Catalog / Business processes / Finance / Planning and forecasting / Set the Annual Budget
reference process · finance · 18 activities · 9 on the roster
Set the Annual Budget
Each year, once the executive team has set the company's targets for the next financial year from the first year of the long-range plan, the company needs one budget that says what each department may spend and what the company expects to earn. The planning-analyst agent sets the calendar and proposes the assumptions the drafts are built on, such as prices, growth, pay increases and exchange rates, and the chief financial officer (CFO) agrees them. The budget-keeper agent lists the money that agreements signed in earlier years already commit to the year, and the workforce-planner agent supplies each team's headcount and labor cost from the approved workforce plan. Each department head drafts a budget inside the instructions. The planning-analyst agent checks each draft, puts the drafts together into the company's income, costs, cash and balance sheet, tests the whole against the targets, and builds two or three options for closing any gap, each saying what it gives up. The decision-coordinator agent puts the trade-offs to the executive team, which settles them in a recorded decision, and the people the delegation of authority names, such as the board, approve the budget. The run closes when the budget-keeper agent has issued the approved budget at a version, each budget owner knows what their lines hold for the year, and what the budget rests on is written down.
The goals
Approve the budget by the first day of the financial year
Build in 100% of the targets the executive team set
Land the year within 3% of the budgeted operating result
Settle the budget in no more than 3 rounds of drafts
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
18 activities from the executive team sets the targets for the next financial year, and the CFO opens the budget to one approved budget for the year at one version, and every budget owner knows what their lines hold, 4 of them gates a person has to sign.
Set the Annual Budget the executive team sets the targets for the next financial year, and the CFO opens the budget → one approved budget for the year at one version, and every budget owner knows what their lines hold
the CFO will not agree an assumption a draft is incomplete or outside the instructions the gap is wider than any option can close the executive team rejects every option the approvers will not approve the executive team sets the targets for the next financial year, and the CFO opens the budget 1 Open the Budget Year the year, the calendar of due dates and who approves 2 Take in the Company Targets the year's targets from the long-range plan's first year 3 Propose the Assumptions prices, growth, pay, inflation and exchange rates, sourced 4 Agree the Assumptions the CFO agrees what every draft is built on a person signs · never an agent 5 List the Money Already Committed earlier agreements that commit money in this year 6 Issue the Budget Instructions the calendar, assumptions, template and committed money 7 Take in the Labor Cost headcount and labor cost by team, from the workforce plan 8 Draft Each Department's Budget each head's costs and income, with a reason for each line a person signs · never an agent 9 Check Each Draft complete, and matching the assumptions and workforce plan 10 Put the Drafts Together the year's income, costs, cash and balance sheet 11 Test the Budget against the Targets the gap to each target, line by line 12 Build the Options two or three ways to close the gap, and what each gives up 13 Put the Trade-Offs to the Executive Team the options, their evidence and what each one gives up 14 Settle the Trade-Offs the executive team chooses, with any dissent recorded a person signs · never an agent 15 Approve the Budget the approvers the delegation names, such as the board a person signs · never an agent 16 Issue the Budget at a Version each owner's lines loaded at one version, phased by month 17 Tell Each Budget Owner What They Hold each owner's lines, who may move money, and the next review 18 Record What the Budget Rests On assumptions, gaps accepted, and what next year checks first one approved budget for the year at one version, and every budget owner knows what their lines hold
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: set the annual budget id: <team> /set-the-annual-budget v1
from: ref/fin/set-the-annual-budget v1
owner: <who> effective: <date>
trigger: the executive team sets the company's targets for the next
financial year from the first year of <your long-range plan> ,
and <your CFO role> opens the budget on <your finance calendar>
watch: record=<company targets for the year>
system=<your financial planning system>
change=<the targets for the next financial year are set>
concurrency: one run per financial year - a change to the issued budget
during the year is its own run that starts from the issued
budget and replaces it at a new version, approved by the
same people, and a reforecast never changes the budget
goal: one budget for the financial year at one version, approved by <the
approvers your delegation of authority names> by <date> , with every
line built on the agreed assumptions, the labor cost taken from the
approved workforce plan, every gap to the company's targets closed
or accepted in a recorded decision, and every budget owner told what
their lines hold
phases:
open-budget - human: the financial year the budget covers, the
calendar of due dates, the people who approve it
and the targets it is built from
owner: planning-analyst after: trigger
automation: <level>
take-in-targets - runs collect-and-report: the company's targets for
the year, such as revenue, operating result, cash
and headcount, from the first year of <your
long-range plan> at its version
owner: planning-analyst after: open-budget
automation: <level>
propose-assumptions - runs assessment: the prices, the growth, the pay
increases, inflation and the exchange rates the
drafts will use, each with its source, and any
figure with no source marked as an estimate
owner: planning-analyst
after: take-in-targets automation: <level>
agree-assumptions - convenes decide-and-announce: <your CFO role>
agrees the assumptions every draft is built on,
and a change to one later reopens every draft it
touches
owner: <your CFO role>
after: propose-assumptions by: <days>
automation: never
list-commitments - runs collect-and-report: every agreement signed in
an earlier year that commits money in this one,
such as a lease, a subscription or a contract for
several years, by budget line and with its term
owner: budget-keeper after: open-budget
automation: <level>
issue-instructions - convenes briefing: each department head given the
calendar, the agreed assumptions, <your budget
template>, the money already committed to the
department, and the labor cost the department's
part of the workforce plan is checked against
owner: planning-analyst
after: agree-assumptions + list-commitments
automation: <level>
take-in-labor-cost - runs collect-and-report: each team's headcount,
start dates and labor cost from the workforce plan
approved at ref/hr/plan-the-workforce, at its
version
owner: workforce-planner
after: issue-instructions automation: <level>
draft-budgets - human: each department head's budget for the year,
with its costs, any income the department earns,
the reason for each line and the target each line
serves
owner: <your department head role>
after: issue-instructions by: <weeks>
automation: never
check-drafts - runs assessment: each draft checked as complete,
built on the agreed assumptions, carrying the money
already committed and agreeing with the workforce
plan's labor cost, with each gap named and sent back
to its department head
owner: planning-analyst
after: draft-budgets + take-in-labor-cost
automation: <level>
put-together - system: the drafts combined into the company's
income, costs, cash and balance sheet for the year
in <your financial planning system> , by month and
by entity, in each entity's currency at the agreed
exchange rates
owner: planning-analyst after: check-drafts
automation: <level>
test-targets - runs assessment: the combined budget set beside
each of the company's targets, with the gap on
each line and the departments that make it up
owner: planning-analyst after: put-together
automation: <level>
build-options - human: two or three ways to close the gap, each
with its figures by department and what it gives
up against the targets
owner: planning-analyst after: test-targets
automation: <level>
put-trade-offs - convenes briefing: the options put to the
executive team, with the evidence behind each
figure and what each one gives up
owner: decision-coordinator
after: build-options automation: <level>
settle-trade-offs - convenes decide-and-announce: the executive team
chooses one option, and the decision is recorded
with who disagreed and why
owner: <your chief executive role>
after: put-trade-offs by: <date>
automation: never
approve-budget - convenes approval: <the approvers your delegation
of authority names for the budget, such as the
board> approve the budget at its version as named
approvers, and the decision-coordinator agent
records the approval
owner: <your budget approver role>
after: settle-trade-offs by: <date>
automation: never
issue-budget - system: the approved budget loaded to <your budget
record> at one version, with one line for each
budget owner, phased by month
owner: budget-keeper after: approve-budget
automation: <level>
tell-owners - convenes briefing: each budget owner told what
their lines hold, who may move money between lines
under <your delegation of authority> , and when the
budget is read against the results
owner: budget-keeper after: issue-budget
automation: <level>
record-assumptions - convenes debrief: what the budget rests on, such as
the assumptions, the gaps the executive team
accepted and the drafts sent back, and what the
next budget checks first
owner: planning-analyst after: tell-owners
automation: <level>
run-scoped:
timeline - runs roll-call owner: planning-analyst
every: <cadence>
from: open-budget until: approve-budget
drafts - runs collect-and-report owner: planning-analyst
from: issue-instructions until: check-drafts
handoffs:
open-budget -> take-in-targets / list-commitments [budget-scope]: the
year, the calendar, the approvers and the targets at their version
take-in-targets -> propose-assumptions [company-targets]: the year's
targets, each with its source in the long-range plan
propose-assumptions -> agree-assumptions [proposed-assumptions]: each
assumption with its source, and the estimates marked
agree-assumptions -> issue-instructions [agreed-assumptions]: the
assumptions as the CFO agreed them, at a version
list-commitments -> issue-instructions [committed-money]: each
commitment by budget line, with its term and the agreement behind it
issue-instructions -> take-in-labor-cost / draft-budgets
[budget-instructions]: the calendar, the assumptions, the template,
the committed money and each department's labor cost to check against
take-in-labor-cost -> check-drafts [labor-cost]: each team's headcount
and labor cost, at the workforce plan's version
draft-budgets -> check-drafts [department-drafts]: each department's
draft at a version, with the reason for each line
check-drafts -> put-together [checked-drafts]: each draft marked
complete and agreeing, with the name of who checked it
put-together -> test-targets [combined-budget]: the company's figures
for the year, by month and by entity
test-targets -> build-options [target-gaps]: the gap to each target,
with the lines that make it up
build-options -> put-trade-offs [budget-options]: two or three options,
each with its figures and what it gives up
put-trade-offs -> settle-trade-offs [options-briefed]: the options as
the executive team saw them, with their evidence
settle-trade-offs -> approve-budget [trade-off-decision]: the option
chosen, the gaps accepted, and who disagreed and why
approve-budget -> issue-budget [approved-budget]: the budget as
approved, with the names of the approvers. A change to any line voids
the approval
issue-budget -> tell-owners [issued-budget]: the budget at its version,
and the date it was issued
tell-owners -> record-assumptions [owners-told]: each budget owner told,
and the questions they raised
deviations:
agree-assumptions -> propose-assumptions [assumption-not-agreed]: the
CFO will not agree an assumption, so it is proposed again with the
source or the range the CFO asked for
check-drafts -> draft-budgets [draft-outside-instructions]: a draft is
incomplete, off the agreed assumptions or out of line with the
workforce plan, so it goes back to its department head with each gap
named
test-targets -> draft-budgets [gap-too-wide]: the gap to the targets is
wider than any option could close, so the department heads draft again
against a figure the CFO sets for each department
settle-trade-offs -> build-options [every-option-rejected]: the
executive team rejects every option, so new options are built and the
rejected ones are kept with the reason
approve-budget -> settle-trade-offs [approvers-refuse]: the approvers
will not approve, so the trade-offs are settled again on the lines the
approvers named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the head of financial
planning, the chief executive, the executive team, the
department heads and each budget approver>
systems: <your financial planning system> (write), <your general
ledger> (read), <your budget record> (write), the workforce
plan (read), the contract record (read), <your decision
record> (write), the document store (write), the notification
channel (write)
data: <your long-range plan> <version> , the company's targets
<version> , the agreed assumptions <version> , <your budget
template> <version> , <your delegation of authority> <version> ,
the workforce plan <version> , <your accounting framework> for
how each figure is stated
policy:
every figure traces to an agreed assumption, a signed commitment, the
approved workforce plan or a department head's draft with its reason,
and a figure with no source is marked as an estimate
the labor cost is the approved workforce plan's at its version, and the
budget builds no second headcount plan
the trade-offs are settled by the executive team and the budget is
approved by <the approvers your delegation of authority names> in a
recorded decision, and an agent never approves a budget
the people who prepare the budget, such as <your head of financial
planning role>, are never among its approvers
no money is committed against a line of the new budget before the
budget is issued at its version, except under <your rule for spending
before a budget is approved>
a change to the issued budget makes a new version, approved the same
way, and the version it replaces stays where it was
a department that divides its share among its own functions does so
inside the total the issued budget gives it
each entity is budgeted in its own currency and stated under <your
accounting framework>, and the group figures use the agreed exchange
rates
measures:
cycle time: <weeks> from the targets to the issued budget
accuracy: the year's operating result against the budget, line by line
volume: <rounds of drafts per budget>
quality gate: every line traces to an assumption, a commitment, the
workforce plan or a draft with its reason, and the budget
carries one version
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
358 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: set the annual budget id: <team>/set-the-annual-budget v1
from: ref/fin/set-the-annual-budget v1
owner: <who> effective: <date>
trigger: the executive team sets the company's targets for the next
financial year from the first year of <your long-range plan>,
and <your CFO role> opens the budget on <your finance calendar>
watch: record=<company targets for the year>
system=<your financial planning system>
change=<the targets for the next financial year are set>
concurrency: one run per financial year - a change to the issued budget
during the year is its own run that starts from the issued
budget and replaces it at a new version, approved by the
same people, and a reforecast never changes the budget
goal: one budget for the financial year at one version, approved by <the
approvers your delegation of authority names> by <date>, with every
line built on the agreed assumptions, the labor cost taken from the
approved workforce plan, every gap to the company's targets closed
or accepted in a recorded decision, and every budget owner told what
their lines hold
phases:
open-budget - human: the financial year the budget covers, the
calendar of due dates, the people who approve it
and the targets it is built from
owner: planning-analyst after: trigger
automation: <level>
take-in-targets - runs collect-and-report: the company's targets for
the year, such as revenue, operating result, cash
and headcount, from the first year of <your
long-range plan> at its version
owner: planning-analyst after: open-budget
automation: <level>
propose-assumptions - runs assessment: the prices, the growth, the pay
increases, inflation and the exchange rates the
drafts will use, each with its source, and any
figure with no source marked as an estimate
owner: planning-analyst
after: take-in-targets automation: <level>
agree-assumptions - convenes decide-and-announce: <your CFO role>
agrees the assumptions every draft is built on,
and a change to one later reopens every draft it
touches
owner: <your CFO role>
after: propose-assumptions by: <days>
automation: never
list-commitments - runs collect-and-report: every agreement signed in
an earlier year that commits money in this one,
such as a lease, a subscription or a contract for
several years, by budget line and with its term
owner: budget-keeper after: open-budget
automation: <level>
issue-instructions - convenes briefing: each department head given the
calendar, the agreed assumptions, <your budget
template>, the money already committed to the
department, and the labor cost the department's
part of the workforce plan is checked against
owner: planning-analyst
after: agree-assumptions + list-commitments
automation: <level>
take-in-labor-cost - runs collect-and-report: each team's headcount,
start dates and labor cost from the workforce plan
approved at ref/hr/plan-the-workforce, at its
version
owner: workforce-planner
after: issue-instructions automation: <level>
draft-budgets - human: each department head's budget for the year,
with its costs, any income the department earns,
the reason for each line and the target each line
serves
owner: <your department head role>
after: issue-instructions by: <weeks>
automation: never
check-drafts - runs assessment: each draft checked as complete,
built on the agreed assumptions, carrying the money
already committed and agreeing with the workforce
plan's labor cost, with each gap named and sent back
to its department head
owner: planning-analyst
after: draft-budgets + take-in-labor-cost
automation: <level>
put-together - system: the drafts combined into the company's
income, costs, cash and balance sheet for the year
in <your financial planning system>, by month and
by entity, in each entity's currency at the agreed
exchange rates
owner: planning-analyst after: check-drafts
automation: <level>
test-targets - runs assessment: the combined budget set beside
each of the company's targets, with the gap on
each line and the departments that make it up
owner: planning-analyst after: put-together
automation: <level>
build-options - human: two or three ways to close the gap, each
with its figures by department and what it gives
up against the targets
owner: planning-analyst after: test-targets
automation: <level>
put-trade-offs - convenes briefing: the options put to the
executive team, with the evidence behind each
figure and what each one gives up
owner: decision-coordinator
after: build-options automation: <level>
settle-trade-offs - convenes decide-and-announce: the executive team
chooses one option, and the decision is recorded
with who disagreed and why
owner: <your chief executive role>
after: put-trade-offs by: <date>
automation: never
approve-budget - convenes approval: <the approvers your delegation
of authority names for the budget, such as the
board> approve the budget at its version as named
approvers, and the decision-coordinator agent
records the approval
owner: <your budget approver role>
after: settle-trade-offs by: <date>
automation: never
issue-budget - system: the approved budget loaded to <your budget
record> at one version, with one line for each
budget owner, phased by month
owner: budget-keeper after: approve-budget
automation: <level>
tell-owners - convenes briefing: each budget owner told what
their lines hold, who may move money between lines
under <your delegation of authority>, and when the
budget is read against the results
owner: budget-keeper after: issue-budget
automation: <level>
record-assumptions - convenes debrief: what the budget rests on, such as
the assumptions, the gaps the executive team
accepted and the drafts sent back, and what the
next budget checks first
owner: planning-analyst after: tell-owners
automation: <level>
run-scoped:
timeline - runs roll-call owner: planning-analyst
every: <cadence>
from: open-budget until: approve-budget
drafts - runs collect-and-report owner: planning-analyst
from: issue-instructions until: check-drafts
handoffs:
open-budget -> take-in-targets / list-commitments [budget-scope]: the
year, the calendar, the approvers and the targets at their version
take-in-targets -> propose-assumptions [company-targets]: the year's
targets, each with its source in the long-range plan
propose-assumptions -> agree-assumptions [proposed-assumptions]: each
assumption with its source, and the estimates marked
agree-assumptions -> issue-instructions [agreed-assumptions]: the
assumptions as the CFO agreed them, at a version
list-commitments -> issue-instructions [committed-money]: each
commitment by budget line, with its term and the agreement behind it
issue-instructions -> take-in-labor-cost / draft-budgets
[budget-instructions]: the calendar, the assumptions, the template,
the committed money and each department's labor cost to check against
take-in-labor-cost -> check-drafts [labor-cost]: each team's headcount
and labor cost, at the workforce plan's version
draft-budgets -> check-drafts [department-drafts]: each department's
draft at a version, with the reason for each line
check-drafts -> put-together [checked-drafts]: each draft marked
complete and agreeing, with the name of who checked it
put-together -> test-targets [combined-budget]: the company's figures
for the year, by month and by entity
test-targets -> build-options [target-gaps]: the gap to each target,
with the lines that make it up
build-options -> put-trade-offs [budget-options]: two or three options,
each with its figures and what it gives up
put-trade-offs -> settle-trade-offs [options-briefed]: the options as
the executive team saw them, with their evidence
settle-trade-offs -> approve-budget [trade-off-decision]: the option
chosen, the gaps accepted, and who disagreed and why
approve-budget -> issue-budget [approved-budget]: the budget as
approved, with the names of the approvers. A change to any line voids
the approval
issue-budget -> tell-owners [issued-budget]: the budget at its version,
and the date it was issued
tell-owners -> record-assumptions [owners-told]: each budget owner told,
and the questions they raised
deviations:
agree-assumptions -> propose-assumptions [assumption-not-agreed]: the
CFO will not agree an assumption, so it is proposed again with the
source or the range the CFO asked for
check-drafts -> draft-budgets [draft-outside-instructions]: a draft is
incomplete, off the agreed assumptions or out of line with the
workforce plan, so it goes back to its department head with each gap
named
test-targets -> draft-budgets [gap-too-wide]: the gap to the targets is
wider than any option could close, so the department heads draft again
against a figure the CFO sets for each department
settle-trade-offs -> build-options [every-option-rejected]: the
executive team rejects every option, so new options are built and the
rejected ones are kept with the reason
approve-budget -> settle-trade-offs [approvers-refuse]: the approvers
will not approve, so the trade-offs are settled again on the lines the
approvers named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the head of financial
planning, the chief executive, the executive team, the
department heads and each budget approver>
systems: <your financial planning system> (write), <your general
ledger> (read), <your budget record> (write), the workforce
plan (read), the contract record (read), <your decision
record> (write), the document store (write), the notification
channel (write)
data: <your long-range plan> <version>, the company's targets
<version>, the agreed assumptions <version>, <your budget
template> <version>, <your delegation of authority> <version>,
the workforce plan <version>, <your accounting framework> for
how each figure is stated
policy:
every figure traces to an agreed assumption, a signed commitment, the
approved workforce plan or a department head's draft with its reason,
and a figure with no source is marked as an estimate
the labor cost is the approved workforce plan's at its version, and the
budget builds no second headcount plan
the trade-offs are settled by the executive team and the budget is
approved by <the approvers your delegation of authority names> in a
recorded decision, and an agent never approves a budget
the people who prepare the budget, such as <your head of financial
planning role>, are never among its approvers
no money is committed against a line of the new budget before the
budget is issued at its version, except under <your rule for spending
before a budget is approved>
a change to the issued budget makes a new version, approved the same
way, and the version it replaces stays where it was
a department that divides its share among its own functions does so
inside the total the issued budget gives it
each entity is budgeted in its own currency and stated under <your
accounting framework>, and the group figures use the agreed exchange
rates
measures:
cycle time: <weeks> from the targets to the issued budget
accuracy: the year's operating result against the budget, line by line
volume: <rounds of drafts per budget>
quality gate: every line traces to an assumption, a commitment, the
workforce plan or a draft with its reason, and the budget
carries one version
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
413 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: set the annual budget id: <team>/set-the-annual-budget v1
from: ref/fin/set-the-annual-budget v1
owner: <who> effective: <date>
trigger: the executive team sets the company's targets for the next
financial year from the first year of <your long-range plan>,
and <your CFO role> opens the budget on <your finance calendar>
watch: record=<company targets for the year>
system=<your financial planning system>
change=<the targets for the next financial year are set>
concurrency: one run per financial year - a change to the issued budget
during the year is its own run that starts from the issued
budget and replaces it at a new version, approved by the
same people, and a reforecast never changes the budget
goal: one budget for the financial year at one version, approved by <the
approvers your delegation of authority names> by <date>, with every
line built on the agreed assumptions, the labor cost taken from the
approved workforce plan, every gap to the company's targets closed
or accepted in a recorded decision, and every budget owner told what
their lines hold
phases:
open-budget - human: the financial year the budget covers, the
calendar of due dates, the people who approve it
and the targets it is built from
owner: planning-analyst after: trigger
automation: <level>
take-in-targets - runs collect-and-report: the company's targets for
the year, such as revenue, operating result, cash
and headcount, from the first year of <your
long-range plan> at its version
owner: planning-analyst after: open-budget
automation: <level>
propose-assumptions - runs assessment: the prices, the growth, the pay
increases, inflation and the exchange rates the
drafts will use, each with its source, and any
figure with no source marked as an estimate
owner: planning-analyst
after: take-in-targets automation: <level>
agree-assumptions - convenes decide-and-announce: <your CFO role>
agrees the assumptions every draft is built on,
and a change to one later reopens every draft it
touches
owner: <your CFO role>
after: propose-assumptions by: <days>
automation: never
list-commitments - runs collect-and-report: every agreement signed in
an earlier year that commits money in this one,
such as a lease, a subscription or a contract for
several years, by budget line and with its term
owner: budget-keeper after: open-budget
automation: <level>
issue-instructions - convenes briefing: each department head given the
calendar, the agreed assumptions, <your budget
template>, the money already committed to the
department, and the labor cost the department's
part of the workforce plan is checked against
owner: planning-analyst
after: agree-assumptions + list-commitments
automation: <level>
take-in-labor-cost - runs collect-and-report: each team's headcount,
start dates and labor cost from the workforce plan
approved at ref/hr/plan-the-workforce, at its
version
owner: workforce-planner
after: issue-instructions automation: <level>
draft-budgets - human: each department head's budget for the year,
with its costs, any income the department earns,
the reason for each line and the target each line
serves
owner: <your department head role>
after: issue-instructions by: <weeks>
automation: never
check-drafts - runs assessment: each draft checked as complete,
built on the agreed assumptions, carrying the money
already committed and agreeing with the workforce
plan's labor cost, with each gap named and sent back
to its department head
owner: planning-analyst
after: draft-budgets + take-in-labor-cost
automation: <level>
put-together - system: the drafts combined into the company's
income, costs, cash and balance sheet for the year
in <your financial planning system>, by month and
by entity, in each entity's currency at the agreed
exchange rates
owner: planning-analyst after: check-drafts
automation: <level>
test-targets - runs assessment: the combined budget set beside
each of the company's targets, with the gap on
each line and the departments that make it up
owner: planning-analyst after: put-together
automation: <level>
build-options - human: two or three ways to close the gap, each
with its figures by department and what it gives
up against the targets
owner: planning-analyst after: test-targets
automation: <level>
put-trade-offs - convenes briefing: the options put to the
executive team, with the evidence behind each
figure and what each one gives up
owner: decision-coordinator
after: build-options automation: <level>
settle-trade-offs - convenes decide-and-announce: the executive team
chooses one option, and the decision is recorded
with who disagreed and why
owner: <your chief executive role>
after: put-trade-offs by: <date>
automation: never
approve-budget - convenes approval: <the approvers your delegation
of authority names for the budget, such as the
board> approve the budget at its version as named
approvers, and the decision-coordinator agent
records the approval
owner: <your budget approver role>
after: settle-trade-offs by: <date>
automation: never
issue-budget - system: the approved budget loaded to <your budget
record> at one version, with one line for each
budget owner, phased by month
owner: budget-keeper after: approve-budget
automation: <level>
tell-owners - convenes briefing: each budget owner told what
their lines hold, who may move money between lines
under <your delegation of authority>, and when the
budget is read against the results
owner: budget-keeper after: issue-budget
automation: <level>
record-assumptions - convenes debrief: what the budget rests on, such as
the assumptions, the gaps the executive team
accepted and the drafts sent back, and what the
next budget checks first
owner: planning-analyst after: tell-owners
automation: <level>
run-scoped:
timeline - runs roll-call owner: planning-analyst
every: <cadence>
from: open-budget until: approve-budget
drafts - runs collect-and-report owner: planning-analyst
from: issue-instructions until: check-drafts
handoffs:
open-budget -> take-in-targets / list-commitments [budget-scope]: the
year, the calendar, the approvers and the targets at their version
take-in-targets -> propose-assumptions [company-targets]: the year's
targets, each with its source in the long-range plan
propose-assumptions -> agree-assumptions [proposed-assumptions]: each
assumption with its source, and the estimates marked
agree-assumptions -> issue-instructions [agreed-assumptions]: the
assumptions as the CFO agreed them, at a version
list-commitments -> issue-instructions [committed-money]: each
commitment by budget line, with its term and the agreement behind it
issue-instructions -> take-in-labor-cost / draft-budgets
[budget-instructions]: the calendar, the assumptions, the template,
the committed money and each department's labor cost to check against
take-in-labor-cost -> check-drafts [labor-cost]: each team's headcount
and labor cost, at the workforce plan's version
draft-budgets -> check-drafts [department-drafts]: each department's
draft at a version, with the reason for each line
check-drafts -> put-together [checked-drafts]: each draft marked
complete and agreeing, with the name of who checked it
put-together -> test-targets [combined-budget]: the company's figures
for the year, by month and by entity
test-targets -> build-options [target-gaps]: the gap to each target,
with the lines that make it up
build-options -> put-trade-offs [budget-options]: two or three options,
each with its figures and what it gives up
put-trade-offs -> settle-trade-offs [options-briefed]: the options as
the executive team saw them, with their evidence
settle-trade-offs -> approve-budget [trade-off-decision]: the option
chosen, the gaps accepted, and who disagreed and why
approve-budget -> issue-budget [approved-budget]: the budget as
approved, with the names of the approvers. A change to any line voids
the approval
issue-budget -> tell-owners [issued-budget]: the budget at its version,
and the date it was issued
tell-owners -> record-assumptions [owners-told]: each budget owner told,
and the questions they raised
deviations:
agree-assumptions -> propose-assumptions [assumption-not-agreed]: the
CFO will not agree an assumption, so it is proposed again with the
source or the range the CFO asked for
check-drafts -> draft-budgets [draft-outside-instructions]: a draft is
incomplete, off the agreed assumptions or out of line with the
workforce plan, so it goes back to its department head with each gap
named
test-targets -> draft-budgets [gap-too-wide]: the gap to the targets is
wider than any option could close, so the department heads draft again
against a figure the CFO sets for each department
settle-trade-offs -> build-options [every-option-rejected]: the
executive team rejects every option, so new options are built and the
rejected ones are kept with the reason
approve-budget -> settle-trade-offs [approvers-refuse]: the approvers
will not approve, so the trade-offs are settled again on the lines the
approvers named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the head of financial
planning, the chief executive, the executive team, the
department heads and each budget approver>
systems: <your financial planning system> (write), <your general
ledger> (read), <your budget record> (write), the workforce
plan (read), the contract record (read), <your decision
record> (write), the document store (write), the notification
channel (write)
data: <your long-range plan> <version>, the company's targets
<version>, the agreed assumptions <version>, <your budget
template> <version>, <your delegation of authority> <version>,
the workforce plan <version>, <your accounting framework> for
how each figure is stated
policy:
every figure traces to an agreed assumption, a signed commitment, the
approved workforce plan or a department head's draft with its reason,
and a figure with no source is marked as an estimate
the labor cost is the approved workforce plan's at its version, and the
budget builds no second headcount plan
the trade-offs are settled by the executive team and the budget is
approved by <the approvers your delegation of authority names> in a
recorded decision, and an agent never approves a budget
the people who prepare the budget, such as <your head of financial
planning role>, are never among its approvers
no money is committed against a line of the new budget before the
budget is issued at its version, except under <your rule for spending
before a budget is approved>
a change to the issued budget makes a new version, approved the same
way, and the version it replaces stays where it was
a department that divides its share among its own functions does so
inside the total the issued budget gives it
each entity is budgeted in its own currency and stated under <your
accounting framework>, and the group figures use the agreed exchange
rates
measures:
cycle time: <weeks> from the targets to the issued budget
accuracy: the year's operating result against the budget, line by line
volume: <rounds of drafts per budget>
quality gate: every line traces to an assumption, a commitment, the
workforce plan or a draft with its reason, and the budget
carries one version
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
418 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: set the annual budget id: <team>/set-the-annual-budget v1
from: ref/fin/set-the-annual-budget v1
owner: <who> effective: <date>
trigger: the executive team sets the company's targets for the next
financial year from the first year of <your long-range plan>,
and <your CFO role> opens the budget on <your finance calendar>
watch: record=<company targets for the year>
system=<your financial planning system>
change=<the targets for the next financial year are set>
concurrency: one run per financial year - a change to the issued budget
during the year is its own run that starts from the issued
budget and replaces it at a new version, approved by the
same people, and a reforecast never changes the budget
goal: one budget for the financial year at one version, approved by <the
approvers your delegation of authority names> by <date>, with every
line built on the agreed assumptions, the labor cost taken from the
approved workforce plan, every gap to the company's targets closed
or accepted in a recorded decision, and every budget owner told what
their lines hold
phases:
open-budget - human: the financial year the budget covers, the
calendar of due dates, the people who approve it
and the targets it is built from
owner: planning-analyst after: trigger
automation: <level>
take-in-targets - runs collect-and-report: the company's targets for
the year, such as revenue, operating result, cash
and headcount, from the first year of <your
long-range plan> at its version
owner: planning-analyst after: open-budget
automation: <level>
propose-assumptions - runs assessment: the prices, the growth, the pay
increases, inflation and the exchange rates the
drafts will use, each with its source, and any
figure with no source marked as an estimate
owner: planning-analyst
after: take-in-targets automation: <level>
agree-assumptions - convenes decide-and-announce: <your CFO role>
agrees the assumptions every draft is built on,
and a change to one later reopens every draft it
touches
owner: <your CFO role>
after: propose-assumptions by: <days>
automation: never
list-commitments - runs collect-and-report: every agreement signed in
an earlier year that commits money in this one,
such as a lease, a subscription or a contract for
several years, by budget line and with its term
owner: budget-keeper after: open-budget
automation: <level>
issue-instructions - convenes briefing: each department head given the
calendar, the agreed assumptions, <your budget
template>, the money already committed to the
department, and the labor cost the department's
part of the workforce plan is checked against
owner: planning-analyst
after: agree-assumptions + list-commitments
automation: <level>
take-in-labor-cost - runs collect-and-report: each team's headcount,
start dates and labor cost from the workforce plan
approved at ref/hr/plan-the-workforce, at its
version
owner: workforce-planner
after: issue-instructions automation: <level>
draft-budgets - human: each department head's budget for the year,
with its costs, any income the department earns,
the reason for each line and the target each line
serves
owner: <your department head role>
after: issue-instructions by: <weeks>
automation: never
check-drafts - runs assessment: each draft checked as complete,
built on the agreed assumptions, carrying the money
already committed and agreeing with the workforce
plan's labor cost, with each gap named and sent back
to its department head
owner: planning-analyst
after: draft-budgets + take-in-labor-cost
automation: <level>
put-together - system: the drafts combined into the company's
income, costs, cash and balance sheet for the year
in <your financial planning system>, by month and
by entity, in each entity's currency at the agreed
exchange rates
owner: planning-analyst after: check-drafts
automation: <level>
test-targets - runs assessment: the combined budget set beside
each of the company's targets, with the gap on
each line and the departments that make it up
owner: planning-analyst after: put-together
automation: <level>
build-options - human: two or three ways to close the gap, each
with its figures by department and what it gives
up against the targets
owner: planning-analyst after: test-targets
automation: <level>
put-trade-offs - convenes briefing: the options put to the
executive team, with the evidence behind each
figure and what each one gives up
owner: decision-coordinator
after: build-options automation: <level>
settle-trade-offs - convenes decide-and-announce: the executive team
chooses one option, and the decision is recorded
with who disagreed and why
owner: <your chief executive role>
after: put-trade-offs by: <date>
automation: never
approve-budget - convenes approval: <the approvers your delegation
of authority names for the budget, such as the
board> approve the budget at its version as named
approvers, and the decision-coordinator agent
records the approval
owner: <your budget approver role>
after: settle-trade-offs by: <date>
automation: never
issue-budget - system: the approved budget loaded to <your budget
record> at one version, with one line for each
budget owner, phased by month
owner: budget-keeper after: approve-budget
automation: <level>
tell-owners - convenes briefing: each budget owner told what
their lines hold, who may move money between lines
under <your delegation of authority>, and when the
budget is read against the results
owner: budget-keeper after: issue-budget
automation: <level>
record-assumptions - convenes debrief: what the budget rests on, such as
the assumptions, the gaps the executive team
accepted and the drafts sent back, and what the
next budget checks first
owner: planning-analyst after: tell-owners
automation: <level>
run-scoped:
timeline - runs roll-call owner: planning-analyst
every: <cadence>
from: open-budget until: approve-budget
drafts - runs collect-and-report owner: planning-analyst
from: issue-instructions until: check-drafts
handoffs:
open-budget -> take-in-targets / list-commitments [budget-scope]: the
year, the calendar, the approvers and the targets at their version
take-in-targets -> propose-assumptions [company-targets]: the year's
targets, each with its source in the long-range plan
propose-assumptions -> agree-assumptions [proposed-assumptions]: each
assumption with its source, and the estimates marked
agree-assumptions -> issue-instructions [agreed-assumptions]: the
assumptions as the CFO agreed them, at a version
list-commitments -> issue-instructions [committed-money]: each
commitment by budget line, with its term and the agreement behind it
issue-instructions -> take-in-labor-cost / draft-budgets
[budget-instructions]: the calendar, the assumptions, the template,
the committed money and each department's labor cost to check against
take-in-labor-cost -> check-drafts [labor-cost]: each team's headcount
and labor cost, at the workforce plan's version
draft-budgets -> check-drafts [department-drafts]: each department's
draft at a version, with the reason for each line
check-drafts -> put-together [checked-drafts]: each draft marked
complete and agreeing, with the name of who checked it
put-together -> test-targets [combined-budget]: the company's figures
for the year, by month and by entity
test-targets -> build-options [target-gaps]: the gap to each target,
with the lines that make it up
build-options -> put-trade-offs [budget-options]: two or three options,
each with its figures and what it gives up
put-trade-offs -> settle-trade-offs [options-briefed]: the options as
the executive team saw them, with their evidence
settle-trade-offs -> approve-budget [trade-off-decision]: the option
chosen, the gaps accepted, and who disagreed and why
approve-budget -> issue-budget [approved-budget]: the budget as
approved, with the names of the approvers. A change to any line voids
the approval
issue-budget -> tell-owners [issued-budget]: the budget at its version,
and the date it was issued
tell-owners -> record-assumptions [owners-told]: each budget owner told,
and the questions they raised
deviations:
agree-assumptions -> propose-assumptions [assumption-not-agreed]: the
CFO will not agree an assumption, so it is proposed again with the
source or the range the CFO asked for
check-drafts -> draft-budgets [draft-outside-instructions]: a draft is
incomplete, off the agreed assumptions or out of line with the
workforce plan, so it goes back to its department head with each gap
named
test-targets -> draft-budgets [gap-too-wide]: the gap to the targets is
wider than any option could close, so the department heads draft again
against a figure the CFO sets for each department
settle-trade-offs -> build-options [every-option-rejected]: the
executive team rejects every option, so new options are built and the
rejected ones are kept with the reason
approve-budget -> settle-trade-offs [approvers-refuse]: the approvers
will not approve, so the trade-offs are settled again on the lines the
approvers named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the head of financial
planning, the chief executive, the executive team, the
department heads and each budget approver>
systems: <your financial planning system> (write), <your general
ledger> (read), <your budget record> (write), the workforce
plan (read), the contract record (read), <your decision
record> (write), the document store (write), the notification
channel (write)
data: <your long-range plan> <version>, the company's targets
<version>, the agreed assumptions <version>, <your budget
template> <version>, <your delegation of authority> <version>,
the workforce plan <version>, <your accounting framework> for
how each figure is stated
policy:
every figure traces to an agreed assumption, a signed commitment, the
approved workforce plan or a department head's draft with its reason,
and a figure with no source is marked as an estimate
the labor cost is the approved workforce plan's at its version, and the
budget builds no second headcount plan
the trade-offs are settled by the executive team and the budget is
approved by <the approvers your delegation of authority names> in a
recorded decision, and an agent never approves a budget
the people who prepare the budget, such as <your head of financial
planning role>, are never among its approvers
no money is committed against a line of the new budget before the
budget is issued at its version, except under <your rule for spending
before a budget is approved>
a change to the issued budget makes a new version, approved the same
way, and the version it replaces stays where it was
a department that divides its share among its own functions does so
inside the total the issued budget gives it
each entity is budgeted in its own currency and stated under <your
accounting framework>, and the group figures use the agreed exchange
rates
measures:
cycle time: <weeks> from the targets to the issued budget
accuracy: the year's operating result against the budget, line by line
volume: <rounds of drafts per budget>
quality gate: every line traces to an assumption, a commitment, the
workforce plan or a draft with its reason, and the budget
carries one version
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
409 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: set the annual budget id: <team>/set-the-annual-budget v1
from: ref/fin/set-the-annual-budget v1
owner: <who> effective: <date>
trigger: the executive team sets the company's targets for the next
financial year from the first year of <your long-range plan>,
and <your CFO role> opens the budget on <your finance calendar>
watch: record=<company targets for the year>
system=<your financial planning system>
change=<the targets for the next financial year are set>
concurrency: one run per financial year - a change to the issued budget
during the year is its own run that starts from the issued
budget and replaces it at a new version, approved by the
same people, and a reforecast never changes the budget
goal: one budget for the financial year at one version, approved by <the
approvers your delegation of authority names> by <date>, with every
line built on the agreed assumptions, the labor cost taken from the
approved workforce plan, every gap to the company's targets closed
or accepted in a recorded decision, and every budget owner told what
their lines hold
phases:
open-budget - human: the financial year the budget covers, the
calendar of due dates, the people who approve it
and the targets it is built from
owner: planning-analyst after: trigger
automation: <level>
take-in-targets - runs collect-and-report: the company's targets for
the year, such as revenue, operating result, cash
and headcount, from the first year of <your
long-range plan> at its version
owner: planning-analyst after: open-budget
automation: <level>
propose-assumptions - runs assessment: the prices, the growth, the pay
increases, inflation and the exchange rates the
drafts will use, each with its source, and any
figure with no source marked as an estimate
owner: planning-analyst
after: take-in-targets automation: <level>
agree-assumptions - convenes decide-and-announce: <your CFO role>
agrees the assumptions every draft is built on,
and a change to one later reopens every draft it
touches
owner: <your CFO role>
after: propose-assumptions by: <days>
automation: never
list-commitments - runs collect-and-report: every agreement signed in
an earlier year that commits money in this one,
such as a lease, a subscription or a contract for
several years, by budget line and with its term
owner: budget-keeper after: open-budget
automation: <level>
issue-instructions - convenes briefing: each department head given the
calendar, the agreed assumptions, <your budget
template>, the money already committed to the
department, and the labor cost the department's
part of the workforce plan is checked against
owner: planning-analyst
after: agree-assumptions + list-commitments
automation: <level>
take-in-labor-cost - runs collect-and-report: each team's headcount,
start dates and labor cost from the workforce plan
approved at ref/hr/plan-the-workforce, at its
version
owner: workforce-planner
after: issue-instructions automation: <level>
draft-budgets - human: each department head's budget for the year,
with its costs, any income the department earns,
the reason for each line and the target each line
serves
owner: <your department head role>
after: issue-instructions by: <weeks>
automation: never
check-drafts - runs assessment: each draft checked as complete,
built on the agreed assumptions, carrying the money
already committed and agreeing with the workforce
plan's labor cost, with each gap named and sent back
to its department head
owner: planning-analyst
after: draft-budgets + take-in-labor-cost
automation: <level>
put-together - system: the drafts combined into the company's
income, costs, cash and balance sheet for the year
in <your financial planning system>, by month and
by entity, in each entity's currency at the agreed
exchange rates
owner: planning-analyst after: check-drafts
automation: <level>
test-targets - runs assessment: the combined budget set beside
each of the company's targets, with the gap on
each line and the departments that make it up
owner: planning-analyst after: put-together
automation: <level>
build-options - human: two or three ways to close the gap, each
with its figures by department and what it gives
up against the targets
owner: planning-analyst after: test-targets
automation: <level>
put-trade-offs - convenes briefing: the options put to the
executive team, with the evidence behind each
figure and what each one gives up
owner: decision-coordinator
after: build-options automation: <level>
settle-trade-offs - convenes decide-and-announce: the executive team
chooses one option, and the decision is recorded
with who disagreed and why
owner: <your chief executive role>
after: put-trade-offs by: <date>
automation: never
approve-budget - convenes approval: <the approvers your delegation
of authority names for the budget, such as the
board> approve the budget at its version as named
approvers, and the decision-coordinator agent
records the approval
owner: <your budget approver role>
after: settle-trade-offs by: <date>
automation: never
issue-budget - system: the approved budget loaded to <your budget
record> at one version, with one line for each
budget owner, phased by month
owner: budget-keeper after: approve-budget
automation: <level>
tell-owners - convenes briefing: each budget owner told what
their lines hold, who may move money between lines
under <your delegation of authority>, and when the
budget is read against the results
owner: budget-keeper after: issue-budget
automation: <level>
record-assumptions - convenes debrief: what the budget rests on, such as
the assumptions, the gaps the executive team
accepted and the drafts sent back, and what the
next budget checks first
owner: planning-analyst after: tell-owners
automation: <level>
run-scoped:
timeline - runs roll-call owner: planning-analyst
every: <cadence>
from: open-budget until: approve-budget
drafts - runs collect-and-report owner: planning-analyst
from: issue-instructions until: check-drafts
handoffs:
open-budget -> take-in-targets / list-commitments [budget-scope]: the
year, the calendar, the approvers and the targets at their version
take-in-targets -> propose-assumptions [company-targets]: the year's
targets, each with its source in the long-range plan
propose-assumptions -> agree-assumptions [proposed-assumptions]: each
assumption with its source, and the estimates marked
agree-assumptions -> issue-instructions [agreed-assumptions]: the
assumptions as the CFO agreed them, at a version
list-commitments -> issue-instructions [committed-money]: each
commitment by budget line, with its term and the agreement behind it
issue-instructions -> take-in-labor-cost / draft-budgets
[budget-instructions]: the calendar, the assumptions, the template,
the committed money and each department's labor cost to check against
take-in-labor-cost -> check-drafts [labor-cost]: each team's headcount
and labor cost, at the workforce plan's version
draft-budgets -> check-drafts [department-drafts]: each department's
draft at a version, with the reason for each line
check-drafts -> put-together [checked-drafts]: each draft marked
complete and agreeing, with the name of who checked it
put-together -> test-targets [combined-budget]: the company's figures
for the year, by month and by entity
test-targets -> build-options [target-gaps]: the gap to each target,
with the lines that make it up
build-options -> put-trade-offs [budget-options]: two or three options,
each with its figures and what it gives up
put-trade-offs -> settle-trade-offs [options-briefed]: the options as
the executive team saw them, with their evidence
settle-trade-offs -> approve-budget [trade-off-decision]: the option
chosen, the gaps accepted, and who disagreed and why
approve-budget -> issue-budget [approved-budget]: the budget as
approved, with the names of the approvers. A change to any line voids
the approval
issue-budget -> tell-owners [issued-budget]: the budget at its version,
and the date it was issued
tell-owners -> record-assumptions [owners-told]: each budget owner told,
and the questions they raised
deviations:
agree-assumptions -> propose-assumptions [assumption-not-agreed]: the
CFO will not agree an assumption, so it is proposed again with the
source or the range the CFO asked for
check-drafts -> draft-budgets [draft-outside-instructions]: a draft is
incomplete, off the agreed assumptions or out of line with the
workforce plan, so it goes back to its department head with each gap
named
test-targets -> draft-budgets [gap-too-wide]: the gap to the targets is
wider than any option could close, so the department heads draft again
against a figure the CFO sets for each department
settle-trade-offs -> build-options [every-option-rejected]: the
executive team rejects every option, so new options are built and the
rejected ones are kept with the reason
approve-budget -> settle-trade-offs [approvers-refuse]: the approvers
will not approve, so the trade-offs are settled again on the lines the
approvers named
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the CFO, the head of financial
planning, the chief executive, the executive team, the
department heads and each budget approver>
systems: <your financial planning system> (write), <your general
ledger> (read), <your budget record> (write), the workforce
plan (read), the contract record (read), <your decision
record> (write), the document store (write), the notification
channel (write)
data: <your long-range plan> <version>, the company's targets
<version>, the agreed assumptions <version>, <your budget
template> <version>, <your delegation of authority> <version>,
the workforce plan <version>, <your accounting framework> for
how each figure is stated
policy:
every figure traces to an agreed assumption, a signed commitment, the
approved workforce plan or a department head's draft with its reason,
and a figure with no source is marked as an estimate
the labor cost is the approved workforce plan's at its version, and the
budget builds no second headcount plan
the trade-offs are settled by the executive team and the budget is
approved by <the approvers your delegation of authority names> in a
recorded decision, and an agent never approves a budget
the people who prepare the budget, such as <your head of financial
planning role>, are never among its approvers
no money is committed against a line of the new budget before the
budget is issued at its version, except under <your rule for spending
before a budget is approved>
a change to the issued budget makes a new version, approved the same
way, and the version it replaces stays where it was
a department that divides its share among its own functions does so
inside the total the issued budget gives it
each entity is budgeted in its own currency and stated under <your
accounting framework>, and the group figures use the agreed exchange
rates
measures:
cycle time: <weeks> from the targets to the issued budget
accuracy: the year's operating result against the budget, line by line
volume: <rounds of drafts per budget>
quality gate: every line traces to an assumption, a commitment, the
workforce plan or a draft with its reason, and the budget
carries one version
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
50 blanks to fill. Everything else is the process.
this process
from: ref/fin/set-the-annual-budget v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.