Catalog / Business processes / Finance / Planning and forecasting / Report the Monthly Results
reference process · finance · 16 activities · 5 on the roster
Report the Monthly Results
Once the controller has signed off the month's close, the leaders need one report that sets the month's results beside the budget and the latest forecast and says why they differ. The reporting-manager agent owns the report and its date. The planning-analyst agent takes in the month's results from the ledger as the close signed them off, ties every figure to the trial balance, compares each line with the budget and the latest approved forecast for the month and the year to date, and marks each difference above `<your threshold>`. The budget-keeper agent supplies the budget and the forecast at their versions and what each budget owner has committed, spent and has left. The reporting-manager agent asks each budget owner the same questions about each marked difference, each owner explains their own lines, and the planning-analyst agent checks each explanation against the entries behind it. The reporting-manager agent writes the account of the month, and the chief financial officer (CFO) releases the report. The run closes when every leader holds the report on its date, each question they ask is answered, and every difference that will last is with the next reforecast.
The goals
Deliver the report within 5 working days of the close
Explain every difference above 5% of its budget line
Restate zero figures after release
Ask each budget owner for no more than 2 hours each month
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
16 activities from the controller signs off the month's close to every leader holds the month's report on its date, with every figure traced to the ledger, 2 of them gates a person has to sign.
Report the Monthly Results the controller signs off the month's close → every leader holds the month's report on its date, with every figure traced to the ledger
a figure does not tie to the ledger an explanation does not agree with the entries the CFO asks for a change a leader finds an error the controller signs off the month's close 1 Open the Month's Report what it covers, when it is due and who it goes to 2 Take in the Closed Results the month's figures from the ledger, as signed off 3 Take in the Budget and the Forecast the month and the year to date, each at its version 4 Read What Each Owner Has Committed committed, spent and left on each line 5 Tie Every Figure to the Ledger each result traced to the trial balance 6 Compare the Results with the Plan each line against the budget and the latest forecast 7 Mark the Differences above the Threshold each line whose difference passes the threshold 8 Ask Each Budget Owner the Same Questions the cause, whether timing or lasting, and what happens next 9 Explain Each Difference each budget owner answers for their own lines a person signs · never an agent 10 Check Each Explanation against the Ledger the cause agrees with the entries behind the difference 11 Write the Account of the Month each result beside budget and forecast, with why it moved 12 Release the Report the CFO reads it and releases it a person signs · never an agent 13 Deliver the Report each leader receives it on its date 14 Answer the Leaders' Questions each question answered from the report and its sources 15 Hand On What the Next Forecast Takes In the differences that will last, to the next reforecast 16 Record What the Month Taught late answers, corrections, and what the next report changes every leader holds the month's report on its date, with every figure traced to the ledger
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: report the monthly results id: <team> /report-the-monthly-results v1
from: ref/fin/report-the-monthly-results v1
owner: <who> effective: <date>
trigger: the controller signs off the month's close at
ref/fin/close-the-month in <your general ledger>
watch: record=<month close> system=<your general ledger>
change=<the month's close is signed off>
concurrency: one run per month - the next month's run opens when this one
has delivered, and a corrected report is a new version within
the run that delivered it
goal: the leaders hold the month's results report within <days> of the
close, with every figure traced to the ledger and set beside the
budget and the latest approved forecast, every difference above
<your threshold> explained by its budget owner, and every
difference that will last handed to the next reforecast
phases:
open-report - human: the month the report covers, the date it
is due, the leaders it goes to, and the lines and
entities it is built on
owner: reporting-manager after: trigger
automation: <level>
take-in-results - runs collect-and-report: the month's results from
<your general ledger> as the close signed them
off, by budget line, by department and by entity
owner: planning-analyst after: open-report
automation: <level>
take-in-plan - runs collect-and-report: the budget and the
latest approved forecast for the month and the
year to date, each at its version
owner: budget-keeper after: open-report
automation: <level>
read-commitments - runs collect-and-report: what each budget owner
has committed, spent and has left on each line,
from <your budget record>
owner: budget-keeper after: open-report
automation: <level>
tie-to-ledger - runs allocate-and-reconcile: every result traced
to the trial balance the close signed off, and
each difference named with its source
owner: planning-analyst
after: take-in-results automation: <level>
compare-with-plan - runs assessment: each line set beside the budget
and the latest approved forecast, for the month
and the year to date, with the difference in
amount and in share
owner: planning-analyst
after: tie-to-ledger + take-in-plan +
read-commitments automation: <level>
mark-differences - runs assessment: each line whose difference
passes <your threshold> , marked with the budget
owner who answers for it
owner: planning-analyst
after: compare-with-plan automation: <level>
ask-owners - runs collect-and-report: each budget owner asked
the same questions about each marked line, such
as the cause, whether it is timing or will last,
and what happens next
owner: reporting-manager
after: mark-differences by: <days>
automation: <level>
explain-differences - human: each budget owner's answer for their own
lines, in their own words
owner: <your budget owner role>
after: ask-owners by: <days>
automation: never
check-explanations - runs assessment: each explanation set against the
entries in the ledger behind the difference, and
any explanation the entries do not support sent
back to its owner
owner: planning-analyst
after: explain-differences automation: <level>
write-account - human: the account of the month, with each result
beside the budget and the forecast and why it
moved, in plain words
owner: reporting-manager
after: check-explanations automation: <level>
release-report - convenes approval: <your CFO role> reads the
report and releases it as a named approver
owner: <your CFO role>
after: write-account by: <days>
automation: never
deliver-report - system: the report delivered to each leader in
<your reporting tool> at a version, on its date
owner: reporting-manager after: release-report
automation: <level>
answer-questions - human: each question a leader asks answered from
the report and its sources, and logged for the
next month
owner: reporting-manager after: deliver-report
automation: <level>
hand-on-differences - convenes briefing: each difference that will last
handed to the next run of
ref/fin/reforecast-the-year with its cause and its
owner
owner: planning-analyst
after: answer-questions automation: <level>
record-learning - convenes debrief: which answers were late, which
figures were corrected, which questions the report
could not answer, and what the next report changes
owner: reporting-manager
after: hand-on-differences automation: <level>
run-scoped:
due-date - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: deliver-report
answers - runs collect-and-report owner: reporting-manager
from: ask-owners until: check-explanations
handoffs:
open-report -> take-in-results / take-in-plan / read-commitments
[report-scope]: the month, the due date, the leaders it goes to and
the lines and entities it covers
take-in-results -> tie-to-ledger [closed-results]: the month's results
by line, department and entity, as the close signed them off
tie-to-ledger -> compare-with-plan [tied-results]: every result tied to
the trial balance, with each difference named
take-in-plan -> compare-with-plan [month-plan]: the budget and the
latest approved forecast, each at its version
read-commitments -> compare-with-plan [line-commitments]: committed,
spent and left on each line
compare-with-plan -> mark-differences [plan-comparison]: each line
beside the budget and the forecast, with its difference
mark-differences -> ask-owners [marked-differences]: each line past the
threshold, with its budget owner
ask-owners -> explain-differences [owner-questions]: the same questions
for each owner, about each of their marked lines
explain-differences -> check-explanations [owner-explanations]: each
owner's answer, with the date it arrived
check-explanations -> write-account [checked-explanations]: each
explanation marked as agreeing with the entries, and any that still
do not marked as such
write-account -> release-report [draft-report]: the draft report at a
version
release-report -> deliver-report [released-report]: the report as
released, with the name of who released it. A change to any figure
voids the release
deliver-report -> answer-questions [delivered-report]: the report at its
version, and the date each leader received it
answer-questions -> hand-on-differences [leader-questions]: each
question and its answer
hand-on-differences -> record-learning [differences-handed-on]: each
difference that will last, as the next reforecast received it
deviations:
tie-to-ledger -> take-in-results [figure-does-not-tie]: a figure does
not tie to the trial balance, so the results are read again, and a
difference in the ledger itself goes to the controller
check-explanations -> explain-differences [explanation-unsupported]: an
explanation does not agree with the entries behind the difference, so
it goes back to its owner with the entries named
release-report -> write-account [change-requested]: the CFO asks for a
change, so the account is written again, and a figure changes only
when its source does
answer-questions -> tie-to-ledger [error-found]: a leader finds an
error, so the figure is traced to the ledger, and a corrected report
goes out as a new version that names the change
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the controller, the
budget owners and the leaders who receive the report>
systems: <your general ledger> (read), <your budget record> (read),
<your financial planning system> (read), <your reporting tool>
(write), the notification channel (write)
data: the budget <version> , the latest approved forecast <version> ,
<your threshold> for a difference, <your report template>
<version> , <your chart of accounts> <version>
policy:
every figure in the report traces to the ledger as the close signed it
off, and a figure from anywhere else is marked with its source
each difference is explained by the budget owner who answers for the
line, and an agent never writes a cause the owner did not give
the report goes out only after <your CFO role> releases it, and a figure
changed after release makes a new version that names the change
a figure stays in the report when someone would rather not show it, and
a request to leave one out is recorded with the person's decision
the report is delivered on its date, and an owner who has not answered
is marked as not answered in it
the report is for the company's own leaders and board, and a figure goes
outside the company only through the process that owns that report
and its named approver
measures:
cycle time: <days> from the close to the report delivered
on time: <target> share of reports delivered on their date
volume: <reports per year>
quality gate: every figure ties to the ledger, and every difference
above the threshold carries its owner's explanation
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
307 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: report the monthly results id: <team>/report-the-monthly-results v1
from: ref/fin/report-the-monthly-results v1
owner: <who> effective: <date>
trigger: the controller signs off the month's close at
ref/fin/close-the-month in <your general ledger>
watch: record=<month close> system=<your general ledger>
change=<the month's close is signed off>
concurrency: one run per month - the next month's run opens when this one
has delivered, and a corrected report is a new version within
the run that delivered it
goal: the leaders hold the month's results report within <days> of the
close, with every figure traced to the ledger and set beside the
budget and the latest approved forecast, every difference above
<your threshold> explained by its budget owner, and every
difference that will last handed to the next reforecast
phases:
open-report - human: the month the report covers, the date it
is due, the leaders it goes to, and the lines and
entities it is built on
owner: reporting-manager after: trigger
automation: <level>
take-in-results - runs collect-and-report: the month's results from
<your general ledger> as the close signed them
off, by budget line, by department and by entity
owner: planning-analyst after: open-report
automation: <level>
take-in-plan - runs collect-and-report: the budget and the
latest approved forecast for the month and the
year to date, each at its version
owner: budget-keeper after: open-report
automation: <level>
read-commitments - runs collect-and-report: what each budget owner
has committed, spent and has left on each line,
from <your budget record>
owner: budget-keeper after: open-report
automation: <level>
tie-to-ledger - runs allocate-and-reconcile: every result traced
to the trial balance the close signed off, and
each difference named with its source
owner: planning-analyst
after: take-in-results automation: <level>
compare-with-plan - runs assessment: each line set beside the budget
and the latest approved forecast, for the month
and the year to date, with the difference in
amount and in share
owner: planning-analyst
after: tie-to-ledger + take-in-plan +
read-commitments automation: <level>
mark-differences - runs assessment: each line whose difference
passes <your threshold>, marked with the budget
owner who answers for it
owner: planning-analyst
after: compare-with-plan automation: <level>
ask-owners - runs collect-and-report: each budget owner asked
the same questions about each marked line, such
as the cause, whether it is timing or will last,
and what happens next
owner: reporting-manager
after: mark-differences by: <days>
automation: <level>
explain-differences - human: each budget owner's answer for their own
lines, in their own words
owner: <your budget owner role>
after: ask-owners by: <days>
automation: never
check-explanations - runs assessment: each explanation set against the
entries in the ledger behind the difference, and
any explanation the entries do not support sent
back to its owner
owner: planning-analyst
after: explain-differences automation: <level>
write-account - human: the account of the month, with each result
beside the budget and the forecast and why it
moved, in plain words
owner: reporting-manager
after: check-explanations automation: <level>
release-report - convenes approval: <your CFO role> reads the
report and releases it as a named approver
owner: <your CFO role>
after: write-account by: <days>
automation: never
deliver-report - system: the report delivered to each leader in
<your reporting tool> at a version, on its date
owner: reporting-manager after: release-report
automation: <level>
answer-questions - human: each question a leader asks answered from
the report and its sources, and logged for the
next month
owner: reporting-manager after: deliver-report
automation: <level>
hand-on-differences - convenes briefing: each difference that will last
handed to the next run of
ref/fin/reforecast-the-year with its cause and its
owner
owner: planning-analyst
after: answer-questions automation: <level>
record-learning - convenes debrief: which answers were late, which
figures were corrected, which questions the report
could not answer, and what the next report changes
owner: reporting-manager
after: hand-on-differences automation: <level>
run-scoped:
due-date - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: deliver-report
answers - runs collect-and-report owner: reporting-manager
from: ask-owners until: check-explanations
handoffs:
open-report -> take-in-results / take-in-plan / read-commitments
[report-scope]: the month, the due date, the leaders it goes to and
the lines and entities it covers
take-in-results -> tie-to-ledger [closed-results]: the month's results
by line, department and entity, as the close signed them off
tie-to-ledger -> compare-with-plan [tied-results]: every result tied to
the trial balance, with each difference named
take-in-plan -> compare-with-plan [month-plan]: the budget and the
latest approved forecast, each at its version
read-commitments -> compare-with-plan [line-commitments]: committed,
spent and left on each line
compare-with-plan -> mark-differences [plan-comparison]: each line
beside the budget and the forecast, with its difference
mark-differences -> ask-owners [marked-differences]: each line past the
threshold, with its budget owner
ask-owners -> explain-differences [owner-questions]: the same questions
for each owner, about each of their marked lines
explain-differences -> check-explanations [owner-explanations]: each
owner's answer, with the date it arrived
check-explanations -> write-account [checked-explanations]: each
explanation marked as agreeing with the entries, and any that still
do not marked as such
write-account -> release-report [draft-report]: the draft report at a
version
release-report -> deliver-report [released-report]: the report as
released, with the name of who released it. A change to any figure
voids the release
deliver-report -> answer-questions [delivered-report]: the report at its
version, and the date each leader received it
answer-questions -> hand-on-differences [leader-questions]: each
question and its answer
hand-on-differences -> record-learning [differences-handed-on]: each
difference that will last, as the next reforecast received it
deviations:
tie-to-ledger -> take-in-results [figure-does-not-tie]: a figure does
not tie to the trial balance, so the results are read again, and a
difference in the ledger itself goes to the controller
check-explanations -> explain-differences [explanation-unsupported]: an
explanation does not agree with the entries behind the difference, so
it goes back to its owner with the entries named
release-report -> write-account [change-requested]: the CFO asks for a
change, so the account is written again, and a figure changes only
when its source does
answer-questions -> tie-to-ledger [error-found]: a leader finds an
error, so the figure is traced to the ledger, and a corrected report
goes out as a new version that names the change
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the controller, the
budget owners and the leaders who receive the report>
systems: <your general ledger> (read), <your budget record> (read),
<your financial planning system> (read), <your reporting tool>
(write), the notification channel (write)
data: the budget <version>, the latest approved forecast <version>,
<your threshold> for a difference, <your report template>
<version>, <your chart of accounts> <version>
policy:
every figure in the report traces to the ledger as the close signed it
off, and a figure from anywhere else is marked with its source
each difference is explained by the budget owner who answers for the
line, and an agent never writes a cause the owner did not give
the report goes out only after <your CFO role> releases it, and a figure
changed after release makes a new version that names the change
a figure stays in the report when someone would rather not show it, and
a request to leave one out is recorded with the person's decision
the report is delivered on its date, and an owner who has not answered
is marked as not answered in it
the report is for the company's own leaders and board, and a figure goes
outside the company only through the process that owns that report
and its named approver
measures:
cycle time: <days> from the close to the report delivered
on time: <target> share of reports delivered on their date
volume: <reports per year>
quality gate: every figure ties to the ledger, and every difference
above the threshold carries its owner's explanation
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
362 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: report the monthly results id: <team>/report-the-monthly-results v1
from: ref/fin/report-the-monthly-results v1
owner: <who> effective: <date>
trigger: the controller signs off the month's close at
ref/fin/close-the-month in <your general ledger>
watch: record=<month close> system=<your general ledger>
change=<the month's close is signed off>
concurrency: one run per month - the next month's run opens when this one
has delivered, and a corrected report is a new version within
the run that delivered it
goal: the leaders hold the month's results report within <days> of the
close, with every figure traced to the ledger and set beside the
budget and the latest approved forecast, every difference above
<your threshold> explained by its budget owner, and every
difference that will last handed to the next reforecast
phases:
open-report - human: the month the report covers, the date it
is due, the leaders it goes to, and the lines and
entities it is built on
owner: reporting-manager after: trigger
automation: <level>
take-in-results - runs collect-and-report: the month's results from
<your general ledger> as the close signed them
off, by budget line, by department and by entity
owner: planning-analyst after: open-report
automation: <level>
take-in-plan - runs collect-and-report: the budget and the
latest approved forecast for the month and the
year to date, each at its version
owner: budget-keeper after: open-report
automation: <level>
read-commitments - runs collect-and-report: what each budget owner
has committed, spent and has left on each line,
from <your budget record>
owner: budget-keeper after: open-report
automation: <level>
tie-to-ledger - runs allocate-and-reconcile: every result traced
to the trial balance the close signed off, and
each difference named with its source
owner: planning-analyst
after: take-in-results automation: <level>
compare-with-plan - runs assessment: each line set beside the budget
and the latest approved forecast, for the month
and the year to date, with the difference in
amount and in share
owner: planning-analyst
after: tie-to-ledger + take-in-plan +
read-commitments automation: <level>
mark-differences - runs assessment: each line whose difference
passes <your threshold>, marked with the budget
owner who answers for it
owner: planning-analyst
after: compare-with-plan automation: <level>
ask-owners - runs collect-and-report: each budget owner asked
the same questions about each marked line, such
as the cause, whether it is timing or will last,
and what happens next
owner: reporting-manager
after: mark-differences by: <days>
automation: <level>
explain-differences - human: each budget owner's answer for their own
lines, in their own words
owner: <your budget owner role>
after: ask-owners by: <days>
automation: never
check-explanations - runs assessment: each explanation set against the
entries in the ledger behind the difference, and
any explanation the entries do not support sent
back to its owner
owner: planning-analyst
after: explain-differences automation: <level>
write-account - human: the account of the month, with each result
beside the budget and the forecast and why it
moved, in plain words
owner: reporting-manager
after: check-explanations automation: <level>
release-report - convenes approval: <your CFO role> reads the
report and releases it as a named approver
owner: <your CFO role>
after: write-account by: <days>
automation: never
deliver-report - system: the report delivered to each leader in
<your reporting tool> at a version, on its date
owner: reporting-manager after: release-report
automation: <level>
answer-questions - human: each question a leader asks answered from
the report and its sources, and logged for the
next month
owner: reporting-manager after: deliver-report
automation: <level>
hand-on-differences - convenes briefing: each difference that will last
handed to the next run of
ref/fin/reforecast-the-year with its cause and its
owner
owner: planning-analyst
after: answer-questions automation: <level>
record-learning - convenes debrief: which answers were late, which
figures were corrected, which questions the report
could not answer, and what the next report changes
owner: reporting-manager
after: hand-on-differences automation: <level>
run-scoped:
due-date - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: deliver-report
answers - runs collect-and-report owner: reporting-manager
from: ask-owners until: check-explanations
handoffs:
open-report -> take-in-results / take-in-plan / read-commitments
[report-scope]: the month, the due date, the leaders it goes to and
the lines and entities it covers
take-in-results -> tie-to-ledger [closed-results]: the month's results
by line, department and entity, as the close signed them off
tie-to-ledger -> compare-with-plan [tied-results]: every result tied to
the trial balance, with each difference named
take-in-plan -> compare-with-plan [month-plan]: the budget and the
latest approved forecast, each at its version
read-commitments -> compare-with-plan [line-commitments]: committed,
spent and left on each line
compare-with-plan -> mark-differences [plan-comparison]: each line
beside the budget and the forecast, with its difference
mark-differences -> ask-owners [marked-differences]: each line past the
threshold, with its budget owner
ask-owners -> explain-differences [owner-questions]: the same questions
for each owner, about each of their marked lines
explain-differences -> check-explanations [owner-explanations]: each
owner's answer, with the date it arrived
check-explanations -> write-account [checked-explanations]: each
explanation marked as agreeing with the entries, and any that still
do not marked as such
write-account -> release-report [draft-report]: the draft report at a
version
release-report -> deliver-report [released-report]: the report as
released, with the name of who released it. A change to any figure
voids the release
deliver-report -> answer-questions [delivered-report]: the report at its
version, and the date each leader received it
answer-questions -> hand-on-differences [leader-questions]: each
question and its answer
hand-on-differences -> record-learning [differences-handed-on]: each
difference that will last, as the next reforecast received it
deviations:
tie-to-ledger -> take-in-results [figure-does-not-tie]: a figure does
not tie to the trial balance, so the results are read again, and a
difference in the ledger itself goes to the controller
check-explanations -> explain-differences [explanation-unsupported]: an
explanation does not agree with the entries behind the difference, so
it goes back to its owner with the entries named
release-report -> write-account [change-requested]: the CFO asks for a
change, so the account is written again, and a figure changes only
when its source does
answer-questions -> tie-to-ledger [error-found]: a leader finds an
error, so the figure is traced to the ledger, and a corrected report
goes out as a new version that names the change
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the controller, the
budget owners and the leaders who receive the report>
systems: <your general ledger> (read), <your budget record> (read),
<your financial planning system> (read), <your reporting tool>
(write), the notification channel (write)
data: the budget <version>, the latest approved forecast <version>,
<your threshold> for a difference, <your report template>
<version>, <your chart of accounts> <version>
policy:
every figure in the report traces to the ledger as the close signed it
off, and a figure from anywhere else is marked with its source
each difference is explained by the budget owner who answers for the
line, and an agent never writes a cause the owner did not give
the report goes out only after <your CFO role> releases it, and a figure
changed after release makes a new version that names the change
a figure stays in the report when someone would rather not show it, and
a request to leave one out is recorded with the person's decision
the report is delivered on its date, and an owner who has not answered
is marked as not answered in it
the report is for the company's own leaders and board, and a figure goes
outside the company only through the process that owns that report
and its named approver
measures:
cycle time: <days> from the close to the report delivered
on time: <target> share of reports delivered on their date
volume: <reports per year>
quality gate: every figure ties to the ledger, and every difference
above the threshold carries its owner's explanation
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
367 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: report the monthly results id: <team>/report-the-monthly-results v1
from: ref/fin/report-the-monthly-results v1
owner: <who> effective: <date>
trigger: the controller signs off the month's close at
ref/fin/close-the-month in <your general ledger>
watch: record=<month close> system=<your general ledger>
change=<the month's close is signed off>
concurrency: one run per month - the next month's run opens when this one
has delivered, and a corrected report is a new version within
the run that delivered it
goal: the leaders hold the month's results report within <days> of the
close, with every figure traced to the ledger and set beside the
budget and the latest approved forecast, every difference above
<your threshold> explained by its budget owner, and every
difference that will last handed to the next reforecast
phases:
open-report - human: the month the report covers, the date it
is due, the leaders it goes to, and the lines and
entities it is built on
owner: reporting-manager after: trigger
automation: <level>
take-in-results - runs collect-and-report: the month's results from
<your general ledger> as the close signed them
off, by budget line, by department and by entity
owner: planning-analyst after: open-report
automation: <level>
take-in-plan - runs collect-and-report: the budget and the
latest approved forecast for the month and the
year to date, each at its version
owner: budget-keeper after: open-report
automation: <level>
read-commitments - runs collect-and-report: what each budget owner
has committed, spent and has left on each line,
from <your budget record>
owner: budget-keeper after: open-report
automation: <level>
tie-to-ledger - runs allocate-and-reconcile: every result traced
to the trial balance the close signed off, and
each difference named with its source
owner: planning-analyst
after: take-in-results automation: <level>
compare-with-plan - runs assessment: each line set beside the budget
and the latest approved forecast, for the month
and the year to date, with the difference in
amount and in share
owner: planning-analyst
after: tie-to-ledger + take-in-plan +
read-commitments automation: <level>
mark-differences - runs assessment: each line whose difference
passes <your threshold>, marked with the budget
owner who answers for it
owner: planning-analyst
after: compare-with-plan automation: <level>
ask-owners - runs collect-and-report: each budget owner asked
the same questions about each marked line, such
as the cause, whether it is timing or will last,
and what happens next
owner: reporting-manager
after: mark-differences by: <days>
automation: <level>
explain-differences - human: each budget owner's answer for their own
lines, in their own words
owner: <your budget owner role>
after: ask-owners by: <days>
automation: never
check-explanations - runs assessment: each explanation set against the
entries in the ledger behind the difference, and
any explanation the entries do not support sent
back to its owner
owner: planning-analyst
after: explain-differences automation: <level>
write-account - human: the account of the month, with each result
beside the budget and the forecast and why it
moved, in plain words
owner: reporting-manager
after: check-explanations automation: <level>
release-report - convenes approval: <your CFO role> reads the
report and releases it as a named approver
owner: <your CFO role>
after: write-account by: <days>
automation: never
deliver-report - system: the report delivered to each leader in
<your reporting tool> at a version, on its date
owner: reporting-manager after: release-report
automation: <level>
answer-questions - human: each question a leader asks answered from
the report and its sources, and logged for the
next month
owner: reporting-manager after: deliver-report
automation: <level>
hand-on-differences - convenes briefing: each difference that will last
handed to the next run of
ref/fin/reforecast-the-year with its cause and its
owner
owner: planning-analyst
after: answer-questions automation: <level>
record-learning - convenes debrief: which answers were late, which
figures were corrected, which questions the report
could not answer, and what the next report changes
owner: reporting-manager
after: hand-on-differences automation: <level>
run-scoped:
due-date - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: deliver-report
answers - runs collect-and-report owner: reporting-manager
from: ask-owners until: check-explanations
handoffs:
open-report -> take-in-results / take-in-plan / read-commitments
[report-scope]: the month, the due date, the leaders it goes to and
the lines and entities it covers
take-in-results -> tie-to-ledger [closed-results]: the month's results
by line, department and entity, as the close signed them off
tie-to-ledger -> compare-with-plan [tied-results]: every result tied to
the trial balance, with each difference named
take-in-plan -> compare-with-plan [month-plan]: the budget and the
latest approved forecast, each at its version
read-commitments -> compare-with-plan [line-commitments]: committed,
spent and left on each line
compare-with-plan -> mark-differences [plan-comparison]: each line
beside the budget and the forecast, with its difference
mark-differences -> ask-owners [marked-differences]: each line past the
threshold, with its budget owner
ask-owners -> explain-differences [owner-questions]: the same questions
for each owner, about each of their marked lines
explain-differences -> check-explanations [owner-explanations]: each
owner's answer, with the date it arrived
check-explanations -> write-account [checked-explanations]: each
explanation marked as agreeing with the entries, and any that still
do not marked as such
write-account -> release-report [draft-report]: the draft report at a
version
release-report -> deliver-report [released-report]: the report as
released, with the name of who released it. A change to any figure
voids the release
deliver-report -> answer-questions [delivered-report]: the report at its
version, and the date each leader received it
answer-questions -> hand-on-differences [leader-questions]: each
question and its answer
hand-on-differences -> record-learning [differences-handed-on]: each
difference that will last, as the next reforecast received it
deviations:
tie-to-ledger -> take-in-results [figure-does-not-tie]: a figure does
not tie to the trial balance, so the results are read again, and a
difference in the ledger itself goes to the controller
check-explanations -> explain-differences [explanation-unsupported]: an
explanation does not agree with the entries behind the difference, so
it goes back to its owner with the entries named
release-report -> write-account [change-requested]: the CFO asks for a
change, so the account is written again, and a figure changes only
when its source does
answer-questions -> tie-to-ledger [error-found]: a leader finds an
error, so the figure is traced to the ledger, and a corrected report
goes out as a new version that names the change
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the controller, the
budget owners and the leaders who receive the report>
systems: <your general ledger> (read), <your budget record> (read),
<your financial planning system> (read), <your reporting tool>
(write), the notification channel (write)
data: the budget <version>, the latest approved forecast <version>,
<your threshold> for a difference, <your report template>
<version>, <your chart of accounts> <version>
policy:
every figure in the report traces to the ledger as the close signed it
off, and a figure from anywhere else is marked with its source
each difference is explained by the budget owner who answers for the
line, and an agent never writes a cause the owner did not give
the report goes out only after <your CFO role> releases it, and a figure
changed after release makes a new version that names the change
a figure stays in the report when someone would rather not show it, and
a request to leave one out is recorded with the person's decision
the report is delivered on its date, and an owner who has not answered
is marked as not answered in it
the report is for the company's own leaders and board, and a figure goes
outside the company only through the process that owns that report
and its named approver
measures:
cycle time: <days> from the close to the report delivered
on time: <target> share of reports delivered on their date
volume: <reports per year>
quality gate: every figure ties to the ledger, and every difference
above the threshold carries its owner's explanation
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
358 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: report the monthly results id: <team>/report-the-monthly-results v1
from: ref/fin/report-the-monthly-results v1
owner: <who> effective: <date>
trigger: the controller signs off the month's close at
ref/fin/close-the-month in <your general ledger>
watch: record=<month close> system=<your general ledger>
change=<the month's close is signed off>
concurrency: one run per month - the next month's run opens when this one
has delivered, and a corrected report is a new version within
the run that delivered it
goal: the leaders hold the month's results report within <days> of the
close, with every figure traced to the ledger and set beside the
budget and the latest approved forecast, every difference above
<your threshold> explained by its budget owner, and every
difference that will last handed to the next reforecast
phases:
open-report - human: the month the report covers, the date it
is due, the leaders it goes to, and the lines and
entities it is built on
owner: reporting-manager after: trigger
automation: <level>
take-in-results - runs collect-and-report: the month's results from
<your general ledger> as the close signed them
off, by budget line, by department and by entity
owner: planning-analyst after: open-report
automation: <level>
take-in-plan - runs collect-and-report: the budget and the
latest approved forecast for the month and the
year to date, each at its version
owner: budget-keeper after: open-report
automation: <level>
read-commitments - runs collect-and-report: what each budget owner
has committed, spent and has left on each line,
from <your budget record>
owner: budget-keeper after: open-report
automation: <level>
tie-to-ledger - runs allocate-and-reconcile: every result traced
to the trial balance the close signed off, and
each difference named with its source
owner: planning-analyst
after: take-in-results automation: <level>
compare-with-plan - runs assessment: each line set beside the budget
and the latest approved forecast, for the month
and the year to date, with the difference in
amount and in share
owner: planning-analyst
after: tie-to-ledger + take-in-plan +
read-commitments automation: <level>
mark-differences - runs assessment: each line whose difference
passes <your threshold>, marked with the budget
owner who answers for it
owner: planning-analyst
after: compare-with-plan automation: <level>
ask-owners - runs collect-and-report: each budget owner asked
the same questions about each marked line, such
as the cause, whether it is timing or will last,
and what happens next
owner: reporting-manager
after: mark-differences by: <days>
automation: <level>
explain-differences - human: each budget owner's answer for their own
lines, in their own words
owner: <your budget owner role>
after: ask-owners by: <days>
automation: never
check-explanations - runs assessment: each explanation set against the
entries in the ledger behind the difference, and
any explanation the entries do not support sent
back to its owner
owner: planning-analyst
after: explain-differences automation: <level>
write-account - human: the account of the month, with each result
beside the budget and the forecast and why it
moved, in plain words
owner: reporting-manager
after: check-explanations automation: <level>
release-report - convenes approval: <your CFO role> reads the
report and releases it as a named approver
owner: <your CFO role>
after: write-account by: <days>
automation: never
deliver-report - system: the report delivered to each leader in
<your reporting tool> at a version, on its date
owner: reporting-manager after: release-report
automation: <level>
answer-questions - human: each question a leader asks answered from
the report and its sources, and logged for the
next month
owner: reporting-manager after: deliver-report
automation: <level>
hand-on-differences - convenes briefing: each difference that will last
handed to the next run of
ref/fin/reforecast-the-year with its cause and its
owner
owner: planning-analyst
after: answer-questions automation: <level>
record-learning - convenes debrief: which answers were late, which
figures were corrected, which questions the report
could not answer, and what the next report changes
owner: reporting-manager
after: hand-on-differences automation: <level>
run-scoped:
due-date - runs roll-call owner: reporting-manager
every: <cadence>
from: open-report until: deliver-report
answers - runs collect-and-report owner: reporting-manager
from: ask-owners until: check-explanations
handoffs:
open-report -> take-in-results / take-in-plan / read-commitments
[report-scope]: the month, the due date, the leaders it goes to and
the lines and entities it covers
take-in-results -> tie-to-ledger [closed-results]: the month's results
by line, department and entity, as the close signed them off
tie-to-ledger -> compare-with-plan [tied-results]: every result tied to
the trial balance, with each difference named
take-in-plan -> compare-with-plan [month-plan]: the budget and the
latest approved forecast, each at its version
read-commitments -> compare-with-plan [line-commitments]: committed,
spent and left on each line
compare-with-plan -> mark-differences [plan-comparison]: each line
beside the budget and the forecast, with its difference
mark-differences -> ask-owners [marked-differences]: each line past the
threshold, with its budget owner
ask-owners -> explain-differences [owner-questions]: the same questions
for each owner, about each of their marked lines
explain-differences -> check-explanations [owner-explanations]: each
owner's answer, with the date it arrived
check-explanations -> write-account [checked-explanations]: each
explanation marked as agreeing with the entries, and any that still
do not marked as such
write-account -> release-report [draft-report]: the draft report at a
version
release-report -> deliver-report [released-report]: the report as
released, with the name of who released it. A change to any figure
voids the release
deliver-report -> answer-questions [delivered-report]: the report at its
version, and the date each leader received it
answer-questions -> hand-on-differences [leader-questions]: each
question and its answer
hand-on-differences -> record-learning [differences-handed-on]: each
difference that will last, as the next reforecast received it
deviations:
tie-to-ledger -> take-in-results [figure-does-not-tie]: a figure does
not tie to the trial balance, so the results are read again, and a
difference in the ledger itself goes to the controller
check-explanations -> explain-differences [explanation-unsupported]: an
explanation does not agree with the entries behind the difference, so
it goes back to its owner with the entries named
release-report -> write-account [change-requested]: the CFO asks for a
change, so the account is written again, and a figure changes only
when its source does
answer-questions -> tie-to-ledger [error-found]: a leader finds an
error, so the figure is traced to the ledger, and a corrected report
goes out as a new version that names the change
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the controller, the
budget owners and the leaders who receive the report>
systems: <your general ledger> (read), <your budget record> (read),
<your financial planning system> (read), <your reporting tool>
(write), the notification channel (write)
data: the budget <version>, the latest approved forecast <version>,
<your threshold> for a difference, <your report template>
<version>, <your chart of accounts> <version>
policy:
every figure in the report traces to the ledger as the close signed it
off, and a figure from anywhere else is marked with its source
each difference is explained by the budget owner who answers for the
line, and an agent never writes a cause the owner did not give
the report goes out only after <your CFO role> releases it, and a figure
changed after release makes a new version that names the change
a figure stays in the report when someone would rather not show it, and
a request to leave one out is recorded with the person's decision
the report is delivered on its date, and an owner who has not answered
is marked as not answered in it
the report is for the company's own leaders and board, and a figure goes
outside the company only through the process that owns that report
and its named approver
measures:
cycle time: <days> from the close to the report delivered
on time: <target> share of reports delivered on their date
volume: <reports per year>
quality gate: every figure ties to the ledger, and every difference
above the threshold carries its owner's explanation
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
49 blanks to fill. Everything else is the process.
this process
from: ref/fin/report-the-monthly-results v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.