AgentMesh Catalog
reference process · finance · 15 activities · 8 on the roster

Check the Debt Covenants

A loan or a credit facility reaches a date on which its covenants are tested, usually once the quarter or the year it tests is closed, or a new or amended facility is signed. The treasury-analyst agent holds each facility as its dates, its covenants and the agreement's own definitions, and opens the test with every covenant and every report that falls due. The reporting-accountant agent supplies the figures the tests read from the closed and signed-off accounts. The treasury-analyst agent works out each financial covenant on the agreement's own definitions, with every adjustment shown, and checks the other undertakings, such as the reports the lenders are owed and the limits on further borrowing. The controller works the calculation out again. The planning-analyst agent projects the covenant figures forward from the latest forecast and reforecast, and the treasury-analyst agent raises any breach at risk to the chief financial officer (CFO) with the headroom, the date it would run out and the options. The CFO decides the response with counsel before the lenders hear of it. The treasury-analyst agent drafts the compliance certificate on the lender's form, the controller reviews it, a named officer signs it, and the treasurer sends it to the lenders through the channel the agreement names by its date. The run closes when every certificate and report the test owes has reached the lenders, and the calculation, the certificate and the lenders' acknowledgment are recorded.

The goals
  • Deliver 100% of compliance certificates by the date the agreement sets
  • Raise each breach at risk at least 2 quarters before the test it would fail
  • Raise no more than one warning a year for a test that then passes with room
  • Have lenders question under 5% of the certificates sent

They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.

The activities

What happens in a run

15 activities from a facility reaches a testing date, or a new or amended facility is signed to the certificate and the reports have reached the lenders, and the test is recorded, 5 of them gates a person has to sign.

Check the Debt Covenantsa facility reaches a testing date, or a new or amended facility is signed → the certificate and the reports have reached the lenders, and the test is recorded
the two workings disagreea covenant could fail at this test or alater onean undertaking is not met or will not bethe CFO asks for another projectionthe certificate does not agree with thecalculationthe officer will not sign as drafteda facility reaches a testingdate, or a new or amendedfacility is signed1Open the Testthe facilities, covenants andreports due, with their dates2Read Each Covenant'sDefinitionseach term as the agreement andevery amendment define it3Take In the Closed Figuresthe figures the tests read, fromthe signed-off accounts4Work Out Each FinancialCovenanteach ratio as the agreementdefines it, adjustments shown5Check the Other Undertakingsthe reports owed and limits ondebt, security and disposals6Check the CalculationIndependentlythe controller works each covenantout againa person signs · never an agent7Project the Covenants Forwardthe next tests, from the forecastand the reforecast8Raise a Breach at Riskthe headroom, when it runs out,and the options9Decide the Responsethe CFO, with counsel, decidesbefore the lenders heara person signs · never an agent10Draft the ComplianceCertificateon the lender's form, with thecalculation attached11Review the Certificatethe controller checks it againstthe calculationa person signs · never an agent12Sign the Certificatethe named officer signs ita person signs · never an agent13Send the Certificate to theLendersby its date, through the channelthe agreement namesa person signs · never an agent14Record the Testthe calculation, the certificateand the acknowledgment15Record What the Test Taughthow close each covenant came, andwhat the next test changesthe certificate and thereports have reached thelenders, and the test isrecorded
The roster this process needs
treasury-analyst 9 controller 2 reporting-accountant 1 planning-analyst 1 CFO 1 counsel 1 signing officer 1 treasurer 1

Hover a name to see the activities it holds. A dashed one is a person, and stays one.

The document

The document, with the blanks marked

Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.

PROCESS: check the debt covenants     id: <team>/check-the-debt-covenants   v1
from: ref/fin/check-the-debt-covenants v1
owner: <who>                          effective: <date>
trigger: a testing date in a facility agreement held in <your facility
         record> comes up and the period it tests is signed off at
         ref/fin/close-the-month, or a new or amended facility is signed
         watch: record=<facility test date> system=<your facility record>
                change=<a test date comes up and its period is signed
                off, or a facility is signed or amended>
concurrency: runs may overlap across facilities - one test date of one
             facility is one run, facilities tested on the same date
             with the same figures may run as one, and a test waits for
             the period it reads to be signed off
goal: every covenant due at <the test date> worked out on the agreement's
      own definitions and checked by a second person, every breach at
      risk raised to <your CFO role> before the lenders hear of it, and
      the compliance certificate signed by <your signing officer role>
      and received by the lenders by <the date the agreement sets>
phases:
  open-test          - system: the test opened with each facility due,
                       its covenants, the reports the lenders are owed
                       and the date each falls due, and a new or amended
                       facility entered in <your facility record> with
                       its dates, its covenants and its definitions
                       owner: treasury-analyst    after: trigger
                       automation: <level>
  read-definitions   - runs assessment: each term each covenant uses read
                       as the agreement and every amendment define it,
                       with each place it differs from <your accounting
                       framework> named
                       owner: treasury-analyst
                       after: open-test           automation: <level>
  take-in-figures    - runs collect-and-report: the figures the tests
                       read, taken from the accounts signed off at
                       ref/fin/close-the-month or
                       ref/fin/prepare-the-financial-statements, each
                       with its source and its sign-off
                       owner: reporting-accountant
                       after: open-test           automation: <level>
  work-out-covenants - runs assessment: each financial covenant worked
                       out on the agreement's own definitions, with every
                       adjustment the agreement allows shown beside the
                       figure it changes, and the headroom on each
                       owner: treasury-analyst
                       after: read-definitions + take-in-figures, and
                       recheck-covenants when the workings disagree
                       automation: <level>
  check-undertakings - runs assessment: each undertaking that is not a
                       ratio checked, such as the reports the lenders are
                       owed and their dates, the limits on further
                       borrowing, security and disposals, and the
                       insurance the agreement requires
                       owner: treasury-analyst
                       after: read-definitions    automation: <level>
  recheck-covenants  - runs assessment: <your controller role> works each
                       covenant out again from the same figures and
                       definitions, and the two workings are set side by
                       side
                       owner: <your controller role>
                       after: work-out-covenants  by: <days>
                       automation: never
  project-forward    - runs assessment: each covenant projected to the
                       next <number> test dates from the forecast at
                       ref/fin/forecast-cash and the reforecast at
                       ref/fin/reforecast-the-year, at their versions
                       owner: planning-analyst
                       after: recheck-covenants, and decide-response when
                       the CFO asks for another   automation: <level>
  raise-risk         - system: each covenant or undertaking at risk sent
                       to <your CFO role> with the headroom, the date it
                       would run out and the options, such as a waiver,
                       an amendment or a change to the plan
                       owner: treasury-analyst
                       after: project-forward or check-undertakings, when
                       a covenant or an undertaking is at risk
                       automation: <level>
  decide-response    - convenes decide-and-announce: <your CFO role>
                       decides with <your counsel role> how to respond to
                       each breach at risk, and what the lenders are told
                       and when, before anyone outside the company hears
                       of it
                       owner: <your CFO role>
                       after: raise-risk          by: <days>
                       automation: never
  draft-certificate  - human: the compliance certificate drafted on the
                       lender's form, stating each covenant as the
                       calculation found it, with the calculation and any
                       report the lenders are owed attached
                       owner: treasury-analyst
                       after: project-forward + check-undertakings, and
                       decide-response when it ran
                       automation: <level>
  review-certificate - runs assessment: <your controller role> checks the
                       certificate against the calculation, the
                       definitions and the signed-off figures
                       owner: <your controller role>
                       after: draft-certificate   by: <days>
                       automation: never
  sign-certificate   - convenes approval: <your signing officer role>
                       signs the certificate at its version, as the
                       agreement requires
                       owner: <your signing officer role>
                       after: review-certificate  by: <days>
                       automation: never
  send-certificate   - human: <your treasurer role> sends the signed
                       certificate and the reports owed to the lenders,
                       or to the agent for the lenders, through the
                       channel the agreement names
                       owner: <your treasurer role>
                       after: sign-certificate
                       by: <the date the agreement sets>
                       automation: never
  record-test        - system: the calculation, the controller's
                       working, the signed certificate, what was sent and
                       the lenders' acknowledgment kept at their versions
                       in <your facility record>
                       owner: treasury-analyst
                       after: send-certificate    automation: <level>
  record-learning    - convenes debrief: how close each covenant came,
                       which definitions caused a question, how early any
                       risk was seen, and what the next test changes
                       owner: treasury-analyst
                       after: record-test         automation: <level>
run-scoped:
  dates    - runs roll-call                     owner: treasury-analyst
             every: <cadence>
             from: open-test           until: send-certificate
handoffs:
  open-test -> read-definitions / take-in-figures [test-opened]: each
    facility, covenant and report due, with its date
  read-definitions -> work-out-covenants / check-undertakings
    [covenant-definitions]: each term as the agreement defines it, with
    each difference from the accounting framework named
  take-in-figures -> work-out-covenants [closed-figures]: each figure the
    tests read, with its source and its sign-off
  work-out-covenants -> recheck-covenants [covenant-workings]: each
    covenant worked out, with every adjustment and the headroom
  recheck-covenants -> project-forward [checked-workings]: the two
    workings side by side, agreed
  project-forward -> raise-risk / draft-certificate [projection]: each
    covenant projected to the next test dates
  check-undertakings -> raise-risk / draft-certificate [undertakings]:
    each undertaking met or at risk, with its evidence
  raise-risk -> decide-response [breach-at-risk]: the covenant or the
    undertaking, the headroom, the date it would run out and the options
  decide-response -> draft-certificate [response]: the CFO's decision,
    and what the lenders are told and when
  draft-certificate -> review-certificate [draft-certificate]: the
    certificate at a version, with the calculation attached
  review-certificate -> sign-certificate [reviewed-certificate]: the
    certificate as the controller checked it
  sign-certificate -> send-certificate [signed-certificate]: the
    certificate as signed. A change to any figure voids the signature
  send-certificate -> record-test [sent-certificate]: what was sent, to
    whom, through which channel and when
  record-test -> record-learning [recorded-test]: the test at its
    version, with the lenders' acknowledgment
deviations:
  recheck-covenants -> work-out-covenants [workings-disagree]: the two
    workings disagree, so the covenant is worked out again once the cause
    is found, and checked again in full
  decide-response -> project-forward [another-projection]: the CFO asks
    for another projection, so the covenants are projected again on the
    assumptions the CFO names
  review-certificate -> draft-certificate [certificate-does-not-agree]:
    the certificate does not agree with the calculation, so it is drafted
    again from the calculation
  sign-certificate -> draft-certificate [officer-will-not-sign]: the
    officer will not sign as drafted, so the certificate is drafted again
    on the lines the officer named and goes through the review again
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the treasurer, the controller,
           the CFO, counsel and the signing officer>
  systems: <your facility record> (write), <your general ledger> (read),
           <your consolidation system> (read), <your treasury system>
           (read), <your planning system> (read), the signature system
           (trigger), the notification channel (write)
  data:    each facility agreement and every amendment <version>, the
           signed-off accounts for the period <version>, the cash
           forecast <version>, the latest reforecast <version>, <your
           accounting framework> <version>, <your delegation of
           authority> <version>
policy:
  each covenant is worked out on the agreement's own definitions and
    every amendment, and a definition that differs from <your accounting
    framework> is applied as the agreement writes it, with the difference
    shown
  every figure the tests read comes from accounts signed off at
    ref/fin/close-the-month or ref/fin/prepare-the-financial-statements,
    and a figure changed after sign-off reopens the test
  whoever works out the covenants never checks them, and the controller's
    working is kept beside the agent's
  a breach at risk reaches <your CFO role> in the week it first shows,
    and the response to it, and any waiver or amendment, is a human
    decision taken with <your counsel role>
  the certificate states each covenant as the calculation found it, and
    no figure, adjustment or definition is changed to pass a test
  nothing goes to a lender before <your signing officer role> has signed
    it, and the agents sign nothing and send nothing to a lender
measures:
  cycle time: <days> from the period's sign-off to the certificate sent
  on time: <target> share of certificates received by their date
  volume: <facilities> and <tests per year>
  quality gate: every covenant figure traces to signed-off accounts and
                the agreement's definitions, with a second person's
                working beside it
Take it somewhere

Use this process in LangGraph

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

330 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.langchain.com/oss/python/langgraph/interrupts
    interrupt() and Command(resume=), which is how a gate stops a run
  https://reference.langchain.com/python/langgraph/graph/state/StateGraph
    StateGraph, add_edge, add_conditional_edges, defer

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN LANGGRAPH

11. A phase is a node added with `add_node`, under the phase's own name.

12. The state is a TypedDict. Each handoff key is one field on it.

13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
    once: when a backward edge re-enters ONE arm, the joined node never runs
    again, and the run ends early reporting success rather than raising. Mark the
    joined node `defer=True` and re-check inside it that both inbound handoffs
    exist.

14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
    The platform lets anything at all call resume, so require the resumed value to
    name a person and a date and refuse anything else. Say in the fidelity note
    that this proves only that whoever resumed typed a name, because
    `Command(resume=True)` from a scheduled job is indistinguishable from a person
    signing.

15. A deviation is `add_conditional_edges` with a routing function named after
    the key in brackets.

16. Pass a durable checkpointer rather than taking the in-memory default. The
    gates wait days, and the default loses every paused run on restart.

17. Leave every phase body unimplemented, raising until somebody registers an
    implementation. The automation level is a blank, so writing a body would
    answer on the adopter's behalf whether an agent may do that work.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: check the debt covenants     id: <team>/check-the-debt-covenants   v1
from: ref/fin/check-the-debt-covenants v1
owner: <who>                          effective: <date>
trigger: a testing date in a facility agreement held in <your facility
         record> comes up and the period it tests is signed off at
         ref/fin/close-the-month, or a new or amended facility is signed
         watch: record=<facility test date> system=<your facility record>
                change=<a test date comes up and its period is signed
                off, or a facility is signed or amended>
concurrency: runs may overlap across facilities - one test date of one
             facility is one run, facilities tested on the same date
             with the same figures may run as one, and a test waits for
             the period it reads to be signed off
goal: every covenant due at <the test date> worked out on the agreement's
      own definitions and checked by a second person, every breach at
      risk raised to <your CFO role> before the lenders hear of it, and
      the compliance certificate signed by <your signing officer role>
      and received by the lenders by <the date the agreement sets>
phases:
  open-test          - system: the test opened with each facility due,
                       its covenants, the reports the lenders are owed
                       and the date each falls due, and a new or amended
                       facility entered in <your facility record> with
                       its dates, its covenants and its definitions
                       owner: treasury-analyst    after: trigger
                       automation: <level>
  read-definitions   - runs assessment: each term each covenant uses read
                       as the agreement and every amendment define it,
                       with each place it differs from <your accounting
                       framework> named
                       owner: treasury-analyst
                       after: open-test           automation: <level>
  take-in-figures    - runs collect-and-report: the figures the tests
                       read, taken from the accounts signed off at
                       ref/fin/close-the-month or
                       ref/fin/prepare-the-financial-statements, each
                       with its source and its sign-off
                       owner: reporting-accountant
                       after: open-test           automation: <level>
  work-out-covenants - runs assessment: each financial covenant worked
                       out on the agreement's own definitions, with every
                       adjustment the agreement allows shown beside the
                       figure it changes, and the headroom on each
                       owner: treasury-analyst
                       after: read-definitions + take-in-figures, and
                       recheck-covenants when the workings disagree
                       automation: <level>
  check-undertakings - runs assessment: each undertaking that is not a
                       ratio checked, such as the reports the lenders are
                       owed and their dates, the limits on further
                       borrowing, security and disposals, and the
                       insurance the agreement requires
                       owner: treasury-analyst
                       after: read-definitions    automation: <level>
  recheck-covenants  - runs assessment: <your controller role> works each
                       covenant out again from the same figures and
                       definitions, and the two workings are set side by
                       side
                       owner: <your controller role>
                       after: work-out-covenants  by: <days>
                       automation: never
  project-forward    - runs assessment: each covenant projected to the
                       next <number> test dates from the forecast at
                       ref/fin/forecast-cash and the reforecast at
                       ref/fin/reforecast-the-year, at their versions
                       owner: planning-analyst
                       after: recheck-covenants, and decide-response when
                       the CFO asks for another   automation: <level>
  raise-risk         - system: each covenant or undertaking at risk sent
                       to <your CFO role> with the headroom, the date it
                       would run out and the options, such as a waiver,
                       an amendment or a change to the plan
                       owner: treasury-analyst
                       after: project-forward or check-undertakings, when
                       a covenant or an undertaking is at risk
                       automation: <level>
  decide-response    - convenes decide-and-announce: <your CFO role>
                       decides with <your counsel role> how to respond to
                       each breach at risk, and what the lenders are told
                       and when, before anyone outside the company hears
                       of it
                       owner: <your CFO role>
                       after: raise-risk          by: <days>
                       automation: never
  draft-certificate  - human: the compliance certificate drafted on the
                       lender's form, stating each covenant as the
                       calculation found it, with the calculation and any
                       report the lenders are owed attached
                       owner: treasury-analyst
                       after: project-forward + check-undertakings, and
                       decide-response when it ran
                       automation: <level>
  review-certificate - runs assessment: <your controller role> checks the
                       certificate against the calculation, the
                       definitions and the signed-off figures
                       owner: <your controller role>
                       after: draft-certificate   by: <days>
                       automation: never
  sign-certificate   - convenes approval: <your signing officer role>
                       signs the certificate at its version, as the
                       agreement requires
                       owner: <your signing officer role>
                       after: review-certificate  by: <days>
                       automation: never
  send-certificate   - human: <your treasurer role> sends the signed
                       certificate and the reports owed to the lenders,
                       or to the agent for the lenders, through the
                       channel the agreement names
                       owner: <your treasurer role>
                       after: sign-certificate
                       by: <the date the agreement sets>
                       automation: never
  record-test        - system: the calculation, the controller's
                       working, the signed certificate, what was sent and
                       the lenders' acknowledgment kept at their versions
                       in <your facility record>
                       owner: treasury-analyst
                       after: send-certificate    automation: <level>
  record-learning    - convenes debrief: how close each covenant came,
                       which definitions caused a question, how early any
                       risk was seen, and what the next test changes
                       owner: treasury-analyst
                       after: record-test         automation: <level>
run-scoped:
  dates    - runs roll-call                     owner: treasury-analyst
             every: <cadence>
             from: open-test           until: send-certificate
handoffs:
  open-test -> read-definitions / take-in-figures [test-opened]: each
    facility, covenant and report due, with its date
  read-definitions -> work-out-covenants / check-undertakings
    [covenant-definitions]: each term as the agreement defines it, with
    each difference from the accounting framework named
  take-in-figures -> work-out-covenants [closed-figures]: each figure the
    tests read, with its source and its sign-off
  work-out-covenants -> recheck-covenants [covenant-workings]: each
    covenant worked out, with every adjustment and the headroom
  recheck-covenants -> project-forward [checked-workings]: the two
    workings side by side, agreed
  project-forward -> raise-risk / draft-certificate [projection]: each
    covenant projected to the next test dates
  check-undertakings -> raise-risk / draft-certificate [undertakings]:
    each undertaking met or at risk, with its evidence
  raise-risk -> decide-response [breach-at-risk]: the covenant or the
    undertaking, the headroom, the date it would run out and the options
  decide-response -> draft-certificate [response]: the CFO's decision,
    and what the lenders are told and when
  draft-certificate -> review-certificate [draft-certificate]: the
    certificate at a version, with the calculation attached
  review-certificate -> sign-certificate [reviewed-certificate]: the
    certificate as the controller checked it
  sign-certificate -> send-certificate [signed-certificate]: the
    certificate as signed. A change to any figure voids the signature
  send-certificate -> record-test [sent-certificate]: what was sent, to
    whom, through which channel and when
  record-test -> record-learning [recorded-test]: the test at its
    version, with the lenders' acknowledgment
deviations:
  recheck-covenants -> work-out-covenants [workings-disagree]: the two
    workings disagree, so the covenant is worked out again once the cause
    is found, and checked again in full
  decide-response -> project-forward [another-projection]: the CFO asks
    for another projection, so the covenants are projected again on the
    assumptions the CFO names
  review-certificate -> draft-certificate [certificate-does-not-agree]:
    the certificate does not agree with the calculation, so it is drafted
    again from the calculation
  sign-certificate -> draft-certificate [officer-will-not-sign]: the
    officer will not sign as drafted, so the certificate is drafted again
    on the lines the officer named and goes through the review again
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the treasurer, the controller,
           the CFO, counsel and the signing officer>
  systems: <your facility record> (write), <your general ledger> (read),
           <your consolidation system> (read), <your treasury system>
           (read), <your planning system> (read), the signature system
           (trigger), the notification channel (write)
  data:    each facility agreement and every amendment <version>, the
           signed-off accounts for the period <version>, the cash
           forecast <version>, the latest reforecast <version>, <your
           accounting framework> <version>, <your delegation of
           authority> <version>
policy:
  each covenant is worked out on the agreement's own definitions and
    every amendment, and a definition that differs from <your accounting
    framework> is applied as the agreement writes it, with the difference
    shown
  every figure the tests read comes from accounts signed off at
    ref/fin/close-the-month or ref/fin/prepare-the-financial-statements,
    and a figure changed after sign-off reopens the test
  whoever works out the covenants never checks them, and the controller's
    working is kept beside the agent's
  a breach at risk reaches <your CFO role> in the week it first shows,
    and the response to it, and any waiver or amendment, is a human
    decision taken with <your counsel role>
  the certificate states each covenant as the calculation found it, and
    no figure, adjustment or definition is changed to pass a test
  nothing goes to a lender before <your signing officer role> has signed
    it, and the agents sign nothing and send nothing to a lender
measures:
  cycle time: <days> from the period's sign-off to the certificate sent
  on time: <target> share of certificates received by their date
  volume: <facilities> and <tests per year>
  quality gate: every covenant figure traces to signed-off accounts and
                the agreement's definitions, with a second person's
                working beside it
```
Take it somewhere

Use this process in Microsoft Agent Framework

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

385 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
    ctx.request_info, @response_handler, and answering a parked run later
  https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
    what a checkpoint holds, and allowed_checkpoint_types
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
    add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
  https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
    ctx.set_state and ctx.get_state as they actually are today

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK

11. Write for Python, and read those pages before writing a line. This API has
    moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
    `send_responses_streaming` are all in the training data and none of them exist
    any more. The .NET workflow API differs in kind rather than in spelling, so a
    file written for one does not port by renaming.

12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
    takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
    signature over the topology and the executor ids, so an id built from a run, a
    timestamp or a counter cannot be resumed into.

13. Give each phase a `@handler` method and move work on with
    `await ctx.send_message(...)`. A handler that returns without sending is a dead
    end: the branch stops, the run converges, and it reports success. So a phase
    you are deliberately leaving unimplemented must still send a placeholder
    onward. Do not stub with `raise NotImplementedError`, which fails the run
    instead of leaving it runnable.

14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
    `builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
    annotated `list[T]`, because a fan-in delivers one aggregated list rather than
    the separate messages. A handler typed for the single value is dropped as a
    mismatch with nothing raised.

15. The join is the trap here, and it is the opposite of LangGraph's. The
    barrier re-arms: it clears its buffer when it fires and then demands a fresh
    message from every source. So a deviation that re-enters ONE arm parks the
    run forever waiting for an arm that will not run again, and the workflow ends
    IDLE reporting success. Wherever a deviation re-enters one arm of a join,
    replace the barrier with an ordinary edge from each arm into a small executor
    that records each arrival with `ctx.set_state` and only forwards when every
    expected key is present, and say in a comment that putting `add_fan_in_edges`
    back reintroduces the stall.

16. A phase that is both a join target and a deviation target needs two
    handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
    backward message. Write only the list handler and every backward edge into it
    is discarded as a type mismatch, silently.

17. `automation: never` is `await ctx.request_info(request_data=...,
    response_type=...)` inside the phase, answered by a `@response_handler` on the
    same executor whose annotations match those exact types. The run parks at
    `IDLE_WITH_PENDING_REQUESTS` and the host answers with
    `workflow.run(stream=True, responses={request_id: value})`. If no handler
    matches the pair, the framework logs a warning and parks anyway, so the gate
    reads as working right up until somebody asks why the approval did not take.

18. A gate is only a gate if the wait survives a restart, so pass
    `checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
    is off by default and `InMemoryCheckpointStorage` reads as configured while
    persisting nothing. Register every handoff payload type in
    `allowed_checkpoint_types`, or the first restore raises. Anything an executor
    keeps as an instance attribute is absent after a restore unless you export it
    from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
    comes back empty rather than missing.

19. Each line under `deviations:` is `builder.add_edge(source, earlier,
    condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
    but raise `max_iterations` well above its default of 100, because several live
    cycles will exhaust a budget sized for a straight line and fail with a message
    about convergence that reads like a broken graph. Keep the ordinary forward
    edge unconditional and add each deviation beside it: a condition that returns
    false is dropped with no event, so a forward path expressed as a condition
    dies silently on every normal run, which is most of them.

20. Handoff values go in `ctx.set_state(key, value)` and come back from
    `ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
    at once and to everyone else only in the next superstep, and two writers of one
    key in a superstep keep the last write. Never read a key in the same superstep
    another phase wrote it.

21. There are no timers, no deadlines and no scheduled wakes. Nothing in
    `run-scoped:` becomes an executor and `by:` has no expression at all, so write
    them as comments naming where they start and stop, and say plainly in the
    fidelity note that a run can close over an unfinished run-scoped line. Do not
    fake a deadline with a sleep inside a handler, which blocks the whole superstep
    barrier, and never let an expiring wait release a gate.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: check the debt covenants     id: <team>/check-the-debt-covenants   v1
from: ref/fin/check-the-debt-covenants v1
owner: <who>                          effective: <date>
trigger: a testing date in a facility agreement held in <your facility
         record> comes up and the period it tests is signed off at
         ref/fin/close-the-month, or a new or amended facility is signed
         watch: record=<facility test date> system=<your facility record>
                change=<a test date comes up and its period is signed
                off, or a facility is signed or amended>
concurrency: runs may overlap across facilities - one test date of one
             facility is one run, facilities tested on the same date
             with the same figures may run as one, and a test waits for
             the period it reads to be signed off
goal: every covenant due at <the test date> worked out on the agreement's
      own definitions and checked by a second person, every breach at
      risk raised to <your CFO role> before the lenders hear of it, and
      the compliance certificate signed by <your signing officer role>
      and received by the lenders by <the date the agreement sets>
phases:
  open-test          - system: the test opened with each facility due,
                       its covenants, the reports the lenders are owed
                       and the date each falls due, and a new or amended
                       facility entered in <your facility record> with
                       its dates, its covenants and its definitions
                       owner: treasury-analyst    after: trigger
                       automation: <level>
  read-definitions   - runs assessment: each term each covenant uses read
                       as the agreement and every amendment define it,
                       with each place it differs from <your accounting
                       framework> named
                       owner: treasury-analyst
                       after: open-test           automation: <level>
  take-in-figures    - runs collect-and-report: the figures the tests
                       read, taken from the accounts signed off at
                       ref/fin/close-the-month or
                       ref/fin/prepare-the-financial-statements, each
                       with its source and its sign-off
                       owner: reporting-accountant
                       after: open-test           automation: <level>
  work-out-covenants - runs assessment: each financial covenant worked
                       out on the agreement's own definitions, with every
                       adjustment the agreement allows shown beside the
                       figure it changes, and the headroom on each
                       owner: treasury-analyst
                       after: read-definitions + take-in-figures, and
                       recheck-covenants when the workings disagree
                       automation: <level>
  check-undertakings - runs assessment: each undertaking that is not a
                       ratio checked, such as the reports the lenders are
                       owed and their dates, the limits on further
                       borrowing, security and disposals, and the
                       insurance the agreement requires
                       owner: treasury-analyst
                       after: read-definitions    automation: <level>
  recheck-covenants  - runs assessment: <your controller role> works each
                       covenant out again from the same figures and
                       definitions, and the two workings are set side by
                       side
                       owner: <your controller role>
                       after: work-out-covenants  by: <days>
                       automation: never
  project-forward    - runs assessment: each covenant projected to the
                       next <number> test dates from the forecast at
                       ref/fin/forecast-cash and the reforecast at
                       ref/fin/reforecast-the-year, at their versions
                       owner: planning-analyst
                       after: recheck-covenants, and decide-response when
                       the CFO asks for another   automation: <level>
  raise-risk         - system: each covenant or undertaking at risk sent
                       to <your CFO role> with the headroom, the date it
                       would run out and the options, such as a waiver,
                       an amendment or a change to the plan
                       owner: treasury-analyst
                       after: project-forward or check-undertakings, when
                       a covenant or an undertaking is at risk
                       automation: <level>
  decide-response    - convenes decide-and-announce: <your CFO role>
                       decides with <your counsel role> how to respond to
                       each breach at risk, and what the lenders are told
                       and when, before anyone outside the company hears
                       of it
                       owner: <your CFO role>
                       after: raise-risk          by: <days>
                       automation: never
  draft-certificate  - human: the compliance certificate drafted on the
                       lender's form, stating each covenant as the
                       calculation found it, with the calculation and any
                       report the lenders are owed attached
                       owner: treasury-analyst
                       after: project-forward + check-undertakings, and
                       decide-response when it ran
                       automation: <level>
  review-certificate - runs assessment: <your controller role> checks the
                       certificate against the calculation, the
                       definitions and the signed-off figures
                       owner: <your controller role>
                       after: draft-certificate   by: <days>
                       automation: never
  sign-certificate   - convenes approval: <your signing officer role>
                       signs the certificate at its version, as the
                       agreement requires
                       owner: <your signing officer role>
                       after: review-certificate  by: <days>
                       automation: never
  send-certificate   - human: <your treasurer role> sends the signed
                       certificate and the reports owed to the lenders,
                       or to the agent for the lenders, through the
                       channel the agreement names
                       owner: <your treasurer role>
                       after: sign-certificate
                       by: <the date the agreement sets>
                       automation: never
  record-test        - system: the calculation, the controller's
                       working, the signed certificate, what was sent and
                       the lenders' acknowledgment kept at their versions
                       in <your facility record>
                       owner: treasury-analyst
                       after: send-certificate    automation: <level>
  record-learning    - convenes debrief: how close each covenant came,
                       which definitions caused a question, how early any
                       risk was seen, and what the next test changes
                       owner: treasury-analyst
                       after: record-test         automation: <level>
run-scoped:
  dates    - runs roll-call                     owner: treasury-analyst
             every: <cadence>
             from: open-test           until: send-certificate
handoffs:
  open-test -> read-definitions / take-in-figures [test-opened]: each
    facility, covenant and report due, with its date
  read-definitions -> work-out-covenants / check-undertakings
    [covenant-definitions]: each term as the agreement defines it, with
    each difference from the accounting framework named
  take-in-figures -> work-out-covenants [closed-figures]: each figure the
    tests read, with its source and its sign-off
  work-out-covenants -> recheck-covenants [covenant-workings]: each
    covenant worked out, with every adjustment and the headroom
  recheck-covenants -> project-forward [checked-workings]: the two
    workings side by side, agreed
  project-forward -> raise-risk / draft-certificate [projection]: each
    covenant projected to the next test dates
  check-undertakings -> raise-risk / draft-certificate [undertakings]:
    each undertaking met or at risk, with its evidence
  raise-risk -> decide-response [breach-at-risk]: the covenant or the
    undertaking, the headroom, the date it would run out and the options
  decide-response -> draft-certificate [response]: the CFO's decision,
    and what the lenders are told and when
  draft-certificate -> review-certificate [draft-certificate]: the
    certificate at a version, with the calculation attached
  review-certificate -> sign-certificate [reviewed-certificate]: the
    certificate as the controller checked it
  sign-certificate -> send-certificate [signed-certificate]: the
    certificate as signed. A change to any figure voids the signature
  send-certificate -> record-test [sent-certificate]: what was sent, to
    whom, through which channel and when
  record-test -> record-learning [recorded-test]: the test at its
    version, with the lenders' acknowledgment
deviations:
  recheck-covenants -> work-out-covenants [workings-disagree]: the two
    workings disagree, so the covenant is worked out again once the cause
    is found, and checked again in full
  decide-response -> project-forward [another-projection]: the CFO asks
    for another projection, so the covenants are projected again on the
    assumptions the CFO names
  review-certificate -> draft-certificate [certificate-does-not-agree]:
    the certificate does not agree with the calculation, so it is drafted
    again from the calculation
  sign-certificate -> draft-certificate [officer-will-not-sign]: the
    officer will not sign as drafted, so the certificate is drafted again
    on the lines the officer named and goes through the review again
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the treasurer, the controller,
           the CFO, counsel and the signing officer>
  systems: <your facility record> (write), <your general ledger> (read),
           <your consolidation system> (read), <your treasury system>
           (read), <your planning system> (read), the signature system
           (trigger), the notification channel (write)
  data:    each facility agreement and every amendment <version>, the
           signed-off accounts for the period <version>, the cash
           forecast <version>, the latest reforecast <version>, <your
           accounting framework> <version>, <your delegation of
           authority> <version>
policy:
  each covenant is worked out on the agreement's own definitions and
    every amendment, and a definition that differs from <your accounting
    framework> is applied as the agreement writes it, with the difference
    shown
  every figure the tests read comes from accounts signed off at
    ref/fin/close-the-month or ref/fin/prepare-the-financial-statements,
    and a figure changed after sign-off reopens the test
  whoever works out the covenants never checks them, and the controller's
    working is kept beside the agent's
  a breach at risk reaches <your CFO role> in the week it first shows,
    and the response to it, and any waiver or amendment, is a human
    decision taken with <your counsel role>
  the certificate states each covenant as the calculation found it, and
    no figure, adjustment or definition is changed to pass a test
  nothing goes to a lender before <your signing officer role> has signed
    it, and the agents sign nothing and send nothing to a lender
measures:
  cycle time: <days> from the period's sign-off to the certificate sent
  on time: <target> share of certificates received by their date
  volume: <facilities> and <tests per year>
  quality gate: every covenant figure traces to signed-off accounts and
                the agreement's definitions, with a second person's
                working beside it
```
Take it somewhere

Use this process in CrewAI Flows

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

390 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://docs.crewai.com/en/concepts/flows
    Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
  https://docs.crewai.com/en/learn/human-feedback-in-flows
    @human_feedback, the provider protocol, from_pending and resume
  https://docs.crewai.com/en/guides/flows/mastering-flow-state
    @persist and what persistence actually promises, which is less than it sounds

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN CREWAI FLOWS

11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
    no persistence handle and no gate, and cannot express this document at all.
    Each phase is one method on a single `Flow` subclass, keeping its name with
    hyphens turned into underscores. A phase that genuinely needs role-based agents
    builds its own Crew inside its own method body, and the Flow stays the graph.

12. Declare the state as a Pydantic model bound as the type parameter,
    `class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
    `self.state.field`. Never use the untyped dict form: the handoff keys are this
    process's memory, and an untyped dict turns a misspelt key into a handoff that
    is silently absent. Keep the auto-injected `id` field, which is what every
    resume depends on.

13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
    write `or_` where the document writes `+`.

14. Check every inbound handoff at the top of the method and raise if one is
    missing. `@listen` says when a method may run and says nothing about what is
    in hand when it does.

15. The join is the trap, and it is proven rather than theoretical. `and_()`
    empties its accumulator the moment it fires, so re-entering BOTH arms works
    forever, and re-entering ONE arm after it has fired leaves it holding a single
    trigger and waiting for the other for good. The cascade drains, CrewAI prints
    that the flow completed, and `kickoff()` returns normally. So for any joining
    phase that a deviation can send work back into, do not use `and_()` at all:
    make the join a `@router` that both arms trigger, which reads the state fields
    and emits its label only when every inbound handoff is present. A router is
    re-evaluated against durable state every time and is never suppressed by the
    once-fired set.

16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
    one accumulator per listener, shared across every branch of its condition and
    wiped when any branch satisfies, so the label firing while the join is half
    full erases the arm that had already arrived.

17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
    under the method's `@listen`, with a provider whose `request_feedback` raises
    `HumanFeedbackPending`. The run then persists, returns that object from
    `kickoff()`, and a different process answers later with `from_pending(flow_id,
    persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
    which calls `input()`: that gate exists only while somebody is watching a
    terminal, and a run started by a scheduler either hangs or takes an empty
    string.

18. Silence must not approve, and the platform's default is that it does. With
    `emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
    first label when that is unset, with no model consulted and nobody named. Treat
    an empty or unrecognised answer as a refusal in your own router. And write the
    approver's name and the time onto the state yourself, because
    `HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
    field for the person, which the specification requires.

19. Each line under `deviations:` is a `@router` named after the key, returning
    a label named after the same key, with the target subscribing as
    `@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
    directly, because a router is re-evaluated on every cycle while a top-level
    `or_` listener is suppressed after it first fires.

20. An exception edge is a `try` and `except` around the failing phase's body,
    recording the failure on the state and emitting an exception label from a
    router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
    the clearing phase would run on every healthy run.

21. An unimplemented phase is a method with the document's own sentence as its
    docstring and a bare `pass`, which is safe because listeners still fire on a
    `None` return. An unimplemented `@router` is not safe: returning `None` emits
    no label, every phase below it disappears from the run including the gates, and
    the flow reports success. A stub router must return a hard-coded label with a
    TODO beside it, or raise.

22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
    every phase that performs a real act as something that will run twice.
    Persistence saves the state fields and nothing else, so a restart rehydrates
    the data and runs the graph again from `@start`: a flow that had already sent a
    written refusal sends a second one. Guard each acting phase with a state field
    it checks and sets.

23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
    counterpart at all. Put each `by:` value as a named constant, name the
    run-scoped lines in the module docstring as unimplemented obligations, and say
    in the fidelity note that no deadline in this document is enforced by anything.
    These absences produce no diagnostic whatsoever, which is exactly why they have
    to be written down.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: check the debt covenants     id: <team>/check-the-debt-covenants   v1
from: ref/fin/check-the-debt-covenants v1
owner: <who>                          effective: <date>
trigger: a testing date in a facility agreement held in <your facility
         record> comes up and the period it tests is signed off at
         ref/fin/close-the-month, or a new or amended facility is signed
         watch: record=<facility test date> system=<your facility record>
                change=<a test date comes up and its period is signed
                off, or a facility is signed or amended>
concurrency: runs may overlap across facilities - one test date of one
             facility is one run, facilities tested on the same date
             with the same figures may run as one, and a test waits for
             the period it reads to be signed off
goal: every covenant due at <the test date> worked out on the agreement's
      own definitions and checked by a second person, every breach at
      risk raised to <your CFO role> before the lenders hear of it, and
      the compliance certificate signed by <your signing officer role>
      and received by the lenders by <the date the agreement sets>
phases:
  open-test          - system: the test opened with each facility due,
                       its covenants, the reports the lenders are owed
                       and the date each falls due, and a new or amended
                       facility entered in <your facility record> with
                       its dates, its covenants and its definitions
                       owner: treasury-analyst    after: trigger
                       automation: <level>
  read-definitions   - runs assessment: each term each covenant uses read
                       as the agreement and every amendment define it,
                       with each place it differs from <your accounting
                       framework> named
                       owner: treasury-analyst
                       after: open-test           automation: <level>
  take-in-figures    - runs collect-and-report: the figures the tests
                       read, taken from the accounts signed off at
                       ref/fin/close-the-month or
                       ref/fin/prepare-the-financial-statements, each
                       with its source and its sign-off
                       owner: reporting-accountant
                       after: open-test           automation: <level>
  work-out-covenants - runs assessment: each financial covenant worked
                       out on the agreement's own definitions, with every
                       adjustment the agreement allows shown beside the
                       figure it changes, and the headroom on each
                       owner: treasury-analyst
                       after: read-definitions + take-in-figures, and
                       recheck-covenants when the workings disagree
                       automation: <level>
  check-undertakings - runs assessment: each undertaking that is not a
                       ratio checked, such as the reports the lenders are
                       owed and their dates, the limits on further
                       borrowing, security and disposals, and the
                       insurance the agreement requires
                       owner: treasury-analyst
                       after: read-definitions    automation: <level>
  recheck-covenants  - runs assessment: <your controller role> works each
                       covenant out again from the same figures and
                       definitions, and the two workings are set side by
                       side
                       owner: <your controller role>
                       after: work-out-covenants  by: <days>
                       automation: never
  project-forward    - runs assessment: each covenant projected to the
                       next <number> test dates from the forecast at
                       ref/fin/forecast-cash and the reforecast at
                       ref/fin/reforecast-the-year, at their versions
                       owner: planning-analyst
                       after: recheck-covenants, and decide-response when
                       the CFO asks for another   automation: <level>
  raise-risk         - system: each covenant or undertaking at risk sent
                       to <your CFO role> with the headroom, the date it
                       would run out and the options, such as a waiver,
                       an amendment or a change to the plan
                       owner: treasury-analyst
                       after: project-forward or check-undertakings, when
                       a covenant or an undertaking is at risk
                       automation: <level>
  decide-response    - convenes decide-and-announce: <your CFO role>
                       decides with <your counsel role> how to respond to
                       each breach at risk, and what the lenders are told
                       and when, before anyone outside the company hears
                       of it
                       owner: <your CFO role>
                       after: raise-risk          by: <days>
                       automation: never
  draft-certificate  - human: the compliance certificate drafted on the
                       lender's form, stating each covenant as the
                       calculation found it, with the calculation and any
                       report the lenders are owed attached
                       owner: treasury-analyst
                       after: project-forward + check-undertakings, and
                       decide-response when it ran
                       automation: <level>
  review-certificate - runs assessment: <your controller role> checks the
                       certificate against the calculation, the
                       definitions and the signed-off figures
                       owner: <your controller role>
                       after: draft-certificate   by: <days>
                       automation: never
  sign-certificate   - convenes approval: <your signing officer role>
                       signs the certificate at its version, as the
                       agreement requires
                       owner: <your signing officer role>
                       after: review-certificate  by: <days>
                       automation: never
  send-certificate   - human: <your treasurer role> sends the signed
                       certificate and the reports owed to the lenders,
                       or to the agent for the lenders, through the
                       channel the agreement names
                       owner: <your treasurer role>
                       after: sign-certificate
                       by: <the date the agreement sets>
                       automation: never
  record-test        - system: the calculation, the controller's
                       working, the signed certificate, what was sent and
                       the lenders' acknowledgment kept at their versions
                       in <your facility record>
                       owner: treasury-analyst
                       after: send-certificate    automation: <level>
  record-learning    - convenes debrief: how close each covenant came,
                       which definitions caused a question, how early any
                       risk was seen, and what the next test changes
                       owner: treasury-analyst
                       after: record-test         automation: <level>
run-scoped:
  dates    - runs roll-call                     owner: treasury-analyst
             every: <cadence>
             from: open-test           until: send-certificate
handoffs:
  open-test -> read-definitions / take-in-figures [test-opened]: each
    facility, covenant and report due, with its date
  read-definitions -> work-out-covenants / check-undertakings
    [covenant-definitions]: each term as the agreement defines it, with
    each difference from the accounting framework named
  take-in-figures -> work-out-covenants [closed-figures]: each figure the
    tests read, with its source and its sign-off
  work-out-covenants -> recheck-covenants [covenant-workings]: each
    covenant worked out, with every adjustment and the headroom
  recheck-covenants -> project-forward [checked-workings]: the two
    workings side by side, agreed
  project-forward -> raise-risk / draft-certificate [projection]: each
    covenant projected to the next test dates
  check-undertakings -> raise-risk / draft-certificate [undertakings]:
    each undertaking met or at risk, with its evidence
  raise-risk -> decide-response [breach-at-risk]: the covenant or the
    undertaking, the headroom, the date it would run out and the options
  decide-response -> draft-certificate [response]: the CFO's decision,
    and what the lenders are told and when
  draft-certificate -> review-certificate [draft-certificate]: the
    certificate at a version, with the calculation attached
  review-certificate -> sign-certificate [reviewed-certificate]: the
    certificate as the controller checked it
  sign-certificate -> send-certificate [signed-certificate]: the
    certificate as signed. A change to any figure voids the signature
  send-certificate -> record-test [sent-certificate]: what was sent, to
    whom, through which channel and when
  record-test -> record-learning [recorded-test]: the test at its
    version, with the lenders' acknowledgment
deviations:
  recheck-covenants -> work-out-covenants [workings-disagree]: the two
    workings disagree, so the covenant is worked out again once the cause
    is found, and checked again in full
  decide-response -> project-forward [another-projection]: the CFO asks
    for another projection, so the covenants are projected again on the
    assumptions the CFO names
  review-certificate -> draft-certificate [certificate-does-not-agree]:
    the certificate does not agree with the calculation, so it is drafted
    again from the calculation
  sign-certificate -> draft-certificate [officer-will-not-sign]: the
    officer will not sign as drafted, so the certificate is drafted again
    on the lines the officer named and goes through the review again
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the treasurer, the controller,
           the CFO, counsel and the signing officer>
  systems: <your facility record> (write), <your general ledger> (read),
           <your consolidation system> (read), <your treasury system>
           (read), <your planning system> (read), the signature system
           (trigger), the notification channel (write)
  data:    each facility agreement and every amendment <version>, the
           signed-off accounts for the period <version>, the cash
           forecast <version>, the latest reforecast <version>, <your
           accounting framework> <version>, <your delegation of
           authority> <version>
policy:
  each covenant is worked out on the agreement's own definitions and
    every amendment, and a definition that differs from <your accounting
    framework> is applied as the agreement writes it, with the difference
    shown
  every figure the tests read comes from accounts signed off at
    ref/fin/close-the-month or ref/fin/prepare-the-financial-statements,
    and a figure changed after sign-off reopens the test
  whoever works out the covenants never checks them, and the controller's
    working is kept beside the agent's
  a breach at risk reaches <your CFO role> in the week it first shows,
    and the response to it, and any waiver or amendment, is a human
    decision taken with <your counsel role>
  the certificate states each covenant as the calculation found it, and
    no figure, adjustment or definition is changed to pass a test
  nothing goes to a lender before <your signing officer role> has signed
    it, and the agents sign nothing and send nothing to a lender
measures:
  cycle time: <days> from the period's sign-off to the certificate sent
  on time: <target> share of certificates received by their date
  volume: <facilities> and <tests per year>
  quality gate: every covenant figure traces to signed-off accounts and
                the agreement's definitions, with a second person's
                working beside it
```
Take it somewhere

Use this process in Google ADK

Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.

381 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.

The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:

  https://agentprocesses.ai/spec.html

Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.

Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:

  https://adk.dev/graphs/routes/
    nodes, tuple chains, Event(route=), JoinNode, back-edges
  https://adk.dev/graphs/human-input/
    RequestInput and the rerun_on_resume handoff
  https://adk.dev/runtime/resume/
    ResumabilityConfig, resuming by invocation id, at-least-once tools
  https://adk.dev/graphs/data-handling/
    Event.output against state, and the selector syntax in instructions

WHAT THE DOCUMENT ASKS FOR

These hold wherever the process lands, and they matter more than style.

1. Each phase under `phases:` becomes one step, and keeps its name.

2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
   Reading it as "either" is the defect the specification calls out by name.

3. Every handoff carries a key in square brackets. Each key becomes one field
   on the run's state, named exactly as the key with hyphens turned into
   underscores, and the sentence beside it becomes that field's comment. The key
   is the stable name; the sentence is prose that may be rewritten.

4. A phase MUST NOT begin before its inbound handoff exists. Where that is
   checkable, check it in the step rather than assuming it.

5. `automation: never` is a gate a person signs. The run stops there and does
   not continue until a person's decision comes back. Do not turn one into a
   notification, a log line, or an automatic transition, whatever the queue
   looks like.

6. Each line under `deviations:` is a backward or sideways edge, returning to
   the phase named on the right. The key in brackets names it, and that name
   belongs in the code.

7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
   exception edge: it is entered when those phases FAIL, not when they succeed.
   Do not wire it as an ordinary successor.

8. Anything in angle brackets is a blank the adopting organization fills in.
   Leave each one as a named constant at the top of the file with a TODO. Do not
   invent a value, a threshold or a date.

9. Record the document's `from:` line at the top of the file, so it says which
   reference process and which version it was generated from.

10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
    process rather than at one point in it, and a run may not close while one is
    unfinished. Say in the code what you did about them, including if the answer
    is that the runtime has nowhere to put them.

HOW THAT LOOKS IN GOOGLE ADK

11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
    a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
    are deprecated in favour of the graph, and they carry their own defects around
    state and control flow. The documentation moved to adk.dev, and anything you
    remember about nesting agents rather than drawing a graph is out of date.

12. Each phase is one node keeping its name. Take the node kind from how the
    phase resolves rather than from taste: a `human:` or `system:` phase is a plain
    Python function node, and a `runs` or `convenes` phase is an `Agent`.

13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
    trigger is the `"START"` keyword. Take the order only from `after:` lines and
    never from the order the phases are listed in.

14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
    worst trap of any runtime here. The join fires when every static predecessor is
    marked COMPLETED, nothing ever un-completes a node, and stored outputs are
    never cleared. So after a deviation re-runs one arm, the join fires the instant
    that arm finishes and hands the next phase LAST PASS'S value for every arm that
    did not re-run. It does not stall, it proceeds with stale data, and nothing
    logs. Stamp each arm's output with a pass counter or a content hash, and have
    the phase after the join compare the stamps and refuse to run when they
    disagree.

15. Each line under `deviations:` is a routed back-edge: a router after the
    phase on the left returning `Event(route=...)`, named after the key in
    brackets, with one arm going back to the phase on the right and one going
    forward. An unconditional cycle raises at construction, which is the one place
    this model checks your work. Nothing budgets a routed cycle, so add your own
    count and stop rather than looping forever.

16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
    that stops and asks a person. A route value matching no key writes a log
    warning, ends that branch, and lets the run finish reporting success with the
    rest of the process never having happened.

17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
    asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
    `RequestInput(message=..., payload=..., response_schema=...)`, so the run
    stops, persists, and delivers the person's answer to the node's successor as
    its typed input. A resumed workflow runs its tools at least once, so any
    irreversible act needs its own duplicate guard.

18. Make the gates durable or say plainly that they are not. Wrap the graph in
    `App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
    a persisting session service, never the in-memory one. Note in the file that
    the command line and the web UI cannot resume a run, so whoever releases these
    gates needs an operator surface that somebody has to write.

19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
    A non-empty `sub_agents` list silently adds a transfer tool, and a model that
    uses it runs a different agent in this node's place while the graph's outgoing
    edge fires on schedule regardless: the topology is honoured perfectly and the
    work belongs to somebody else.

20. Model failure as a route, not as an exception. A node that raises does not
    propagate: the failure is caught, recorded, and shuts the workflow down without
    raising to the caller. So a phase that can fail catches its own failure and
    returns `Event(route="could-not-finish")`, and the exception phase hangs off
    that arm.

21. Keep every blank as a named module-level constant and never interpolate one
    into an `instruction=` string. Angle brackets and curly braces are ADK's own
    data selector syntax inside instructions, so a blank pasted verbatim stops
    being a blank and becomes a selector.

22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
    one: it is an in-process wall clock that cancels the node and, because failures
    are swallowed, ends the run silently rather than recording a missed deadline.
    Nothing in `run-scoped:` has an expression either, and it must not be faked as
    an ordinary node, because a node has to be reached and has to finish before
    anything downstream starts, which is the opposite of what those lines mean.
    Leave both out of the graph and name them in the fidelity note.

Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.

It has three parts.

**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.

**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.

**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.

Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.

Here is the process document.

```
PROCESS: check the debt covenants     id: <team>/check-the-debt-covenants   v1
from: ref/fin/check-the-debt-covenants v1
owner: <who>                          effective: <date>
trigger: a testing date in a facility agreement held in <your facility
         record> comes up and the period it tests is signed off at
         ref/fin/close-the-month, or a new or amended facility is signed
         watch: record=<facility test date> system=<your facility record>
                change=<a test date comes up and its period is signed
                off, or a facility is signed or amended>
concurrency: runs may overlap across facilities - one test date of one
             facility is one run, facilities tested on the same date
             with the same figures may run as one, and a test waits for
             the period it reads to be signed off
goal: every covenant due at <the test date> worked out on the agreement's
      own definitions and checked by a second person, every breach at
      risk raised to <your CFO role> before the lenders hear of it, and
      the compliance certificate signed by <your signing officer role>
      and received by the lenders by <the date the agreement sets>
phases:
  open-test          - system: the test opened with each facility due,
                       its covenants, the reports the lenders are owed
                       and the date each falls due, and a new or amended
                       facility entered in <your facility record> with
                       its dates, its covenants and its definitions
                       owner: treasury-analyst    after: trigger
                       automation: <level>
  read-definitions   - runs assessment: each term each covenant uses read
                       as the agreement and every amendment define it,
                       with each place it differs from <your accounting
                       framework> named
                       owner: treasury-analyst
                       after: open-test           automation: <level>
  take-in-figures    - runs collect-and-report: the figures the tests
                       read, taken from the accounts signed off at
                       ref/fin/close-the-month or
                       ref/fin/prepare-the-financial-statements, each
                       with its source and its sign-off
                       owner: reporting-accountant
                       after: open-test           automation: <level>
  work-out-covenants - runs assessment: each financial covenant worked
                       out on the agreement's own definitions, with every
                       adjustment the agreement allows shown beside the
                       figure it changes, and the headroom on each
                       owner: treasury-analyst
                       after: read-definitions + take-in-figures, and
                       recheck-covenants when the workings disagree
                       automation: <level>
  check-undertakings - runs assessment: each undertaking that is not a
                       ratio checked, such as the reports the lenders are
                       owed and their dates, the limits on further
                       borrowing, security and disposals, and the
                       insurance the agreement requires
                       owner: treasury-analyst
                       after: read-definitions    automation: <level>
  recheck-covenants  - runs assessment: <your controller role> works each
                       covenant out again from the same figures and
                       definitions, and the two workings are set side by
                       side
                       owner: <your controller role>
                       after: work-out-covenants  by: <days>
                       automation: never
  project-forward    - runs assessment: each covenant projected to the
                       next <number> test dates from the forecast at
                       ref/fin/forecast-cash and the reforecast at
                       ref/fin/reforecast-the-year, at their versions
                       owner: planning-analyst
                       after: recheck-covenants, and decide-response when
                       the CFO asks for another   automation: <level>
  raise-risk         - system: each covenant or undertaking at risk sent
                       to <your CFO role> with the headroom, the date it
                       would run out and the options, such as a waiver,
                       an amendment or a change to the plan
                       owner: treasury-analyst
                       after: project-forward or check-undertakings, when
                       a covenant or an undertaking is at risk
                       automation: <level>
  decide-response    - convenes decide-and-announce: <your CFO role>
                       decides with <your counsel role> how to respond to
                       each breach at risk, and what the lenders are told
                       and when, before anyone outside the company hears
                       of it
                       owner: <your CFO role>
                       after: raise-risk          by: <days>
                       automation: never
  draft-certificate  - human: the compliance certificate drafted on the
                       lender's form, stating each covenant as the
                       calculation found it, with the calculation and any
                       report the lenders are owed attached
                       owner: treasury-analyst
                       after: project-forward + check-undertakings, and
                       decide-response when it ran
                       automation: <level>
  review-certificate - runs assessment: <your controller role> checks the
                       certificate against the calculation, the
                       definitions and the signed-off figures
                       owner: <your controller role>
                       after: draft-certificate   by: <days>
                       automation: never
  sign-certificate   - convenes approval: <your signing officer role>
                       signs the certificate at its version, as the
                       agreement requires
                       owner: <your signing officer role>
                       after: review-certificate  by: <days>
                       automation: never
  send-certificate   - human: <your treasurer role> sends the signed
                       certificate and the reports owed to the lenders,
                       or to the agent for the lenders, through the
                       channel the agreement names
                       owner: <your treasurer role>
                       after: sign-certificate
                       by: <the date the agreement sets>
                       automation: never
  record-test        - system: the calculation, the controller's
                       working, the signed certificate, what was sent and
                       the lenders' acknowledgment kept at their versions
                       in <your facility record>
                       owner: treasury-analyst
                       after: send-certificate    automation: <level>
  record-learning    - convenes debrief: how close each covenant came,
                       which definitions caused a question, how early any
                       risk was seen, and what the next test changes
                       owner: treasury-analyst
                       after: record-test         automation: <level>
run-scoped:
  dates    - runs roll-call                     owner: treasury-analyst
             every: <cadence>
             from: open-test           until: send-certificate
handoffs:
  open-test -> read-definitions / take-in-figures [test-opened]: each
    facility, covenant and report due, with its date
  read-definitions -> work-out-covenants / check-undertakings
    [covenant-definitions]: each term as the agreement defines it, with
    each difference from the accounting framework named
  take-in-figures -> work-out-covenants [closed-figures]: each figure the
    tests read, with its source and its sign-off
  work-out-covenants -> recheck-covenants [covenant-workings]: each
    covenant worked out, with every adjustment and the headroom
  recheck-covenants -> project-forward [checked-workings]: the two
    workings side by side, agreed
  project-forward -> raise-risk / draft-certificate [projection]: each
    covenant projected to the next test dates
  check-undertakings -> raise-risk / draft-certificate [undertakings]:
    each undertaking met or at risk, with its evidence
  raise-risk -> decide-response [breach-at-risk]: the covenant or the
    undertaking, the headroom, the date it would run out and the options
  decide-response -> draft-certificate [response]: the CFO's decision,
    and what the lenders are told and when
  draft-certificate -> review-certificate [draft-certificate]: the
    certificate at a version, with the calculation attached
  review-certificate -> sign-certificate [reviewed-certificate]: the
    certificate as the controller checked it
  sign-certificate -> send-certificate [signed-certificate]: the
    certificate as signed. A change to any figure voids the signature
  send-certificate -> record-test [sent-certificate]: what was sent, to
    whom, through which channel and when
  record-test -> record-learning [recorded-test]: the test at its
    version, with the lenders' acknowledgment
deviations:
  recheck-covenants -> work-out-covenants [workings-disagree]: the two
    workings disagree, so the covenant is worked out again once the cause
    is found, and checked again in full
  decide-response -> project-forward [another-projection]: the CFO asks
    for another projection, so the covenants are projected again on the
    assumptions the CFO names
  review-certificate -> draft-certificate [certificate-does-not-agree]:
    the certificate does not agree with the calculation, so it is drafted
    again from the calculation
  sign-certificate -> draft-certificate [officer-will-not-sign]: the
    officer will not sign as drafted, so the certificate is drafted again
    on the lines the officer named and goes through the review again
bindings:
  roster:  <who holds each role - agents claiming the abstract agents
           above, and named people for the treasurer, the controller,
           the CFO, counsel and the signing officer>
  systems: <your facility record> (write), <your general ledger> (read),
           <your consolidation system> (read), <your treasury system>
           (read), <your planning system> (read), the signature system
           (trigger), the notification channel (write)
  data:    each facility agreement and every amendment <version>, the
           signed-off accounts for the period <version>, the cash
           forecast <version>, the latest reforecast <version>, <your
           accounting framework> <version>, <your delegation of
           authority> <version>
policy:
  each covenant is worked out on the agreement's own definitions and
    every amendment, and a definition that differs from <your accounting
    framework> is applied as the agreement writes it, with the difference
    shown
  every figure the tests read comes from accounts signed off at
    ref/fin/close-the-month or ref/fin/prepare-the-financial-statements,
    and a figure changed after sign-off reopens the test
  whoever works out the covenants never checks them, and the controller's
    working is kept beside the agent's
  a breach at risk reaches <your CFO role> in the week it first shows,
    and the response to it, and any waiver or amendment, is a human
    decision taken with <your counsel role>
  the certificate states each covenant as the calculation found it, and
    no figure, adjustment or definition is changed to pass a test
  nothing goes to a lender before <your signing officer role> has signed
    it, and the agents sign nothing and send nothing to a lender
measures:
  cycle time: <days> from the period's sign-off to the certificate sent
  on time: <target> share of certificates received by their date
  volume: <facilities> and <tests per year>
  quality gate: every covenant figure traces to signed-off accounts and
                the agreement's definitions, with a second person's
                working beside it
```
One run

A simulation of one run

The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.

This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.

Adoption

What you fill in

58 blanks to fill. Everything else is the process.

this process from: ref/fin/check-the-debt-covenants v1 Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.

The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.

The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.

The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.