A lease has been signed or changed, such as one for an office, a vehicle or equipment the company uses and does not own, and it has to be accounted for under `<your accounting framework>`. The asset-register-keeper agent takes in the signed lease from the contract repository, reads its term, its payments and its options to extend, to end early or to buy, and asks the lease owner how the business means to use the asset and each option. It sets out each judgment the lease raises, such as whether the contract holds a lease at all, whether an option will be used, the discount rate and any exemption the framework allows, with the effect of each, and the controller decides each one in writing. The asset-register-keeper agent enters the lease in the register with the decided judgments and works out the schedule of the liability, the asset and each period's entries. The ledger-accountant agent prepares the entry that brings the lease onto the books, or changes it, with the schedule as its support, and checks it. A named approver who did not prepare it approves it, and the ledger-accountant agent posts it. The run closes when the lease is in the register with its decisions, the opening entry is posted, and each later period's entries are set to post from the register.

The goals
  • Enter each lease within 10 working days of its signature
  • Hold 100% of signed leases in the register
  • Restate lease balances in zero closed periods
  • Enter a standard lease in under 4 hours of accountant time

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

14 activities from a lease is signed or changed to the lease is in the register, the opening entry is posted, and each period's entries are set, 3 of them gates a person has to sign.

Account for a Leasea lease is signed or changed → the lease is in the register, the opening entry is posted, and each period's entries are set
the controller needs more of the leasereadthe contract holds no leasethe entry does not balance or agree withthe schedulethe approver finds the schedule wronga lease is signed or changed1Take In the Leasethe signed lease or change, withevery document it names2Read the Term and thePaymentsthe start, the end, fixed andvariable payments, increases3Read the Optionsto extend, to end early or to buy,and what each costs4Ask the Lease Ownerhow the business means to use theasset and each optiona person signs · never an agent5Set Out the Judgmentsif it holds a lease, the term, therate and any exemption6Decide Each Judgmentin writing with the reasona person signs · never an agent7Enter the Lease in theRegisterthe term, the payments, the rateand the decisions8Work Out the Schedulethe liability, the asset and eachperiod's entries9Prepare the Opening Entrythe entry that books the lease,with its schedule10Check the Opening Entryits accounts, period and balanceagainst the schedule11Approve the Opening Entrya named approver who did notprepare ita person signs · never an agent12Post the Opening Entryposted in its period with itsapproval attached13Set the Period Entries toPosteach later period's interest,depreciation and payments14Record What the Lease Taughtthe judgments it raised and whatthe next lease needsthe lease is in the register,the opening entry is posted,and each period's entries areset
The roster this process needs
asset-register-keeper 9 ledger-accountant 3 lease owner 1 controller 1 journal approver 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: account for a lease          id: <team>/account-for-a-lease   v1
from: ref/fin/account-for-a-lease v1
owner: <who>                          effective: <date>
trigger: a lease is signed, extended, changed or ended early and filed in
         <your contract repository>
         watch: record=<lease agreement>
                system=<your contract repository>
                change=<a lease is signed or changed>
concurrency: runs may overlap freely - one lease signed or changed is one
             run, a lease has one run open at a time, and a second change
             to the same lease waits for the first to post
goal: the lease entered in the register under <your accounting framework>
      on judgments a named person decided, its opening entry approved and
      posted, and each later period's entries set to post, within <days>
      of the signature or the change
phases:
  take-in-lease        - system: the signed lease or change lands from
                         <your contract repository> with every schedule,
                         amendment and side letter it names
                         owner: asset-register-keeper
                         after: trigger             automation: <level>
  read-term            - runs assessment: the start, the end, the fixed and
                         the variable payments, the increases and any
                         payment made before the start, each with the
                         clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  read-options         - runs assessment: each option to extend, to end
                         early or to buy, with its dates, its notice and
                         what it costs, each with the clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  ask-lease-owner      - human: <your lease owner role> says how the
                         business means to use the asset and whether it
                         expects to use each option, with the reasons
                         owner: <your lease owner role>
                         after: read-term + read-options by: <days>
                         automation: never
  set-out-judgments    - runs assessment: each judgment the lease raises,
                         such as whether the contract holds a lease,
                         whether each option will be used, the discount
                         rate and any exemption <your accounting framework>
                         allows, set out with the effect of each
                         owner: asset-register-keeper
                         after: ask-lease-owner     automation: <level>
  decide-judgments     - convenes decide-and-announce: <your controller
                         role> decides each judgment in writing with the
                         reason
                         owner: <your controller role>
                         after: set-out-judgments   by: <days>
                         automation: never
  enter-lease          - system: the lease entered in <your lease
                         register> with its term, its payments, its rate
                         and the decided judgments, at a version
                         owner: asset-register-keeper
                         after: decide-judgments    automation: <level>
  work-out-schedule    - runs assessment: the liability, the asset and
                         each period's interest, depreciation and payment
                         entries worked out under <your accounting
                         framework>, or the change to them for a change
                         to the lease
                         owner: asset-register-keeper
                         after: enter-lease         automation: <level>
  prepare-opening      - human: the entry that brings the lease onto the
                         books, or changes it, drafted in <your general
                         ledger> with the schedule as its support
                         owner: ledger-accountant
                         after: work-out-schedule   automation: <level>
  check-opening        - runs assessment: the entry's accounts and period
                         read as open, and the entry read as balanced and
                         equal to the schedule
                         owner: ledger-accountant
                         after: prepare-opening     automation: <level>
  approve-opening      - convenes approval: <your journal approver role>,
                         who did not prepare the entry, approves it at its
                         version, with the approvers <your delegation of
                         authority> names above <your threshold>
                         owner: <your journal approver role>
                         after: check-opening       by: <hours>
                         automation: never
  post-opening         - system: the approved entry posted in its period
                         in <your general ledger> with its approval and
                         the schedule attached
                         owner: ledger-accountant
                         after: approve-opening     automation: <level>
  set-period-entries   - system: each later period's interest,
                         depreciation and payment entries set in the
                         register to post at each close until the lease
                         ends or changes
                         owner: asset-register-keeper
                         after: post-opening        automation: <level>
  record-learning      - convenes debrief: which judgments the lease
                         raised, what the lease owner could and could not
                         say, and what the next lease needs
                         owner: asset-register-keeper
                         after: set-period-entries, or decide-judgments
                         when the contract holds no lease
                         automation: <level>
run-scoped:
  status   - runs roll-call                     owner: asset-register-keeper
             every: <cadence>
             from: take-in-lease       until: post-opening
handoffs:
  take-in-lease -> read-term / read-options [signed-lease]: the lease or
    the change, with every document it names
  read-term -> ask-lease-owner [term-and-payments]: the term and every
    payment, each with its clause
  read-options -> ask-lease-owner [options]: each option with its dates,
    its notice and its cost
  ask-lease-owner -> set-out-judgments [owner-intent]: how the business
    means to use the asset and each option, with the reasons
  set-out-judgments -> decide-judgments [lease-judgments]: each judgment
    with its effect
  decide-judgments -> enter-lease / record-learning [decided-judgments]:
    each decision in writing, with who decided and why
  enter-lease -> work-out-schedule [register-entry]: the lease as entered,
    at its version
  work-out-schedule -> prepare-opening [lease-schedule]: the liability,
    the asset and each period's entries
  prepare-opening -> check-opening [draft-opening-entry]: the entry at a
    version, with the schedule attached
  check-opening -> approve-opening [checked-opening-entry]: the entry
    checked against the schedule
  approve-opening -> post-opening [approved-opening-entry]: the entry as
    approved. A change to any line voids the approval
  post-opening -> set-period-entries [posted-opening-entry]: the entry as
    posted, with its ledger reference
  set-period-entries -> record-learning [period-entries]: the entries set
    to post, with the first and the last period
deviations:
  decide-judgments -> read-term [more-reading-needed]: the controller
    needs more of the lease read, such as a schedule of payments or an
    amendment, before deciding
  decide-judgments -> record-learning [no-lease]: the controller decides
    the contract holds no lease, so it is recorded as a service contract
    and nothing enters the register
  check-opening -> prepare-opening [entry-does-not-agree]: the entry does
    not balance or agree with the schedule, so it is prepared again
  approve-opening -> work-out-schedule [schedule-wrong]: the approver
    finds the schedule wrong, so it is worked out again and the entry
    prepared again from it
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for each lease owner, the controller
           and the journal approvers>
  systems: the contract repository (read), the lease register (write),
           the general ledger (write), the notification channel (write)
  data:    <your accounting framework> <version>, <your lease policy>
           <version>, <your source of discount rates> <version>, <your
           delegation of authority> <version>
policy:
  every lease signed or changed is entered in the register, and a lease
    is left out only when <your controller role> decided in writing that
    the contract holds no lease or that an exemption applies
  every judgment is decided in writing by <your controller role>, and no
    agent decides one
  no opening entry posts before a named approver who did not prepare it
    has approved it, with the approvers <your delegation of authority>
    names above <your threshold>
  the lease is accounted for under <your accounting framework> at the
    version in force for the entity, and a change to the framework takes
    effect only once <your controller role> confirms it
  the lease owner is asked about each option before it is judged, and the
    answer is kept with the decision
  a change to a lease starts a new run, and a closed period changes only
    through a correction <your controller role> approves
measures:
  cycle time: <days> from the signature to the opening entry posted
  on time: <target> share of leases entered within <days> of signature
  volume: <leases signed or changed per period>
  quality gate: every lease in the register traces to its signed
                document, a decision by a named person on each judgment,
                and an approved opening entry
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

296 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: account for a lease          id: <team>/account-for-a-lease   v1
from: ref/fin/account-for-a-lease v1
owner: <who>                          effective: <date>
trigger: a lease is signed, extended, changed or ended early and filed in
         <your contract repository>
         watch: record=<lease agreement>
                system=<your contract repository>
                change=<a lease is signed or changed>
concurrency: runs may overlap freely - one lease signed or changed is one
             run, a lease has one run open at a time, and a second change
             to the same lease waits for the first to post
goal: the lease entered in the register under <your accounting framework>
      on judgments a named person decided, its opening entry approved and
      posted, and each later period's entries set to post, within <days>
      of the signature or the change
phases:
  take-in-lease        - system: the signed lease or change lands from
                         <your contract repository> with every schedule,
                         amendment and side letter it names
                         owner: asset-register-keeper
                         after: trigger             automation: <level>
  read-term            - runs assessment: the start, the end, the fixed and
                         the variable payments, the increases and any
                         payment made before the start, each with the
                         clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  read-options         - runs assessment: each option to extend, to end
                         early or to buy, with its dates, its notice and
                         what it costs, each with the clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  ask-lease-owner      - human: <your lease owner role> says how the
                         business means to use the asset and whether it
                         expects to use each option, with the reasons
                         owner: <your lease owner role>
                         after: read-term + read-options by: <days>
                         automation: never
  set-out-judgments    - runs assessment: each judgment the lease raises,
                         such as whether the contract holds a lease,
                         whether each option will be used, the discount
                         rate and any exemption <your accounting framework>
                         allows, set out with the effect of each
                         owner: asset-register-keeper
                         after: ask-lease-owner     automation: <level>
  decide-judgments     - convenes decide-and-announce: <your controller
                         role> decides each judgment in writing with the
                         reason
                         owner: <your controller role>
                         after: set-out-judgments   by: <days>
                         automation: never
  enter-lease          - system: the lease entered in <your lease
                         register> with its term, its payments, its rate
                         and the decided judgments, at a version
                         owner: asset-register-keeper
                         after: decide-judgments    automation: <level>
  work-out-schedule    - runs assessment: the liability, the asset and
                         each period's interest, depreciation and payment
                         entries worked out under <your accounting
                         framework>, or the change to them for a change
                         to the lease
                         owner: asset-register-keeper
                         after: enter-lease         automation: <level>
  prepare-opening      - human: the entry that brings the lease onto the
                         books, or changes it, drafted in <your general
                         ledger> with the schedule as its support
                         owner: ledger-accountant
                         after: work-out-schedule   automation: <level>
  check-opening        - runs assessment: the entry's accounts and period
                         read as open, and the entry read as balanced and
                         equal to the schedule
                         owner: ledger-accountant
                         after: prepare-opening     automation: <level>
  approve-opening      - convenes approval: <your journal approver role>,
                         who did not prepare the entry, approves it at its
                         version, with the approvers <your delegation of
                         authority> names above <your threshold>
                         owner: <your journal approver role>
                         after: check-opening       by: <hours>
                         automation: never
  post-opening         - system: the approved entry posted in its period
                         in <your general ledger> with its approval and
                         the schedule attached
                         owner: ledger-accountant
                         after: approve-opening     automation: <level>
  set-period-entries   - system: each later period's interest,
                         depreciation and payment entries set in the
                         register to post at each close until the lease
                         ends or changes
                         owner: asset-register-keeper
                         after: post-opening        automation: <level>
  record-learning      - convenes debrief: which judgments the lease
                         raised, what the lease owner could and could not
                         say, and what the next lease needs
                         owner: asset-register-keeper
                         after: set-period-entries, or decide-judgments
                         when the contract holds no lease
                         automation: <level>
run-scoped:
  status   - runs roll-call                     owner: asset-register-keeper
             every: <cadence>
             from: take-in-lease       until: post-opening
handoffs:
  take-in-lease -> read-term / read-options [signed-lease]: the lease or
    the change, with every document it names
  read-term -> ask-lease-owner [term-and-payments]: the term and every
    payment, each with its clause
  read-options -> ask-lease-owner [options]: each option with its dates,
    its notice and its cost
  ask-lease-owner -> set-out-judgments [owner-intent]: how the business
    means to use the asset and each option, with the reasons
  set-out-judgments -> decide-judgments [lease-judgments]: each judgment
    with its effect
  decide-judgments -> enter-lease / record-learning [decided-judgments]:
    each decision in writing, with who decided and why
  enter-lease -> work-out-schedule [register-entry]: the lease as entered,
    at its version
  work-out-schedule -> prepare-opening [lease-schedule]: the liability,
    the asset and each period's entries
  prepare-opening -> check-opening [draft-opening-entry]: the entry at a
    version, with the schedule attached
  check-opening -> approve-opening [checked-opening-entry]: the entry
    checked against the schedule
  approve-opening -> post-opening [approved-opening-entry]: the entry as
    approved. A change to any line voids the approval
  post-opening -> set-period-entries [posted-opening-entry]: the entry as
    posted, with its ledger reference
  set-period-entries -> record-learning [period-entries]: the entries set
    to post, with the first and the last period
deviations:
  decide-judgments -> read-term [more-reading-needed]: the controller
    needs more of the lease read, such as a schedule of payments or an
    amendment, before deciding
  decide-judgments -> record-learning [no-lease]: the controller decides
    the contract holds no lease, so it is recorded as a service contract
    and nothing enters the register
  check-opening -> prepare-opening [entry-does-not-agree]: the entry does
    not balance or agree with the schedule, so it is prepared again
  approve-opening -> work-out-schedule [schedule-wrong]: the approver
    finds the schedule wrong, so it is worked out again and the entry
    prepared again from it
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for each lease owner, the controller
           and the journal approvers>
  systems: the contract repository (read), the lease register (write),
           the general ledger (write), the notification channel (write)
  data:    <your accounting framework> <version>, <your lease policy>
           <version>, <your source of discount rates> <version>, <your
           delegation of authority> <version>
policy:
  every lease signed or changed is entered in the register, and a lease
    is left out only when <your controller role> decided in writing that
    the contract holds no lease or that an exemption applies
  every judgment is decided in writing by <your controller role>, and no
    agent decides one
  no opening entry posts before a named approver who did not prepare it
    has approved it, with the approvers <your delegation of authority>
    names above <your threshold>
  the lease is accounted for under <your accounting framework> at the
    version in force for the entity, and a change to the framework takes
    effect only once <your controller role> confirms it
  the lease owner is asked about each option before it is judged, and the
    answer is kept with the decision
  a change to a lease starts a new run, and a closed period changes only
    through a correction <your controller role> approves
measures:
  cycle time: <days> from the signature to the opening entry posted
  on time: <target> share of leases entered within <days> of signature
  volume: <leases signed or changed per period>
  quality gate: every lease in the register traces to its signed
                document, a decision by a named person on each judgment,
                and an approved opening entry
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

351 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: account for a lease          id: <team>/account-for-a-lease   v1
from: ref/fin/account-for-a-lease v1
owner: <who>                          effective: <date>
trigger: a lease is signed, extended, changed or ended early and filed in
         <your contract repository>
         watch: record=<lease agreement>
                system=<your contract repository>
                change=<a lease is signed or changed>
concurrency: runs may overlap freely - one lease signed or changed is one
             run, a lease has one run open at a time, and a second change
             to the same lease waits for the first to post
goal: the lease entered in the register under <your accounting framework>
      on judgments a named person decided, its opening entry approved and
      posted, and each later period's entries set to post, within <days>
      of the signature or the change
phases:
  take-in-lease        - system: the signed lease or change lands from
                         <your contract repository> with every schedule,
                         amendment and side letter it names
                         owner: asset-register-keeper
                         after: trigger             automation: <level>
  read-term            - runs assessment: the start, the end, the fixed and
                         the variable payments, the increases and any
                         payment made before the start, each with the
                         clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  read-options         - runs assessment: each option to extend, to end
                         early or to buy, with its dates, its notice and
                         what it costs, each with the clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  ask-lease-owner      - human: <your lease owner role> says how the
                         business means to use the asset and whether it
                         expects to use each option, with the reasons
                         owner: <your lease owner role>
                         after: read-term + read-options by: <days>
                         automation: never
  set-out-judgments    - runs assessment: each judgment the lease raises,
                         such as whether the contract holds a lease,
                         whether each option will be used, the discount
                         rate and any exemption <your accounting framework>
                         allows, set out with the effect of each
                         owner: asset-register-keeper
                         after: ask-lease-owner     automation: <level>
  decide-judgments     - convenes decide-and-announce: <your controller
                         role> decides each judgment in writing with the
                         reason
                         owner: <your controller role>
                         after: set-out-judgments   by: <days>
                         automation: never
  enter-lease          - system: the lease entered in <your lease
                         register> with its term, its payments, its rate
                         and the decided judgments, at a version
                         owner: asset-register-keeper
                         after: decide-judgments    automation: <level>
  work-out-schedule    - runs assessment: the liability, the asset and
                         each period's interest, depreciation and payment
                         entries worked out under <your accounting
                         framework>, or the change to them for a change
                         to the lease
                         owner: asset-register-keeper
                         after: enter-lease         automation: <level>
  prepare-opening      - human: the entry that brings the lease onto the
                         books, or changes it, drafted in <your general
                         ledger> with the schedule as its support
                         owner: ledger-accountant
                         after: work-out-schedule   automation: <level>
  check-opening        - runs assessment: the entry's accounts and period
                         read as open, and the entry read as balanced and
                         equal to the schedule
                         owner: ledger-accountant
                         after: prepare-opening     automation: <level>
  approve-opening      - convenes approval: <your journal approver role>,
                         who did not prepare the entry, approves it at its
                         version, with the approvers <your delegation of
                         authority> names above <your threshold>
                         owner: <your journal approver role>
                         after: check-opening       by: <hours>
                         automation: never
  post-opening         - system: the approved entry posted in its period
                         in <your general ledger> with its approval and
                         the schedule attached
                         owner: ledger-accountant
                         after: approve-opening     automation: <level>
  set-period-entries   - system: each later period's interest,
                         depreciation and payment entries set in the
                         register to post at each close until the lease
                         ends or changes
                         owner: asset-register-keeper
                         after: post-opening        automation: <level>
  record-learning      - convenes debrief: which judgments the lease
                         raised, what the lease owner could and could not
                         say, and what the next lease needs
                         owner: asset-register-keeper
                         after: set-period-entries, or decide-judgments
                         when the contract holds no lease
                         automation: <level>
run-scoped:
  status   - runs roll-call                     owner: asset-register-keeper
             every: <cadence>
             from: take-in-lease       until: post-opening
handoffs:
  take-in-lease -> read-term / read-options [signed-lease]: the lease or
    the change, with every document it names
  read-term -> ask-lease-owner [term-and-payments]: the term and every
    payment, each with its clause
  read-options -> ask-lease-owner [options]: each option with its dates,
    its notice and its cost
  ask-lease-owner -> set-out-judgments [owner-intent]: how the business
    means to use the asset and each option, with the reasons
  set-out-judgments -> decide-judgments [lease-judgments]: each judgment
    with its effect
  decide-judgments -> enter-lease / record-learning [decided-judgments]:
    each decision in writing, with who decided and why
  enter-lease -> work-out-schedule [register-entry]: the lease as entered,
    at its version
  work-out-schedule -> prepare-opening [lease-schedule]: the liability,
    the asset and each period's entries
  prepare-opening -> check-opening [draft-opening-entry]: the entry at a
    version, with the schedule attached
  check-opening -> approve-opening [checked-opening-entry]: the entry
    checked against the schedule
  approve-opening -> post-opening [approved-opening-entry]: the entry as
    approved. A change to any line voids the approval
  post-opening -> set-period-entries [posted-opening-entry]: the entry as
    posted, with its ledger reference
  set-period-entries -> record-learning [period-entries]: the entries set
    to post, with the first and the last period
deviations:
  decide-judgments -> read-term [more-reading-needed]: the controller
    needs more of the lease read, such as a schedule of payments or an
    amendment, before deciding
  decide-judgments -> record-learning [no-lease]: the controller decides
    the contract holds no lease, so it is recorded as a service contract
    and nothing enters the register
  check-opening -> prepare-opening [entry-does-not-agree]: the entry does
    not balance or agree with the schedule, so it is prepared again
  approve-opening -> work-out-schedule [schedule-wrong]: the approver
    finds the schedule wrong, so it is worked out again and the entry
    prepared again from it
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for each lease owner, the controller
           and the journal approvers>
  systems: the contract repository (read), the lease register (write),
           the general ledger (write), the notification channel (write)
  data:    <your accounting framework> <version>, <your lease policy>
           <version>, <your source of discount rates> <version>, <your
           delegation of authority> <version>
policy:
  every lease signed or changed is entered in the register, and a lease
    is left out only when <your controller role> decided in writing that
    the contract holds no lease or that an exemption applies
  every judgment is decided in writing by <your controller role>, and no
    agent decides one
  no opening entry posts before a named approver who did not prepare it
    has approved it, with the approvers <your delegation of authority>
    names above <your threshold>
  the lease is accounted for under <your accounting framework> at the
    version in force for the entity, and a change to the framework takes
    effect only once <your controller role> confirms it
  the lease owner is asked about each option before it is judged, and the
    answer is kept with the decision
  a change to a lease starts a new run, and a closed period changes only
    through a correction <your controller role> approves
measures:
  cycle time: <days> from the signature to the opening entry posted
  on time: <target> share of leases entered within <days> of signature
  volume: <leases signed or changed per period>
  quality gate: every lease in the register traces to its signed
                document, a decision by a named person on each judgment,
                and an approved opening entry
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

356 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: account for a lease          id: <team>/account-for-a-lease   v1
from: ref/fin/account-for-a-lease v1
owner: <who>                          effective: <date>
trigger: a lease is signed, extended, changed or ended early and filed in
         <your contract repository>
         watch: record=<lease agreement>
                system=<your contract repository>
                change=<a lease is signed or changed>
concurrency: runs may overlap freely - one lease signed or changed is one
             run, a lease has one run open at a time, and a second change
             to the same lease waits for the first to post
goal: the lease entered in the register under <your accounting framework>
      on judgments a named person decided, its opening entry approved and
      posted, and each later period's entries set to post, within <days>
      of the signature or the change
phases:
  take-in-lease        - system: the signed lease or change lands from
                         <your contract repository> with every schedule,
                         amendment and side letter it names
                         owner: asset-register-keeper
                         after: trigger             automation: <level>
  read-term            - runs assessment: the start, the end, the fixed and
                         the variable payments, the increases and any
                         payment made before the start, each with the
                         clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  read-options         - runs assessment: each option to extend, to end
                         early or to buy, with its dates, its notice and
                         what it costs, each with the clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  ask-lease-owner      - human: <your lease owner role> says how the
                         business means to use the asset and whether it
                         expects to use each option, with the reasons
                         owner: <your lease owner role>
                         after: read-term + read-options by: <days>
                         automation: never
  set-out-judgments    - runs assessment: each judgment the lease raises,
                         such as whether the contract holds a lease,
                         whether each option will be used, the discount
                         rate and any exemption <your accounting framework>
                         allows, set out with the effect of each
                         owner: asset-register-keeper
                         after: ask-lease-owner     automation: <level>
  decide-judgments     - convenes decide-and-announce: <your controller
                         role> decides each judgment in writing with the
                         reason
                         owner: <your controller role>
                         after: set-out-judgments   by: <days>
                         automation: never
  enter-lease          - system: the lease entered in <your lease
                         register> with its term, its payments, its rate
                         and the decided judgments, at a version
                         owner: asset-register-keeper
                         after: decide-judgments    automation: <level>
  work-out-schedule    - runs assessment: the liability, the asset and
                         each period's interest, depreciation and payment
                         entries worked out under <your accounting
                         framework>, or the change to them for a change
                         to the lease
                         owner: asset-register-keeper
                         after: enter-lease         automation: <level>
  prepare-opening      - human: the entry that brings the lease onto the
                         books, or changes it, drafted in <your general
                         ledger> with the schedule as its support
                         owner: ledger-accountant
                         after: work-out-schedule   automation: <level>
  check-opening        - runs assessment: the entry's accounts and period
                         read as open, and the entry read as balanced and
                         equal to the schedule
                         owner: ledger-accountant
                         after: prepare-opening     automation: <level>
  approve-opening      - convenes approval: <your journal approver role>,
                         who did not prepare the entry, approves it at its
                         version, with the approvers <your delegation of
                         authority> names above <your threshold>
                         owner: <your journal approver role>
                         after: check-opening       by: <hours>
                         automation: never
  post-opening         - system: the approved entry posted in its period
                         in <your general ledger> with its approval and
                         the schedule attached
                         owner: ledger-accountant
                         after: approve-opening     automation: <level>
  set-period-entries   - system: each later period's interest,
                         depreciation and payment entries set in the
                         register to post at each close until the lease
                         ends or changes
                         owner: asset-register-keeper
                         after: post-opening        automation: <level>
  record-learning      - convenes debrief: which judgments the lease
                         raised, what the lease owner could and could not
                         say, and what the next lease needs
                         owner: asset-register-keeper
                         after: set-period-entries, or decide-judgments
                         when the contract holds no lease
                         automation: <level>
run-scoped:
  status   - runs roll-call                     owner: asset-register-keeper
             every: <cadence>
             from: take-in-lease       until: post-opening
handoffs:
  take-in-lease -> read-term / read-options [signed-lease]: the lease or
    the change, with every document it names
  read-term -> ask-lease-owner [term-and-payments]: the term and every
    payment, each with its clause
  read-options -> ask-lease-owner [options]: each option with its dates,
    its notice and its cost
  ask-lease-owner -> set-out-judgments [owner-intent]: how the business
    means to use the asset and each option, with the reasons
  set-out-judgments -> decide-judgments [lease-judgments]: each judgment
    with its effect
  decide-judgments -> enter-lease / record-learning [decided-judgments]:
    each decision in writing, with who decided and why
  enter-lease -> work-out-schedule [register-entry]: the lease as entered,
    at its version
  work-out-schedule -> prepare-opening [lease-schedule]: the liability,
    the asset and each period's entries
  prepare-opening -> check-opening [draft-opening-entry]: the entry at a
    version, with the schedule attached
  check-opening -> approve-opening [checked-opening-entry]: the entry
    checked against the schedule
  approve-opening -> post-opening [approved-opening-entry]: the entry as
    approved. A change to any line voids the approval
  post-opening -> set-period-entries [posted-opening-entry]: the entry as
    posted, with its ledger reference
  set-period-entries -> record-learning [period-entries]: the entries set
    to post, with the first and the last period
deviations:
  decide-judgments -> read-term [more-reading-needed]: the controller
    needs more of the lease read, such as a schedule of payments or an
    amendment, before deciding
  decide-judgments -> record-learning [no-lease]: the controller decides
    the contract holds no lease, so it is recorded as a service contract
    and nothing enters the register
  check-opening -> prepare-opening [entry-does-not-agree]: the entry does
    not balance or agree with the schedule, so it is prepared again
  approve-opening -> work-out-schedule [schedule-wrong]: the approver
    finds the schedule wrong, so it is worked out again and the entry
    prepared again from it
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for each lease owner, the controller
           and the journal approvers>
  systems: the contract repository (read), the lease register (write),
           the general ledger (write), the notification channel (write)
  data:    <your accounting framework> <version>, <your lease policy>
           <version>, <your source of discount rates> <version>, <your
           delegation of authority> <version>
policy:
  every lease signed or changed is entered in the register, and a lease
    is left out only when <your controller role> decided in writing that
    the contract holds no lease or that an exemption applies
  every judgment is decided in writing by <your controller role>, and no
    agent decides one
  no opening entry posts before a named approver who did not prepare it
    has approved it, with the approvers <your delegation of authority>
    names above <your threshold>
  the lease is accounted for under <your accounting framework> at the
    version in force for the entity, and a change to the framework takes
    effect only once <your controller role> confirms it
  the lease owner is asked about each option before it is judged, and the
    answer is kept with the decision
  a change to a lease starts a new run, and a closed period changes only
    through a correction <your controller role> approves
measures:
  cycle time: <days> from the signature to the opening entry posted
  on time: <target> share of leases entered within <days> of signature
  volume: <leases signed or changed per period>
  quality gate: every lease in the register traces to its signed
                document, a decision by a named person on each judgment,
                and an approved opening entry
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

347 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: account for a lease          id: <team>/account-for-a-lease   v1
from: ref/fin/account-for-a-lease v1
owner: <who>                          effective: <date>
trigger: a lease is signed, extended, changed or ended early and filed in
         <your contract repository>
         watch: record=<lease agreement>
                system=<your contract repository>
                change=<a lease is signed or changed>
concurrency: runs may overlap freely - one lease signed or changed is one
             run, a lease has one run open at a time, and a second change
             to the same lease waits for the first to post
goal: the lease entered in the register under <your accounting framework>
      on judgments a named person decided, its opening entry approved and
      posted, and each later period's entries set to post, within <days>
      of the signature or the change
phases:
  take-in-lease        - system: the signed lease or change lands from
                         <your contract repository> with every schedule,
                         amendment and side letter it names
                         owner: asset-register-keeper
                         after: trigger             automation: <level>
  read-term            - runs assessment: the start, the end, the fixed and
                         the variable payments, the increases and any
                         payment made before the start, each with the
                         clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  read-options         - runs assessment: each option to extend, to end
                         early or to buy, with its dates, its notice and
                         what it costs, each with the clause it came from
                         owner: asset-register-keeper
                         after: take-in-lease       automation: <level>
  ask-lease-owner      - human: <your lease owner role> says how the
                         business means to use the asset and whether it
                         expects to use each option, with the reasons
                         owner: <your lease owner role>
                         after: read-term + read-options by: <days>
                         automation: never
  set-out-judgments    - runs assessment: each judgment the lease raises,
                         such as whether the contract holds a lease,
                         whether each option will be used, the discount
                         rate and any exemption <your accounting framework>
                         allows, set out with the effect of each
                         owner: asset-register-keeper
                         after: ask-lease-owner     automation: <level>
  decide-judgments     - convenes decide-and-announce: <your controller
                         role> decides each judgment in writing with the
                         reason
                         owner: <your controller role>
                         after: set-out-judgments   by: <days>
                         automation: never
  enter-lease          - system: the lease entered in <your lease
                         register> with its term, its payments, its rate
                         and the decided judgments, at a version
                         owner: asset-register-keeper
                         after: decide-judgments    automation: <level>
  work-out-schedule    - runs assessment: the liability, the asset and
                         each period's interest, depreciation and payment
                         entries worked out under <your accounting
                         framework>, or the change to them for a change
                         to the lease
                         owner: asset-register-keeper
                         after: enter-lease         automation: <level>
  prepare-opening      - human: the entry that brings the lease onto the
                         books, or changes it, drafted in <your general
                         ledger> with the schedule as its support
                         owner: ledger-accountant
                         after: work-out-schedule   automation: <level>
  check-opening        - runs assessment: the entry's accounts and period
                         read as open, and the entry read as balanced and
                         equal to the schedule
                         owner: ledger-accountant
                         after: prepare-opening     automation: <level>
  approve-opening      - convenes approval: <your journal approver role>,
                         who did not prepare the entry, approves it at its
                         version, with the approvers <your delegation of
                         authority> names above <your threshold>
                         owner: <your journal approver role>
                         after: check-opening       by: <hours>
                         automation: never
  post-opening         - system: the approved entry posted in its period
                         in <your general ledger> with its approval and
                         the schedule attached
                         owner: ledger-accountant
                         after: approve-opening     automation: <level>
  set-period-entries   - system: each later period's interest,
                         depreciation and payment entries set in the
                         register to post at each close until the lease
                         ends or changes
                         owner: asset-register-keeper
                         after: post-opening        automation: <level>
  record-learning      - convenes debrief: which judgments the lease
                         raised, what the lease owner could and could not
                         say, and what the next lease needs
                         owner: asset-register-keeper
                         after: set-period-entries, or decide-judgments
                         when the contract holds no lease
                         automation: <level>
run-scoped:
  status   - runs roll-call                     owner: asset-register-keeper
             every: <cadence>
             from: take-in-lease       until: post-opening
handoffs:
  take-in-lease -> read-term / read-options [signed-lease]: the lease or
    the change, with every document it names
  read-term -> ask-lease-owner [term-and-payments]: the term and every
    payment, each with its clause
  read-options -> ask-lease-owner [options]: each option with its dates,
    its notice and its cost
  ask-lease-owner -> set-out-judgments [owner-intent]: how the business
    means to use the asset and each option, with the reasons
  set-out-judgments -> decide-judgments [lease-judgments]: each judgment
    with its effect
  decide-judgments -> enter-lease / record-learning [decided-judgments]:
    each decision in writing, with who decided and why
  enter-lease -> work-out-schedule [register-entry]: the lease as entered,
    at its version
  work-out-schedule -> prepare-opening [lease-schedule]: the liability,
    the asset and each period's entries
  prepare-opening -> check-opening [draft-opening-entry]: the entry at a
    version, with the schedule attached
  check-opening -> approve-opening [checked-opening-entry]: the entry
    checked against the schedule
  approve-opening -> post-opening [approved-opening-entry]: the entry as
    approved. A change to any line voids the approval
  post-opening -> set-period-entries [posted-opening-entry]: the entry as
    posted, with its ledger reference
  set-period-entries -> record-learning [period-entries]: the entries set
    to post, with the first and the last period
deviations:
  decide-judgments -> read-term [more-reading-needed]: the controller
    needs more of the lease read, such as a schedule of payments or an
    amendment, before deciding
  decide-judgments -> record-learning [no-lease]: the controller decides
    the contract holds no lease, so it is recorded as a service contract
    and nothing enters the register
  check-opening -> prepare-opening [entry-does-not-agree]: the entry does
    not balance or agree with the schedule, so it is prepared again
  approve-opening -> work-out-schedule [schedule-wrong]: the approver
    finds the schedule wrong, so it is worked out again and the entry
    prepared again from it
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for each lease owner, the controller
           and the journal approvers>
  systems: the contract repository (read), the lease register (write),
           the general ledger (write), the notification channel (write)
  data:    <your accounting framework> <version>, <your lease policy>
           <version>, <your source of discount rates> <version>, <your
           delegation of authority> <version>
policy:
  every lease signed or changed is entered in the register, and a lease
    is left out only when <your controller role> decided in writing that
    the contract holds no lease or that an exemption applies
  every judgment is decided in writing by <your controller role>, and no
    agent decides one
  no opening entry posts before a named approver who did not prepare it
    has approved it, with the approvers <your delegation of authority>
    names above <your threshold>
  the lease is accounted for under <your accounting framework> at the
    version in force for the entity, and a change to the framework takes
    effect only once <your controller role> confirms it
  the lease owner is asked about each option before it is judged, and the
    answer is kept with the decision
  a change to a lease starts a new run, and a closed period changes only
    through a correction <your controller role> approves
measures:
  cycle time: <days> from the signature to the opening entry posted
  on time: <target> share of leases entered within <days> of signature
  volume: <leases signed or changed per period>
  quality gate: every lease in the register traces to its signed
                document, a decision by a named person on each judgment,
                and an approved opening entry
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

51 blanks to fill. Everything else is the process.

this process from: ref/fin/account-for-a-lease v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.