper after: open-report
automation: <level>
take-in-marks - system: the marks as the valuation committee
approved them, at their version, with the
method and inputs behind each one
owner: reporting-manager after: open-report
automation: <level>
close-books - runs allocate-and-reconcile: every call,
distribution, fee, expense and accrual for the
quarter booked, and the bank and the holdings
agreed to the fund accounting system
owner: capital-account-keeper
after: open-report by: <days>
automation: <level>
work-out-value - runs allocate-and-reconcile: the fund's net
asset value from the approved marks, its cash
and other assets less what it owes, and each
investor's share of it
owner: capital-account-keeper
after: take-in-marks + close-books
automation: <level>
allocate-results - runs allocate-and-reconcile: the quarter's
gains, losses, income, fees and expenses
allocated to each capital account, with the
carry the general partner would earn if the
fund sold everything at the marks, accrued under
<your waterfall>
owner: capital-account-keeper
after: work-out-value automation: <level>
check-accounts - runs assessment: every capital account worked
out again from the same inputs, without sight of
the first answer, by the outside fund
administrator where the firm uses one to check
its work, or by <your controller role>
owner: <your independent check role>
after: allocate-results by: <days>
automation: <level>
calculate-performance - runs assessment: the IRR, the multiple of
total value to paid-in capital and the multiple
of distributions to paid-in capital, gross and
net, for the fund and each holding, from the
cash flows and the approved marks under <your
performance method> <version>, with the effect
of the credit line shown
owner: performance-calculator
after: check-accounts automation: <level>
collect-updates - runs collect-and-report: each company's quarter
as the portfolio review read it, its condition,
its plan and anything the investors must hear,
with any company that has not reported named
owner: reporting-manager after: open-report
by: <days> automation: <level>
write-letter - convenes draft-review-merge: the letter drafted
from the performance, the marks and the company
updates, saying what happened, why the numbers
moved and what comes next, read by <your
managing partner role>
owner: reporting-manager
after: calculate-performance + collect-updates
by: <days> automation: <level>
build-statements - system: each investor's statement from its own
capital account: commitment, contributions,
distributions, fees, expenses, offsets, carry
and closing value, for the quarter, the year and
since it joined
owner: capital-account-keeper
after: check-accounts automation: <level>
check-statements - runs assessment: each statement and its package
against the investor's side letter reporting
terms, including the template, the currency and
every extra report it was promised
owner: side-letter-keeper
after: read-promises + build-statements
automation: <level>
check-compliance - runs assessment: performance shown with net
figures beside gross ones, every fee, expense
and offset disclosed, and nothing in the letter
that the figures do not carry, under <your
regulator's rules>
owner: <your chief compliance officer role>
after: write-letter + check-statements
by: <days> automation: never
sign-report - convenes approval: <your CFO role> and <your
managing partner role> sign the letter, the
fund figures and the statements as named
signers
owner: <your CFO role>
after: check-compliance by: <days>
automation: never
publish-report - system: the letter and the fund figures to
every investor, each statement only to the
investor it belongs to, at a version, and every
named contact told it is there
owner: portal-keeper after: sign-report
by: <the reporting deadline>
automation: <level>
answer-questions - human: every investor question answered, logged
against the report version it asks about, and
an answer given to one investor on a fund matter
offered to all
owner: <your investor relations lead role>
after: publish-report by: <days>
automation: <level>
record-learning - convenes debrief: what was late, which sources
did not answer, what was corrected, what the
investors asked, and what the next quarter's
report changes
owner: reporting-manager
after: answer-questions automation: <level>
run-scoped:
deadline - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: publish-report
ledger - runs allocate-and-reconcile owner: capital-account-keeper
from: close-books until: build-statements
handoffs:
open-report -> read-promises / take-in-marks / close-books /
collect-updates [report-scope]: the period, the due date, the
investors, and what every source is asked for
read-promises -> check-statements [reporting-promises]: each
investor's reporting terms, with the clause for each
take-in-marks -> work-out-value [approved-marks]: the marks at their
version, with the committee's approval and date
close-books -> work-out-value [closed-books]: the quarter's books
closed, with the bank and holdings agreed
work-out-value -> allocate-results [net-asset-value]: the fund's net
asset value and each investor's share of it
allocate-results -> check-accounts [capital-accounts]: every capital
account at the quarter end, and the accrued carry
check-accounts -> calculate-performance / build-statements
[checked-accounts]: the capital accounts as both workings agree
them, with the name of whoever checked them
calculate-performance -> write-letter [fund-performance]: the
performance figures, gross and net, with the method version and the
cash flows they came from
collect-updates -> write-letter [company-updates]: each company's
quarter, and every company that has not reported
write-letter -> check-compliance [letter-draft]: the letter at a
version, with each figure tied to its source
build-statements -> check-statements [investor-statements]: one
statement per investor, at a version
check-statements -> check-compliance [checked-statements]: each
statement matched to its side letter terms, with anything extra it
was promised attached
check-compliance -> sign-report [cleared-report]: the report as
compliance cleared it, with any change it asked for made
sign-report -> publish-report [signed-report]: the signed report and
statements. A change to any figure voids the signatures
publish-report -> answer-questions [published-report]: each document,
its version, who can see it, and the date its contacts were told
answer-questions -> record-learning [question-log]: every question,
its answer, and any correction it caused
deviations:
check-accounts -> allocate-results [account-does-not-agree]: an
account does not agree between the two workings, so the results are
allocated again and the difference traced before anything is built
check-statements -> build-statements [promise-missed]: a statement
misses something its side letter promised, so it is built again with
the missing item
check-compliance -> write-letter [compliance-change]: compliance asks
for a change, so the letter is drafted again on the lines it named
sign-report -> write-letter [signer-refuses]: a signer will not sign,
so the report goes back on the lines the signer named
answer-questions -> build-statements [error-found]: an investor finds
an error, so the statement is built again and published as a new
version
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, or the outside fund administrator where it holds
capital-account-keeper for the firm, and named people for the
CFO, the controller, the managing partner, the chief
compliance officer and the investor relations lead>
systems: the fund accounting system (read), the portfolio reporting
system (read), the investor portal (write), the side letter
register (read), the CRM (write), <your report store>
(write), the notification channel (write)
data: the partnership agreement <version>, every side letter at
its current version, the approved marks at their version,
<your performance method> <version>, <your report template>
<version>, <your regulator's rules>
policy:
the report uses the marks as the valuation committee approved them,
and a mark changes only through that committee
each investor sees only its own statement, and the letter and the
fund figures go to every investor alike
performance is calculated under the written method at its version,
net figures are shown beside gross ones with equal weight, and the
effect of the credit line on the IRR is stated
every fee, expense and offset charged in the quarter is shown, as the
agreement and <your regulator's rules> require
the report goes out by the date the agreement sets and by the earlier
date any side letter promised, and a source that has not answered is
named in the report
nothing is published unsigned
a correction goes out as a new version, the investors who had the old
version are told what changed, and the old version stays where it
was
the capital accounts are worked out again by someone other than
whoever kept them
measures:
cycle time: <days> from the quarter end to the report published
on time: <target> share of investors who receive everything by the
earliest date they were promised
volume: <investors per fund>
quality gate: every figure ties to the closed books or the approved
marks, and every side letter reporting term is met
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
406 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: quarterly report id: <team>/issue-the-quarterly-report-and-statements v1
from: ref/pc/issue-the-quarterly-report-and-statements v1
owner: <who> effective: <date>
trigger: the quarter ends on <your fiscal calendar>, and the run waits
for the marks <your valuation committee> approves
watch: record=<quarter-end marks> system=<your fund accounting
system> change=<the valuation committee approves the
quarter's marks>
concurrency: one run per fund per quarter - the next quarter's run opens
only when this one has published, and the fourth quarter's
run shares its closed books with the year-end audit
goal: every investor holds the quarter's letter and its own statement
within <days> of the quarter end, and by the earlier date any side
letter promised, with every figure tied to the closed books and
the approved marks
phases:
open-report - human: the period, the due date the agreement
and the side letters set, the investors the
report goes to, and the same request to every
source it draws on
owner: reporting-manager after: trigger
automation: <level>
read-promises - runs collect-and-report: each side letter read
for what the investor was promised: content,
template, currency, timing, and any extra report
such as its own template of fees and expenses
owner: side-letter-keeper after: open-report
automation: <level>
take-in-marks - system: the marks as the valuation committee
approved them, at their version, with the
method and inputs behind each one
owner: reporting-manager after: open-report
automation: <level>
close-books - runs allocate-and-reconcile: every call,
distribution, fee, expense and accrual for the
quarter booked, and the bank and the holdings
agreed to the fund accounting system
owner: capital-account-keeper
after: open-report by: <days>
automation: <level>
work-out-value - runs allocate-and-reconcile: the fund's net
asset value from the approved marks, its cash
and other assets less what it owes, and each
investor's share of it
owner: capital-account-keeper
after: take-in-marks + close-books
automation: <level>
allocate-results - runs allocate-and-reconcile: the quarter's
gains, losses, income, fees and expenses
allocated to each capital account, with the
carry the general partner would earn if the
fund sold everything at the marks, accrued under
<your waterfall>
owner: capital-account-keeper
after: work-out-value automation: <level>
check-accounts - runs assessment: every capital account worked
out again from the same inputs, without sight of
the first answer, by the outside fund
administrator where the firm uses one to check
its work, or by <your controller role>
owner: <your independent check role>
after: allocate-results by: <days>
automation: <level>
calculate-performance - runs assessment: the IRR, the multiple of
total value to paid-in capital and the multiple
of distributions to paid-in capital, gross and
net, for the fund and each holding, from the
cash flows and the approved marks under <your
performance method> <version>, with the effect
of the credit line shown
owner: performance-calculator
after: check-accounts automation: <level>
collect-updates - runs collect-and-report: each company's quarter
as the portfolio review read it, its condition,
its plan and anything the investors must hear,
with any company that has not reported named
owner: reporting-manager after: open-report
by: <days> automation: <level>
write-letter - convenes draft-review-merge: the letter drafted
from the performance, the marks and the company
updates, saying what happened, why the numbers
moved and what comes next, read by <your
managing partner role>
owner: reporting-manager
after: calculate-performance + collect-updates
by: <days> automation: <level>
build-statements - system: each investor's statement from its own
capital account: commitment, contributions,
distributions, fees, expenses, offsets, carry
and closing value, for the quarter, the year and
since it joined
owner: capital-account-keeper
after: check-accounts automation: <level>
check-statements - runs assessment: each statement and its package
against the investor's side letter reporting
terms, including the template, the currency and
every extra report it was promised
owner: side-letter-keeper
after: read-promises + build-statements
automation: <level>
check-compliance - runs assessment: performance shown with net
figures beside gross ones, every fee, expense
and offset disclosed, and nothing in the letter
that the figures do not carry, under <your
regulator's rules>
owner: <your chief compliance officer role>
after: write-letter + check-statements
by: <days> automation: never
sign-report - convenes approval: <your CFO role> and <your
managing partner role> sign the letter, the
fund figures and the statements as named
signers
owner: <your CFO role>
after: check-compliance by: <days>
automation: never
publish-report - system: the letter and the fund figures to
every investor, each statement only to the
investor it belongs to, at a version, and every
named contact told it is there
owner: portal-keeper after: sign-report
by: <the reporting deadline>
automation: <level>
answer-questions - human: every investor question answered, logged
against the report version it asks about, and
an answer given to one investor on a fund matter
offered to all
owner: <your investor relations lead role>
after: publish-report by: <days>
automation: <level>
record-learning - convenes debrief: what was late, which sources
did not answer, what was corrected, what the
investors asked, and what the next quarter's
report changes
owner: reporting-manager
after: answer-questions automation: <level>
run-scoped:
deadline - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: publish-report
ledger - runs allocate-and-reconcile owner: capital-account-keeper
from: close-books until: build-statements
handoffs:
open-report -> read-promises / take-in-marks / close-books /
collect-updates [report-scope]: the period, the due date, the
investors, and what every source is asked for
read-promises -> check-statements [reporting-promises]: each
investor's reporting terms, with the clause for each
take-in-marks -> work-out-value [approved-marks]: the marks at their
version, with the committee's approval and date
close-books -> work-out-value [closed-books]: the quarter's books
closed, with the bank and holdings agreed
work-out-value -> allocate-results [net-asset-value]: the fund's net
asset value and each investor's share of it
allocate-results -> check-accounts [capital-accounts]: every capital
account at the quarter end, and the accrued carry
check-accounts -> calculate-performance / build-statements
[checked-accounts]: the capital accounts as both workings agree
them, with the name of whoever checked them
calculate-performance -> write-letter [fund-performance]: the
performance figures, gross and net, with the method version and the
cash flows they came from
collect-updates -> write-letter [company-updates]: each company's
quarter, and every company that has not reported
write-letter -> check-compliance [letter-draft]: the letter at a
version, with each figure tied to its source
build-statements -> check-statements [investor-statements]: one
statement per investor, at a version
check-statements -> check-compliance [checked-statements]: each
statement matched to its side letter terms, with anything extra it
was promised attached
check-compliance -> sign-report [cleared-report]: the report as
compliance cleared it, with any change it asked for made
sign-report -> publish-report [signed-report]: the signed report and
statements. A change to any figure voids the signatures
publish-report -> answer-questions [published-report]: each document,
its version, who can see it, and the date its contacts were told
answer-questions -> record-learning [question-log]: every question,
its answer, and any correction it caused
deviations:
check-accounts -> allocate-results [account-does-not-agree]: an
account does not agree between the two workings, so the results are
allocated again and the difference traced before anything is built
check-statements -> build-statements [promise-missed]: a statement
misses something its side letter promised, so it is built again with
the missing item
check-compliance -> write-letter [compliance-change]: compliance asks
for a change, so the letter is drafted again on the lines it named
sign-report -> write-letter [signer-refuses]: a signer will not sign,
so the report goes back on the lines the signer named
answer-questions -> build-statements [error-found]: an investor finds
an error, so the statement is built again and published as a new
version
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, or the outside fund administrator where it holds
capital-account-keeper for the firm, and named people for the
CFO, the controller, the managing partner, the chief
compliance officer and the investor relations lead>
systems: the fund accounting system (read), the portfolio reporting
system (read), the investor portal (write), the side letter
register (read), the CRM (write), <your report store>
(write), the notification channel (write)
data: the partnership agreement <version>, every side letter at
its current version, the approved marks at their version,
<your performance method> <version>, <your report template>
<version>, <your regulator's rules>
policy:
the report uses the marks as the valuation committee approved them,
and a mark changes only through that committee
each investor sees only its own statement, and the letter and the
fund figures go to every investor alike
performance is calculated under the written method at its version,
net figures are shown beside gross ones with equal weight, and the
effect of the credit line on the IRR is stated
every fee, expense and offset charged in the quarter is shown, as the
agreement and <your regulator's rules> require
the report goes out by the date the agreement sets and by the earlier
date any side letter promised, and a source that has not answered is
named in the report
nothing is published unsigned
a correction goes out as a new version, the investors who had the old
version are told what changed, and the old version stays where it
was
the capital accounts are worked out again by someone other than
whoever kept them
measures:
cycle time: <days> from the quarter end to the report published
on time: <target> share of investors who receive everything by the
earliest date they were promised
volume: <investors per fund>
quality gate: every figure ties to the closed books or the approved
marks, and every side letter reporting term is met
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
50 blanks to fill. Everything else is the process.
this process
from: ref/pc/issue-the-quarterly-report-and-statements v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.