Pay Approved Invoices
The payment calendar reaches a payment date, and every approved item that falls due before the next run has to be paid the right amount on time. The payables-processor agent gathers the approved supplier invoices, expense claims, customer refunds and company card statement that fall due, takes the credits owed to the company, holds back each item that is disputed, on hold or waiting on a change of bank details with its reason, and proposes the run with the early-payment discounts worth taking. The treasury-analyst agent checks the run against the cash in the paying account and the day's cash position, and when the cash is short the treasurer funds the account or decides which items wait. A named approver who prepared none of the run approves it. The payables-processor agent builds the payment file from the approved run to the bank details on each payee's verified record, the wire-check agent checks every payment against the approved items and the verified bank record, and two named people release the payments under `<your dual control rule>`. The wire-check agent confirms where each payment landed, the payables-processor agent sends each payee its remittance advice and records the payments in the ledger, and the treasury-analyst agent updates the cash position. The run closes when every payment has landed or is held with its reason, every payee has its remittance advice, and the ledger shows each item paid.
The goals
Pay 98% of approved invoices on or before their due date
Pay invoices that carry no discount no more than 1 day before their due date
Take 90% of the early-payment discounts worth taking
Make fewer than 2% of payments outside the payment calendar
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
16 activities from the payment calendar reaches a payment date to every payment has landed or is held with its reason, and the ledger shows each item paid, 3 of them gates a person has to sign.
Pay Approved Invoices the payment calendar reaches a payment date → every payment has landed or is held with its reason, and the ledger shows each item paid
the cash will not cover the run items are taken out of the run the approver will not approve an item a payment does not match an approved item or the verified record a payment is returned or rejected the payment calendar reaches a payment date 1 Open the Payment Run the payment date, paying account and cutoff for items 2 Gather the Items Due approved invoices, claims, refunds, card bills and credits 3 Hold What Cannot Be Paid a dispute, a held supplier or a held bank change, and why 4 Propose the Run the items, amounts, value dates and discounts worth taking 5 Check the Cash to Cover the Run the run against the paying account and the cash position 6 Decide What Waits the treasurer funds the account or chooses which items wait a person signs · never an agent 7 Approve the Payment Run a named approver who prepared none of it a person signs · never an agent 8 Build the Payment File one payment per payee from the run, to verified details 9 Check the Payment File each payment against the items and the verified bank record 10 Release the Payments two named people release them under dual control a person signs · never an agent 11 Confirm Where Each Payment Landed every payment matched to the bank's report 12 Handle a Returned Payment held with the reason, paid again only to verified details 13 Send the Remittance Advice each payee told what was paid and which items it settles 14 Record the Payments in the Ledger each item marked paid, and the payments posted 15 Update the Cash Position the released run in the day's position and the cash forecast 16 Record What the Run Taught items held, payments returned, discounts missed every payment has landed or is held with its reason, and the ledger shows each item paid
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: pay approved invoices id: <team> /pay-approved-invoices v1
from: ref/fin/pay-approved-invoices v1
owner: <who> effective: <date>
trigger: <your payment calendar> in <your ERP> reaches a payment date for
a paying account
watch: record=<payment calendar> system=<your ERP>
change=<a payment date arrives>
concurrency: runs may overlap across paying accounts - one payment date
for one paying account is one run, an item belongs to one
run at a time, and an urgent payment outside the calendar is
a run of its own with the same checks
goal: every approved item that falls due before the next run paid the
right amount on time to the bank details on the payee's verified
record, the run approved by a named person who prepared none of it
and released by two named people under <your dual control rule> ,
every payment confirmed where it landed, each payee sent its
remittance advice, and each item recorded as paid in the ledger
phases:
open-run - system: the run opened with its payment date, the
paying account and the cutoff for items, from <your
payment calendar>
owner: payables-processor after: trigger
automation: <level>
gather-items - runs collect-and-report: every invoice approved at
ref/fin/process-a-supplier-invoice, every expense
claim approved at ref/fin/reimburse-an-expense-claim,
every refund approved at
ref/fin/apply-a-customer-payment or
ref/fin/resolve-a-billing-dispute, and the card
statement checked at
ref/fin/reconcile-company-card-spend, that falls
due before the next run, and every credit owed to
the company by a supplier in the run
owner: payables-processor
after: open-run automation: <level>
hold-items - runs assessment: each item that is disputed, on
hold, waiting on a change of bank details or
missing its approval kept out of the run with its
reason, and the person who can clear it told
owner: payables-processor
after: gather-items automation: <level>
propose-run - system: the run proposed at a version with each
item, its amount, its value date and each
early-payment discount worth taking under <your
payables policy>
owner: payables-processor
after: hold-items automation: <level>
check-cash - runs assessment: the run set against the balance in
the paying account and the day's cash position on
each value date, with any shortfall named by date
owner: treasury-analyst
after: propose-run automation: <level>
decide-what-waits - convenes decide-and-announce: <your treasurer role>
funds the paying account through
ref/fin/move-cash-between-accounts or chooses which
items wait, and records why
owner: <your treasurer role>
after: check-cash, when the cash will not cover the
run by: <hours> automation: never
approve-run - convenes approval: <your payment approver role> ,
who prepared none of the run, approves it at its
version with the items held and the cash check
beside it
owner: <your payment approver role>
after: check-cash, or decide-what-waits when it ran
by: <hours> automation: never
build-payment-file - system: one payment for each payee from the
approved run, to the bank details on the payee's
verified record, dated for its value date
owner: payables-processor
after: approve-run automation: <level>
check-payment-file - runs assessment: every payment in the file checked
against the approved items it pays, and every bank
account against <your verified bank record> , with
any supplier account changed since the last payment
to that supplier checked for its approval at
ref/fin/change-a-suppliers-bank-details
owner: wire-check
after: build-payment-file automation: <level>
release-payments - convenes approval: two people named in <your dual
control rule>, neither of whom prepared the run,
release the payment file in <your bank portal> in
time for each payment to land on its due date
owner: <your payment releaser role>
after: check-payment-file by: <hours>
automation: never
confirm-payments - runs collect-and-report: every payment matched to
the bank's report, and any payment returned,
rejected or sent to an account that has since
changed held aside with the reason
owner: wire-check after: release-payments
by: <hours> automation: <level>
handle-returned - runs assessment: each returned or rejected payment
held with the bank's reason, the supplier's
verified details checked again, <your payables lead
role> told the same day, and the item put back
among the approved items for a later run
owner: wire-check
after: confirm-payments, when a payment is returned
or rejected automation: <level>
send-remittance - system: each payee sent its remittance advice
through the contact on its record, naming the
amount, the date and each item and credit the
payment settles
owner: payables-processor
after: confirm-payments automation: <level>
record-in-ledger - system: each item marked paid in <your ERP> , and
the payments posted to <your general ledger> with
their totals agreed to the approved run
owner: payables-processor
after: send-remittance, and handle-returned when
one ran automation: <level>
update-cash - system: the released payments recorded in the
day's cash position and the cash forecast, with
each value date
owner: treasury-analyst
after: confirm-payments automation: <level>
record-learning - convenes debrief: which items were held and why,
which payments came back, which discounts were
missed, which payments were made outside the
calendar, and what the next run does differently
owner: payables-processor
after: record-in-ledger + update-cash
automation: <level>
run-scoped:
status - runs roll-call owner: payables-processor
every: <cadence>
from: open-run until: release-payments
payments - runs allocate-and-reconcile owner: wire-check
from: build-payment-file until: confirm-payments
handoffs:
open-run -> gather-items [payment-run]: the payment date, the paying
account and the cutoff for items
gather-items -> hold-items [items-due]: every approved invoice and
expense claim due before the next run, and the credits to take
hold-items -> propose-run [payable-items]: the items that can be paid,
and each item held with its reason
propose-run -> check-cash [proposed-run]: the items, the amounts, the
value dates and the discounts worth taking, at a version
check-cash -> approve-run [covered-run]: the run with the cash that
covers it on each value date
check-cash -> decide-what-waits [cash-short]: how far the cash falls
short, and on which date
decide-what-waits -> approve-run [funded-run]: the treasurer's decision,
with the transfer asked for or the items that wait, and the reason
approve-run -> build-payment-file [approved-run]: the run as approved,
with the approver and the date. A change to any item voids the
approval
build-payment-file -> check-payment-file [payment-file]: one payment for
each payee, at a version
check-payment-file -> release-payments [checked-payment-file]: the file
with every payment matched to its approved items and a verified
account
release-payments -> confirm-payments [released-payments]: the file
released, with its bank reference and the people who released it
confirm-payments -> send-remittance / update-cash [confirmed-payments]:
every payment matched to the bank's report
confirm-payments -> handle-returned [payment-exceptions]: each payment
returned or rejected, with the bank's reason
handle-returned -> record-in-ledger [returned-payments]: each returned
payment, its reason, and the run it goes back to
send-remittance -> record-in-ledger [remittances-sent]: each remittance
advice sent, and when
record-in-ledger -> record-learning [posted-payments]: each item marked
paid, and the payments posted
update-cash -> record-learning [cash-updated]: the run as it stands in
the day's position and the forecast
deviations:
check-cash -> decide-what-waits [cash-will-not-cover]: the cash in the
paying account will not cover the run on its value dates, so the
treasurer funds the account or chooses which items wait
decide-what-waits -> propose-run [items-taken-out]: the treasurer
chooses items to wait, so the run is proposed again without them
approve-run -> propose-run [approver-refuses-item]: the approver will
not approve an item, so it comes out with the reason and the run is
proposed again
check-payment-file -> build-payment-file [payment-does-not-match]: a
payment does not match its approved items or the account is not on
the verified record, so that payment is held and the file is built
again
confirm-payments -> handle-returned [payment-returned]: a payment is
returned or rejected, so it is held with the reason and paid again
only to verified details in a later run
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for <your treasurer role> , <your
payment approver role>, the two payment releasers and <your
payables lead role>>
systems: <your ERP> (write), <your bank portal> (read), <your verified
bank record> (read), the cash position (write), <your general
ledger> (write), the notification channel (write)
data: <your payment calendar> <version> , <your payables policy>
<version> , <your dual control rule> <version> , <your
delegation of authority> <version>
policy:
no payment file is built before a named approver who prepared none of
the run has approved it, and a change to any item after approval
voids the approval
money is released by two named people in <your bank portal> under
<your dual control rule> , neither of whom prepared the run, and the
release is never delegated to an agent
every payment goes to the bank details on the payee's verified record,
and a supplier account changed since the last payment is paid only
once ref/fin/change-a-suppliers-bank-details has approved the change
an item that is disputed, on hold or waiting on a change of bank
details stays out of the run with its reason
a payment outside the payment calendar passes the same checks, the
same approval and the same two releasers as a run on the calendar
the agents release no money and hold no access that would let them
release it
a returned or rejected payment is paid again only to verified details
and only in a run a named approver has approved
when the cash will not cover the run, <your treasurer role> decides
which items wait, and each supplier affected is told when it will be
paid
measures:
cycle time: <hours> from the run proposed to the payments released
on time: <target> share of approved items paid by their due date
volume: <payments per run>
quality gate: every payment traces to an approved item, a verified bank
record and two named releasers, neither of whom prepared
the run
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
345 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: pay approved invoices id: <team>/pay-approved-invoices v1
from: ref/fin/pay-approved-invoices v1
owner: <who> effective: <date>
trigger: <your payment calendar> in <your ERP> reaches a payment date for
a paying account
watch: record=<payment calendar> system=<your ERP>
change=<a payment date arrives>
concurrency: runs may overlap across paying accounts - one payment date
for one paying account is one run, an item belongs to one
run at a time, and an urgent payment outside the calendar is
a run of its own with the same checks
goal: every approved item that falls due before the next run paid the
right amount on time to the bank details on the payee's verified
record, the run approved by a named person who prepared none of it
and released by two named people under <your dual control rule>,
every payment confirmed where it landed, each payee sent its
remittance advice, and each item recorded as paid in the ledger
phases:
open-run - system: the run opened with its payment date, the
paying account and the cutoff for items, from <your
payment calendar>
owner: payables-processor after: trigger
automation: <level>
gather-items - runs collect-and-report: every invoice approved at
ref/fin/process-a-supplier-invoice, every expense
claim approved at ref/fin/reimburse-an-expense-claim,
every refund approved at
ref/fin/apply-a-customer-payment or
ref/fin/resolve-a-billing-dispute, and the card
statement checked at
ref/fin/reconcile-company-card-spend, that falls
due before the next run, and every credit owed to
the company by a supplier in the run
owner: payables-processor
after: open-run automation: <level>
hold-items - runs assessment: each item that is disputed, on
hold, waiting on a change of bank details or
missing its approval kept out of the run with its
reason, and the person who can clear it told
owner: payables-processor
after: gather-items automation: <level>
propose-run - system: the run proposed at a version with each
item, its amount, its value date and each
early-payment discount worth taking under <your
payables policy>
owner: payables-processor
after: hold-items automation: <level>
check-cash - runs assessment: the run set against the balance in
the paying account and the day's cash position on
each value date, with any shortfall named by date
owner: treasury-analyst
after: propose-run automation: <level>
decide-what-waits - convenes decide-and-announce: <your treasurer role>
funds the paying account through
ref/fin/move-cash-between-accounts or chooses which
items wait, and records why
owner: <your treasurer role>
after: check-cash, when the cash will not cover the
run by: <hours> automation: never
approve-run - convenes approval: <your payment approver role>,
who prepared none of the run, approves it at its
version with the items held and the cash check
beside it
owner: <your payment approver role>
after: check-cash, or decide-what-waits when it ran
by: <hours> automation: never
build-payment-file - system: one payment for each payee from the
approved run, to the bank details on the payee's
verified record, dated for its value date
owner: payables-processor
after: approve-run automation: <level>
check-payment-file - runs assessment: every payment in the file checked
against the approved items it pays, and every bank
account against <your verified bank record>, with
any supplier account changed since the last payment
to that supplier checked for its approval at
ref/fin/change-a-suppliers-bank-details
owner: wire-check
after: build-payment-file automation: <level>
release-payments - convenes approval: two people named in <your dual
control rule>, neither of whom prepared the run,
release the payment file in <your bank portal> in
time for each payment to land on its due date
owner: <your payment releaser role>
after: check-payment-file by: <hours>
automation: never
confirm-payments - runs collect-and-report: every payment matched to
the bank's report, and any payment returned,
rejected or sent to an account that has since
changed held aside with the reason
owner: wire-check after: release-payments
by: <hours> automation: <level>
handle-returned - runs assessment: each returned or rejected payment
held with the bank's reason, the supplier's
verified details checked again, <your payables lead
role> told the same day, and the item put back
among the approved items for a later run
owner: wire-check
after: confirm-payments, when a payment is returned
or rejected automation: <level>
send-remittance - system: each payee sent its remittance advice
through the contact on its record, naming the
amount, the date and each item and credit the
payment settles
owner: payables-processor
after: confirm-payments automation: <level>
record-in-ledger - system: each item marked paid in <your ERP>, and
the payments posted to <your general ledger> with
their totals agreed to the approved run
owner: payables-processor
after: send-remittance, and handle-returned when
one ran automation: <level>
update-cash - system: the released payments recorded in the
day's cash position and the cash forecast, with
each value date
owner: treasury-analyst
after: confirm-payments automation: <level>
record-learning - convenes debrief: which items were held and why,
which payments came back, which discounts were
missed, which payments were made outside the
calendar, and what the next run does differently
owner: payables-processor
after: record-in-ledger + update-cash
automation: <level>
run-scoped:
status - runs roll-call owner: payables-processor
every: <cadence>
from: open-run until: release-payments
payments - runs allocate-and-reconcile owner: wire-check
from: build-payment-file until: confirm-payments
handoffs:
open-run -> gather-items [payment-run]: the payment date, the paying
account and the cutoff for items
gather-items -> hold-items [items-due]: every approved invoice and
expense claim due before the next run, and the credits to take
hold-items -> propose-run [payable-items]: the items that can be paid,
and each item held with its reason
propose-run -> check-cash [proposed-run]: the items, the amounts, the
value dates and the discounts worth taking, at a version
check-cash -> approve-run [covered-run]: the run with the cash that
covers it on each value date
check-cash -> decide-what-waits [cash-short]: how far the cash falls
short, and on which date
decide-what-waits -> approve-run [funded-run]: the treasurer's decision,
with the transfer asked for or the items that wait, and the reason
approve-run -> build-payment-file [approved-run]: the run as approved,
with the approver and the date. A change to any item voids the
approval
build-payment-file -> check-payment-file [payment-file]: one payment for
each payee, at a version
check-payment-file -> release-payments [checked-payment-file]: the file
with every payment matched to its approved items and a verified
account
release-payments -> confirm-payments [released-payments]: the file
released, with its bank reference and the people who released it
confirm-payments -> send-remittance / update-cash [confirmed-payments]:
every payment matched to the bank's report
confirm-payments -> handle-returned [payment-exceptions]: each payment
returned or rejected, with the bank's reason
handle-returned -> record-in-ledger [returned-payments]: each returned
payment, its reason, and the run it goes back to
send-remittance -> record-in-ledger [remittances-sent]: each remittance
advice sent, and when
record-in-ledger -> record-learning [posted-payments]: each item marked
paid, and the payments posted
update-cash -> record-learning [cash-updated]: the run as it stands in
the day's position and the forecast
deviations:
check-cash -> decide-what-waits [cash-will-not-cover]: the cash in the
paying account will not cover the run on its value dates, so the
treasurer funds the account or chooses which items wait
decide-what-waits -> propose-run [items-taken-out]: the treasurer
chooses items to wait, so the run is proposed again without them
approve-run -> propose-run [approver-refuses-item]: the approver will
not approve an item, so it comes out with the reason and the run is
proposed again
check-payment-file -> build-payment-file [payment-does-not-match]: a
payment does not match its approved items or the account is not on
the verified record, so that payment is held and the file is built
again
confirm-payments -> handle-returned [payment-returned]: a payment is
returned or rejected, so it is held with the reason and paid again
only to verified details in a later run
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for <your treasurer role>, <your
payment approver role>, the two payment releasers and <your
payables lead role>>
systems: <your ERP> (write), <your bank portal> (read), <your verified
bank record> (read), the cash position (write), <your general
ledger> (write), the notification channel (write)
data: <your payment calendar> <version>, <your payables policy>
<version>, <your dual control rule> <version>, <your
delegation of authority> <version>
policy:
no payment file is built before a named approver who prepared none of
the run has approved it, and a change to any item after approval
voids the approval
money is released by two named people in <your bank portal> under
<your dual control rule>, neither of whom prepared the run, and the
release is never delegated to an agent
every payment goes to the bank details on the payee's verified record,
and a supplier account changed since the last payment is paid only
once ref/fin/change-a-suppliers-bank-details has approved the change
an item that is disputed, on hold or waiting on a change of bank
details stays out of the run with its reason
a payment outside the payment calendar passes the same checks, the
same approval and the same two releasers as a run on the calendar
the agents release no money and hold no access that would let them
release it
a returned or rejected payment is paid again only to verified details
and only in a run a named approver has approved
when the cash will not cover the run, <your treasurer role> decides
which items wait, and each supplier affected is told when it will be
paid
measures:
cycle time: <hours> from the run proposed to the payments released
on time: <target> share of approved items paid by their due date
volume: <payments per run>
quality gate: every payment traces to an approved item, a verified bank
record and two named releasers, neither of whom prepared
the run
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
400 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: pay approved invoices id: <team>/pay-approved-invoices v1
from: ref/fin/pay-approved-invoices v1
owner: <who> effective: <date>
trigger: <your payment calendar> in <your ERP> reaches a payment date for
a paying account
watch: record=<payment calendar> system=<your ERP>
change=<a payment date arrives>
concurrency: runs may overlap across paying accounts - one payment date
for one paying account is one run, an item belongs to one
run at a time, and an urgent payment outside the calendar is
a run of its own with the same checks
goal: every approved item that falls due before the next run paid the
right amount on time to the bank details on the payee's verified
record, the run approved by a named person who prepared none of it
and released by two named people under <your dual control rule>,
every payment confirmed where it landed, each payee sent its
remittance advice, and each item recorded as paid in the ledger
phases:
open-run - system: the run opened with its payment date, the
paying account and the cutoff for items, from <your
payment calendar>
owner: payables-processor after: trigger
automation: <level>
gather-items - runs collect-and-report: every invoice approved at
ref/fin/process-a-supplier-invoice, every expense
claim approved at ref/fin/reimburse-an-expense-claim,
every refund approved at
ref/fin/apply-a-customer-payment or
ref/fin/resolve-a-billing-dispute, and the card
statement checked at
ref/fin/reconcile-company-card-spend, that falls
due before the next run, and every credit owed to
the company by a supplier in the run
owner: payables-processor
after: open-run automation: <level>
hold-items - runs assessment: each item that is disputed, on
hold, waiting on a change of bank details or
missing its approval kept out of the run with its
reason, and the person who can clear it told
owner: payables-processor
after: gather-items automation: <level>
propose-run - system: the run proposed at a version with each
item, its amount, its value date and each
early-payment discount worth taking under <your
payables policy>
owner: payables-processor
after: hold-items automation: <level>
check-cash - runs assessment: the run set against the balance in
the paying account and the day's cash position on
each value date, with any shortfall named by date
owner: treasury-analyst
after: propose-run automation: <level>
decide-what-waits - convenes decide-and-announce: <your treasurer role>
funds the paying account through
ref/fin/move-cash-between-accounts or chooses which
items wait, and records why
owner: <your treasurer role>
after: check-cash, when the cash will not cover the
run by: <hours> automation: never
approve-run - convenes approval: <your payment approver role>,
who prepared none of the run, approves it at its
version with the items held and the cash check
beside it
owner: <your payment approver role>
after: check-cash, or decide-what-waits when it ran
by: <hours> automation: never
build-payment-file - system: one payment for each payee from the
approved run, to the bank details on the payee's
verified record, dated for its value date
owner: payables-processor
after: approve-run automation: <level>
check-payment-file - runs assessment: every payment in the file checked
against the approved items it pays, and every bank
account against <your verified bank record>, with
any supplier account changed since the last payment
to that supplier checked for its approval at
ref/fin/change-a-suppliers-bank-details
owner: wire-check
after: build-payment-file automation: <level>
release-payments - convenes approval: two people named in <your dual
control rule>, neither of whom prepared the run,
release the payment file in <your bank portal> in
time for each payment to land on its due date
owner: <your payment releaser role>
after: check-payment-file by: <hours>
automation: never
confirm-payments - runs collect-and-report: every payment matched to
the bank's report, and any payment returned,
rejected or sent to an account that has since
changed held aside with the reason
owner: wire-check after: release-payments
by: <hours> automation: <level>
handle-returned - runs assessment: each returned or rejected payment
held with the bank's reason, the supplier's
verified details checked again, <your payables lead
role> told the same day, and the item put back
among the approved items for a later run
owner: wire-check
after: confirm-payments, when a payment is returned
or rejected automation: <level>
send-remittance - system: each payee sent its remittance advice
through the contact on its record, naming the
amount, the date and each item and credit the
payment settles
owner: payables-processor
after: confirm-payments automation: <level>
record-in-ledger - system: each item marked paid in <your ERP>, and
the payments posted to <your general ledger> with
their totals agreed to the approved run
owner: payables-processor
after: send-remittance, and handle-returned when
one ran automation: <level>
update-cash - system: the released payments recorded in the
day's cash position and the cash forecast, with
each value date
owner: treasury-analyst
after: confirm-payments automation: <level>
record-learning - convenes debrief: which items were held and why,
which payments came back, which discounts were
missed, which payments were made outside the
calendar, and what the next run does differently
owner: payables-processor
after: record-in-ledger + update-cash
automation: <level>
run-scoped:
status - runs roll-call owner: payables-processor
every: <cadence>
from: open-run until: release-payments
payments - runs allocate-and-reconcile owner: wire-check
from: build-payment-file until: confirm-payments
handoffs:
open-run -> gather-items [payment-run]: the payment date, the paying
account and the cutoff for items
gather-items -> hold-items [items-due]: every approved invoice and
expense claim due before the next run, and the credits to take
hold-items -> propose-run [payable-items]: the items that can be paid,
and each item held with its reason
propose-run -> check-cash [proposed-run]: the items, the amounts, the
value dates and the discounts worth taking, at a version
check-cash -> approve-run [covered-run]: the run with the cash that
covers it on each value date
check-cash -> decide-what-waits [cash-short]: how far the cash falls
short, and on which date
decide-what-waits -> approve-run [funded-run]: the treasurer's decision,
with the transfer asked for or the items that wait, and the reason
approve-run -> build-payment-file [approved-run]: the run as approved,
with the approver and the date. A change to any item voids the
approval
build-payment-file -> check-payment-file [payment-file]: one payment for
each payee, at a version
check-payment-file -> release-payments [checked-payment-file]: the file
with every payment matched to its approved items and a verified
account
release-payments -> confirm-payments [released-payments]: the file
released, with its bank reference and the people who released it
confirm-payments -> send-remittance / update-cash [confirmed-payments]:
every payment matched to the bank's report
confirm-payments -> handle-returned [payment-exceptions]: each payment
returned or rejected, with the bank's reason
handle-returned -> record-in-ledger [returned-payments]: each returned
payment, its reason, and the run it goes back to
send-remittance -> record-in-ledger [remittances-sent]: each remittance
advice sent, and when
record-in-ledger -> record-learning [posted-payments]: each item marked
paid, and the payments posted
update-cash -> record-learning [cash-updated]: the run as it stands in
the day's position and the forecast
deviations:
check-cash -> decide-what-waits [cash-will-not-cover]: the cash in the
paying account will not cover the run on its value dates, so the
treasurer funds the account or chooses which items wait
decide-what-waits -> propose-run [items-taken-out]: the treasurer
chooses items to wait, so the run is proposed again without them
approve-run -> propose-run [approver-refuses-item]: the approver will
not approve an item, so it comes out with the reason and the run is
proposed again
check-payment-file -> build-payment-file [payment-does-not-match]: a
payment does not match its approved items or the account is not on
the verified record, so that payment is held and the file is built
again
confirm-payments -> handle-returned [payment-returned]: a payment is
returned or rejected, so it is held with the reason and paid again
only to verified details in a later run
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for <your treasurer role>, <your
payment approver role>, the two payment releasers and <your
payables lead role>>
systems: <your ERP> (write), <your bank portal> (read), <your verified
bank record> (read), the cash position (write), <your general
ledger> (write), the notification channel (write)
data: <your payment calendar> <version>, <your payables policy>
<version>, <your dual control rule> <version>, <your
delegation of authority> <version>
policy:
no payment file is built before a named approver who prepared none of
the run has approved it, and a change to any item after approval
voids the approval
money is released by two named people in <your bank portal> under
<your dual control rule>, neither of whom prepared the run, and the
release is never delegated to an agent
every payment goes to the bank details on the payee's verified record,
and a supplier account changed since the last payment is paid only
once ref/fin/change-a-suppliers-bank-details has approved the change
an item that is disputed, on hold or waiting on a change of bank
details stays out of the run with its reason
a payment outside the payment calendar passes the same checks, the
same approval and the same two releasers as a run on the calendar
the agents release no money and hold no access that would let them
release it
a returned or rejected payment is paid again only to verified details
and only in a run a named approver has approved
when the cash will not cover the run, <your treasurer role> decides
which items wait, and each supplier affected is told when it will be
paid
measures:
cycle time: <hours> from the run proposed to the payments released
on time: <target> share of approved items paid by their due date
volume: <payments per run>
quality gate: every payment traces to an approved item, a verified bank
record and two named releasers, neither of whom prepared
the run
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
405 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: pay approved invoices id: <team>/pay-approved-invoices v1
from: ref/fin/pay-approved-invoices v1
owner: <who> effective: <date>
trigger: <your payment calendar> in <your ERP> reaches a payment date for
a paying account
watch: record=<payment calendar> system=<your ERP>
change=<a payment date arrives>
concurrency: runs may overlap across paying accounts - one payment date
for one paying account is one run, an item belongs to one
run at a time, and an urgent payment outside the calendar is
a run of its own with the same checks
goal: every approved item that falls due before the next run paid the
right amount on time to the bank details on the payee's verified
record, the run approved by a named person who prepared none of it
and released by two named people under <your dual control rule>,
every payment confirmed where it landed, each payee sent its
remittance advice, and each item recorded as paid in the ledger
phases:
open-run - system: the run opened with its payment date, the
paying account and the cutoff for items, from <your
payment calendar>
owner: payables-processor after: trigger
automation: <level>
gather-items - runs collect-and-report: every invoice approved at
ref/fin/process-a-supplier-invoice, every expense
claim approved at ref/fin/reimburse-an-expense-claim,
every refund approved at
ref/fin/apply-a-customer-payment or
ref/fin/resolve-a-billing-dispute, and the card
statement checked at
ref/fin/reconcile-company-card-spend, that falls
due before the next run, and every credit owed to
the company by a supplier in the run
owner: payables-processor
after: open-run automation: <level>
hold-items - runs assessment: each item that is disputed, on
hold, waiting on a change of bank details or
missing its approval kept out of the run with its
reason, and the person who can clear it told
owner: payables-processor
after: gather-items automation: <level>
propose-run - system: the run proposed at a version with each
item, its amount, its value date and each
early-payment discount worth taking under <your
payables policy>
owner: payables-processor
after: hold-items automation: <level>
check-cash - runs assessment: the run set against the balance in
the paying account and the day's cash position on
each value date, with any shortfall named by date
owner: treasury-analyst
after: propose-run automation: <level>
decide-what-waits - convenes decide-and-announce: <your treasurer role>
funds the paying account through
ref/fin/move-cash-between-accounts or chooses which
items wait, and records why
owner: <your treasurer role>
after: check-cash, when the cash will not cover the
run by: <hours> automation: never
approve-run - convenes approval: <your payment approver role>,
who prepared none of the run, approves it at its
version with the items held and the cash check
beside it
owner: <your payment approver role>
after: check-cash, or decide-what-waits when it ran
by: <hours> automation: never
build-payment-file - system: one payment for each payee from the
approved run, to the bank details on the payee's
verified record, dated for its value date
owner: payables-processor
after: approve-run automation: <level>
check-payment-file - runs assessment: every payment in the file checked
against the approved items it pays, and every bank
account against <your verified bank record>, with
any supplier account changed since the last payment
to that supplier checked for its approval at
ref/fin/change-a-suppliers-bank-details
owner: wire-check
after: build-payment-file automation: <level>
release-payments - convenes approval: two people named in <your dual
control rule>, neither of whom prepared the run,
release the payment file in <your bank portal> in
time for each payment to land on its due date
owner: <your payment releaser role>
after: check-payment-file by: <hours>
automation: never
confirm-payments - runs collect-and-report: every payment matched to
the bank's report, and any payment returned,
rejected or sent to an account that has since
changed held aside with the reason
owner: wire-check after: release-payments
by: <hours> automation: <level>
handle-returned - runs assessment: each returned or rejected payment
held with the bank's reason, the supplier's
verified details checked again, <your payables lead
role> told the same day, and the item put back
among the approved items for a later run
owner: wire-check
after: confirm-payments, when a payment is returned
or rejected automation: <level>
send-remittance - system: each payee sent its remittance advice
through the contact on its record, naming the
amount, the date and each item and credit the
payment settles
owner: payables-processor
after: confirm-payments automation: <level>
record-in-ledger - system: each item marked paid in <your ERP>, and
the payments posted to <your general ledger> with
their totals agreed to the approved run
owner: payables-processor
after: send-remittance, and handle-returned when
one ran automation: <level>
update-cash - system: the released payments recorded in the
day's cash position and the cash forecast, with
each value date
owner: treasury-analyst
after: confirm-payments automation: <level>
record-learning - convenes debrief: which items were held and why,
which payments came back, which discounts were
missed, which payments were made outside the
calendar, and what the next run does differently
owner: payables-processor
after: record-in-ledger + update-cash
automation: <level>
run-scoped:
status - runs roll-call owner: payables-processor
every: <cadence>
from: open-run until: release-payments
payments - runs allocate-and-reconcile owner: wire-check
from: build-payment-file until: confirm-payments
handoffs:
open-run -> gather-items [payment-run]: the payment date, the paying
account and the cutoff for items
gather-items -> hold-items [items-due]: every approved invoice and
expense claim due before the next run, and the credits to take
hold-items -> propose-run [payable-items]: the items that can be paid,
and each item held with its reason
propose-run -> check-cash [proposed-run]: the items, the amounts, the
value dates and the discounts worth taking, at a version
check-cash -> approve-run [covered-run]: the run with the cash that
covers it on each value date
check-cash -> decide-what-waits [cash-short]: how far the cash falls
short, and on which date
decide-what-waits -> approve-run [funded-run]: the treasurer's decision,
with the transfer asked for or the items that wait, and the reason
approve-run -> build-payment-file [approved-run]: the run as approved,
with the approver and the date. A change to any item voids the
approval
build-payment-file -> check-payment-file [payment-file]: one payment for
each payee, at a version
check-payment-file -> release-payments [checked-payment-file]: the file
with every payment matched to its approved items and a verified
account
release-payments -> confirm-payments [released-payments]: the file
released, with its bank reference and the people who released it
confirm-payments -> send-remittance / update-cash [confirmed-payments]:
every payment matched to the bank's report
confirm-payments -> handle-returned [payment-exceptions]: each payment
returned or rejected, with the bank's reason
handle-returned -> record-in-ledger [returned-payments]: each returned
payment, its reason, and the run it goes back to
send-remittance -> record-in-ledger [remittances-sent]: each remittance
advice sent, and when
record-in-ledger -> record-learning [posted-payments]: each item marked
paid, and the payments posted
update-cash -> record-learning [cash-updated]: the run as it stands in
the day's position and the forecast
deviations:
check-cash -> decide-what-waits [cash-will-not-cover]: the cash in the
paying account will not cover the run on its value dates, so the
treasurer funds the account or chooses which items wait
decide-what-waits -> propose-run [items-taken-out]: the treasurer
chooses items to wait, so the run is proposed again without them
approve-run -> propose-run [approver-refuses-item]: the approver will
not approve an item, so it comes out with the reason and the run is
proposed again
check-payment-file -> build-payment-file [payment-does-not-match]: a
payment does not match its approved items or the account is not on
the verified record, so that payment is held and the file is built
again
confirm-payments -> handle-returned [payment-returned]: a payment is
returned or rejected, so it is held with the reason and paid again
only to verified details in a later run
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for <your treasurer role>, <your
payment approver role>, the two payment releasers and <your
payables lead role>>
systems: <your ERP> (write), <your bank portal> (read), <your verified
bank record> (read), the cash position (write), <your general
ledger> (write), the notification channel (write)
data: <your payment calendar> <version>, <your payables policy>
<version>, <your dual control rule> <version>, <your
delegation of authority> <version>
policy:
no payment file is built before a named approver who prepared none of
the run has approved it, and a change to any item after approval
voids the approval
money is released by two named people in <your bank portal> under
<your dual control rule>, neither of whom prepared the run, and the
release is never delegated to an agent
every payment goes to the bank details on the payee's verified record,
and a supplier account changed since the last payment is paid only
once ref/fin/change-a-suppliers-bank-details has approved the change
an item that is disputed, on hold or waiting on a change of bank
details stays out of the run with its reason
a payment outside the payment calendar passes the same checks, the
same approval and the same two releasers as a run on the calendar
the agents release no money and hold no access that would let them
release it
a returned or rejected payment is paid again only to verified details
and only in a run a named approver has approved
when the cash will not cover the run, <your treasurer role> decides
which items wait, and each supplier affected is told when it will be
paid
measures:
cycle time: <hours> from the run proposed to the payments released
on time: <target> share of approved items paid by their due date
volume: <payments per run>
quality gate: every payment traces to an approved item, a verified bank
record and two named releasers, neither of whom prepared
the run
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
396 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: pay approved invoices id: <team>/pay-approved-invoices v1
from: ref/fin/pay-approved-invoices v1
owner: <who> effective: <date>
trigger: <your payment calendar> in <your ERP> reaches a payment date for
a paying account
watch: record=<payment calendar> system=<your ERP>
change=<a payment date arrives>
concurrency: runs may overlap across paying accounts - one payment date
for one paying account is one run, an item belongs to one
run at a time, and an urgent payment outside the calendar is
a run of its own with the same checks
goal: every approved item that falls due before the next run paid the
right amount on time to the bank details on the payee's verified
record, the run approved by a named person who prepared none of it
and released by two named people under <your dual control rule>,
every payment confirmed where it landed, each payee sent its
remittance advice, and each item recorded as paid in the ledger
phases:
open-run - system: the run opened with its payment date, the
paying account and the cutoff for items, from <your
payment calendar>
owner: payables-processor after: trigger
automation: <level>
gather-items - runs collect-and-report: every invoice approved at
ref/fin/process-a-supplier-invoice, every expense
claim approved at ref/fin/reimburse-an-expense-claim,
every refund approved at
ref/fin/apply-a-customer-payment or
ref/fin/resolve-a-billing-dispute, and the card
statement checked at
ref/fin/reconcile-company-card-spend, that falls
due before the next run, and every credit owed to
the company by a supplier in the run
owner: payables-processor
after: open-run automation: <level>
hold-items - runs assessment: each item that is disputed, on
hold, waiting on a change of bank details or
missing its approval kept out of the run with its
reason, and the person who can clear it told
owner: payables-processor
after: gather-items automation: <level>
propose-run - system: the run proposed at a version with each
item, its amount, its value date and each
early-payment discount worth taking under <your
payables policy>
owner: payables-processor
after: hold-items automation: <level>
check-cash - runs assessment: the run set against the balance in
the paying account and the day's cash position on
each value date, with any shortfall named by date
owner: treasury-analyst
after: propose-run automation: <level>
decide-what-waits - convenes decide-and-announce: <your treasurer role>
funds the paying account through
ref/fin/move-cash-between-accounts or chooses which
items wait, and records why
owner: <your treasurer role>
after: check-cash, when the cash will not cover the
run by: <hours> automation: never
approve-run - convenes approval: <your payment approver role>,
who prepared none of the run, approves it at its
version with the items held and the cash check
beside it
owner: <your payment approver role>
after: check-cash, or decide-what-waits when it ran
by: <hours> automation: never
build-payment-file - system: one payment for each payee from the
approved run, to the bank details on the payee's
verified record, dated for its value date
owner: payables-processor
after: approve-run automation: <level>
check-payment-file - runs assessment: every payment in the file checked
against the approved items it pays, and every bank
account against <your verified bank record>, with
any supplier account changed since the last payment
to that supplier checked for its approval at
ref/fin/change-a-suppliers-bank-details
owner: wire-check
after: build-payment-file automation: <level>
release-payments - convenes approval: two people named in <your dual
control rule>, neither of whom prepared the run,
release the payment file in <your bank portal> in
time for each payment to land on its due date
owner: <your payment releaser role>
after: check-payment-file by: <hours>
automation: never
confirm-payments - runs collect-and-report: every payment matched to
the bank's report, and any payment returned,
rejected or sent to an account that has since
changed held aside with the reason
owner: wire-check after: release-payments
by: <hours> automation: <level>
handle-returned - runs assessment: each returned or rejected payment
held with the bank's reason, the supplier's
verified details checked again, <your payables lead
role> told the same day, and the item put back
among the approved items for a later run
owner: wire-check
after: confirm-payments, when a payment is returned
or rejected automation: <level>
send-remittance - system: each payee sent its remittance advice
through the contact on its record, naming the
amount, the date and each item and credit the
payment settles
owner: payables-processor
after: confirm-payments automation: <level>
record-in-ledger - system: each item marked paid in <your ERP>, and
the payments posted to <your general ledger> with
their totals agreed to the approved run
owner: payables-processor
after: send-remittance, and handle-returned when
one ran automation: <level>
update-cash - system: the released payments recorded in the
day's cash position and the cash forecast, with
each value date
owner: treasury-analyst
after: confirm-payments automation: <level>
record-learning - convenes debrief: which items were held and why,
which payments came back, which discounts were
missed, which payments were made outside the
calendar, and what the next run does differently
owner: payables-processor
after: record-in-ledger + update-cash
automation: <level>
run-scoped:
status - runs roll-call owner: payables-processor
every: <cadence>
from: open-run until: release-payments
payments - runs allocate-and-reconcile owner: wire-check
from: build-payment-file until: confirm-payments
handoffs:
open-run -> gather-items [payment-run]: the payment date, the paying
account and the cutoff for items
gather-items -> hold-items [items-due]: every approved invoice and
expense claim due before the next run, and the credits to take
hold-items -> propose-run [payable-items]: the items that can be paid,
and each item held with its reason
propose-run -> check-cash [proposed-run]: the items, the amounts, the
value dates and the discounts worth taking, at a version
check-cash -> approve-run [covered-run]: the run with the cash that
covers it on each value date
check-cash -> decide-what-waits [cash-short]: how far the cash falls
short, and on which date
decide-what-waits -> approve-run [funded-run]: the treasurer's decision,
with the transfer asked for or the items that wait, and the reason
approve-run -> build-payment-file [approved-run]: the run as approved,
with the approver and the date. A change to any item voids the
approval
build-payment-file -> check-payment-file [payment-file]: one payment for
each payee, at a version
check-payment-file -> release-payments [checked-payment-file]: the file
with every payment matched to its approved items and a verified
account
release-payments -> confirm-payments [released-payments]: the file
released, with its bank reference and the people who released it
confirm-payments -> send-remittance / update-cash [confirmed-payments]:
every payment matched to the bank's report
confirm-payments -> handle-returned [payment-exceptions]: each payment
returned or rejected, with the bank's reason
handle-returned -> record-in-ledger [returned-payments]: each returned
payment, its reason, and the run it goes back to
send-remittance -> record-in-ledger [remittances-sent]: each remittance
advice sent, and when
record-in-ledger -> record-learning [posted-payments]: each item marked
paid, and the payments posted
update-cash -> record-learning [cash-updated]: the run as it stands in
the day's position and the forecast
deviations:
check-cash -> decide-what-waits [cash-will-not-cover]: the cash in the
paying account will not cover the run on its value dates, so the
treasurer funds the account or chooses which items wait
decide-what-waits -> propose-run [items-taken-out]: the treasurer
chooses items to wait, so the run is proposed again without them
approve-run -> propose-run [approver-refuses-item]: the approver will
not approve an item, so it comes out with the reason and the run is
proposed again
check-payment-file -> build-payment-file [payment-does-not-match]: a
payment does not match its approved items or the account is not on
the verified record, so that payment is held and the file is built
again
confirm-payments -> handle-returned [payment-returned]: a payment is
returned or rejected, so it is held with the reason and paid again
only to verified details in a later run
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for <your treasurer role>, <your
payment approver role>, the two payment releasers and <your
payables lead role>>
systems: <your ERP> (write), <your bank portal> (read), <your verified
bank record> (read), the cash position (write), <your general
ledger> (write), the notification channel (write)
data: <your payment calendar> <version>, <your payables policy>
<version>, <your dual control rule> <version>, <your
delegation of authority> <version>
policy:
no payment file is built before a named approver who prepared none of
the run has approved it, and a change to any item after approval
voids the approval
money is released by two named people in <your bank portal> under
<your dual control rule>, neither of whom prepared the run, and the
release is never delegated to an agent
every payment goes to the bank details on the payee's verified record,
and a supplier account changed since the last payment is paid only
once ref/fin/change-a-suppliers-bank-details has approved the change
an item that is disputed, on hold or waiting on a change of bank
details stays out of the run with its reason
a payment outside the payment calendar passes the same checks, the
same approval and the same two releasers as a run on the calendar
the agents release no money and hold no access that would let them
release it
a returned or rejected payment is paid again only to verified details
and only in a run a named approver has approved
when the cash will not cover the run, <your treasurer role> decides
which items wait, and each supplier affected is told when it will be
paid
measures:
cycle time: <hours> from the run proposed to the payments released
on time: <target> share of approved items paid by their due date
volume: <payments per run>
quality gate: every payment traces to an approved item, a verified bank
record and two named releasers, neither of whom prepared
the run
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
52 blanks to fill. Everything else is the process.
this process
from: ref/fin/pay-approved-invoices v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.