A month has ended, and the books have to be closed on the calendar so the results can be reported and relied on. The close-plan-keeper agent opens the close calendar at its version with one owner and one day on every task, announces the cutoff for each sub-ledger and each team, and chases every task past its day. The owners of the payables, receivables, asset, lease, payroll and revenue sub-ledgers close them. The ledger-accountant agent books the period's accruals and posts the close journals, each approved by a named person who did not prepare it, and the account-reconciler agent reconciles every account on the reconciliation list for a named reviewer to sign off. The reporting-accountant agent sets each account in each entity beside the last period and flags each movement above `<your threshold>` that nobody has explained, each account owner explains a flagged movement with its evidence, and an error found is corrected by an entry approved like any other. The controller reviews the close, signs it off and closes the period to entries. The run closes when every task on the calendar is done and reviewed, every reconciliation is signed off, every flagged movement is explained, the controller's sign-off is recorded, and the closed books have gone to consolidation and to the monthly results.
The goals
Close each month within 5 working days of its end
Have 100% of reconciliations reviewed before the sign-off
Reopen zero closed months
Keep the close under 300 hours of team time each month
They pull against each other, so pushing one too hard costs another. The marked figures are suggested targets for you to set.
The walk
The document
One run
Adoption
The activities
What happens in a run
15 activities from a month ends on the close calendar to the close is signed off and the closed books have gone on, 4 of them gates a person has to sign.
Close the Month a month ends on the close calendar → the close is signed off and the closed books have gone on
a date moves and the tasks behind it move too a movement is an error the correction touches a reconciled account the controller finds a task not done or not reviewed a month ends on the close calendar 1 Open the Close Calendar every task with one owner and one day, at its version 2 Announce the Cutoffs the last day for entries from each sub-ledger and each team 3 Close the Sub-Ledgers payables, receivables, assets, leases, payroll and revenue a person signs · never an agent 4 Book the Accruals the period-end accruals, reviewed and posted 5 Post the Close Journals allocations, reclassifications, corrections, each approved 6 Reconcile the Accounts every listed account, prepared and reviewed 7 Chase the Late Tasks each task past its day chased with its owner, or re-dated 8 Compare With the Last Period each account against last period, large movements flagged 9 Explain Each Movement each flagged movement explained by its owner with evidence a person signs · never an agent 10 Correct What the Check Found an entry that corrects an error, approved like any other 11 Review the Close the reconciliations, journals and explained movements a person signs · never an agent 12 Sign Off the Close the controller signs off and closes the period to entries a person signs · never an agent 13 Record the Sign-Off the version signed, who signed it and when 14 Hand On the Closed Books the closed trial balance, to consolidation and the results 15 Record What the Close Taught the tasks that slipped and why, and what next month changes the close is signed off and the closed books have gone on
The roster this process needs
Hover a name to see the activities it holds. A dashed one is a person, and stays one.
The document
The document, with the blanks marked
Everything in amber is yours to fill in: who owns it, when it takes effect, which platforms, which numbers, and who holds each activity. Everything else is the process, and it is the same wherever it is run.
Use in LangGraph
Use in Agent Framework
Use in CrewAI
Use in Google ADK
PROCESS: close the month id: <team> /close-the-month v1
from: ref/fin/close-the-month v1
owner: <who> effective: <date>
trigger: a month of an entity reaches its end on <your close calendar>
watch: record=<accounting period> system=<your close calendar>
change=<the month end passes>
concurrency: runs may overlap across entities - one month of one entity
is one run, an entity has one close open at a time, and the
next month's close starts only once this one is signed off
goal: every task on the close calendar for <the month> done by its owner
and reviewed, every reconciliation signed off, every movement above
<your threshold> explained, and the close signed off by <your
controller role> within <days> of the month end
phases:
open-calendar - system: the close calendar opened at its version
with every task, one owner and one day on each,
and the quarter and year tasks where they apply,
as <your controller role> confirms it
owner: close-plan-keeper after: trigger
automation: <level>
announce-cutoffs - system: the last day for entries from each
sub-ledger and each team announced to every task
owner, with the calendar at its version
owner: close-plan-keeper
after: open-calendar automation: <level>
close-sub-ledgers - human: each <your sub-ledger owner role> closes the
payables, receivables, asset, lease, payroll or
revenue sub-ledger by its day, and its totals
agree to the ledger
owner: <your sub-ledger owner role>
after: announce-cutoffs by: <days>
automation: never
book-accruals - system: the period's accruals worked out,
reviewed and posted through
ref/fin/book-the-period-end-accruals by their day
on the calendar
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
post-close-journals - system: the allocations, reclassifications and
corrections the calendar names, each prepared and
posted through ref/fin/post-a-manual-journal-entry
once a named approver has approved it
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
reconcile-accounts - system: every account on <your reconciliation
list> reconciled through
ref/fin/reconcile-a-balance-sheet-account and
signed off by its reviewer by its day
owner: account-reconciler
after: book-accruals + post-close-journals
automation: <level>
chase-late-tasks - runs roll-call: each task past its day chased with
its owner, and either done the same day or re-dated
with <your controller role> , with every task
behind it re-dated too
owner: close-plan-keeper
after: announce-cutoffs automation: <level>
compare-periods - runs assessment: each account in each entity's
trial balance set beside the last period, and
each movement above <your threshold> with no
explanation flagged
owner: reporting-accountant
after: reconcile-accounts + chase-late-tasks
automation: <level>
explain-movements - human: each <your account owner role> explains
each flagged movement in writing with the
evidence behind it, or names it as an error
owner: <your account owner role>
after: compare-periods by: <days>
automation: never
correct-errors - system: each error found corrected by an entry
prepared and posted through
ref/fin/post-a-manual-journal-entry once a named
approver has approved it
owner: ledger-accountant
after: explain-movements, when a movement is an
error automation: <level>
review-close - convenes assessment: <your controller role> reads
the calendar, the signed reconciliations, the
journals and the explained movements, and names
anything not done or not reviewed
owner: <your controller role>
after: explain-movements, and correct-errors
when it ran by: <days>
automation: never
sign-off-close - convenes approval: <your controller role> signs
off the close at its version and closes the
period to entries in <your general ledger>
owner: <your controller role>
after: review-close by: <days>
automation: never
record-sign-off - system: the version of the close signed off, who
signed it and when, kept with the calendar and
every reconciliation and journal it covers
owner: reporting-accountant
after: sign-off-close automation: <level>
hand-on-books - system: each entity's closed trial balance handed
to ref/fin/consolidate-the-group-accounts and
ref/fin/report-the-monthly-results, with the
figures the tax provision and the covenant tests
read
owner: reporting-accountant
after: record-sign-off automation: <level>
record-learning - convenes debrief: which tasks slipped and why,
the day each part of the close finished, the
corrections found late, and what next month's
calendar changes
owner: close-plan-keeper
after: hand-on-books automation: <level>
run-scoped:
calendar - runs roll-call owner: close-plan-keeper
every: <cadence>
from: open-calendar until: sign-off-close
handoffs:
open-calendar -> announce-cutoffs [close-calendar]: every task with its
owner and its day, at the calendar's version
announce-cutoffs -> close-sub-ledgers / chase-late-tasks [cutoffs]: the
last day for entries from each sub-ledger and team
close-sub-ledgers -> book-accruals / post-close-journals
[closed-sub-ledgers]: each sub-ledger closed, with its totals agreed
to the ledger
book-accruals -> reconcile-accounts [posted-accruals]: the accrual
schedule and the posted journals
post-close-journals -> reconcile-accounts [posted-close-journals]: each
close journal as posted, with its approval
reconcile-accounts -> compare-periods [signed-reconciliations]: every
reconciliation on the list, signed off by its reviewer
chase-late-tasks -> compare-periods [task-status]: every task done or
re-dated, with the reason for each new date
compare-periods -> explain-movements [flagged-movements]: each movement
above the threshold with no explanation
explain-movements -> correct-errors / review-close
[explained-movements]: each movement explained with evidence, or named
as an error
correct-errors -> review-close [corrections]: each correcting entry as
posted, with its approval
review-close -> sign-off-close [reviewed-close]: the close as the
controller read it, with nothing left open
sign-off-close -> record-sign-off [signed-off-close]: the close signed
off at its version and the period closed to entries
record-sign-off -> hand-on-books [sign-off-record]: who signed, what
version and when
hand-on-books -> record-learning [closed-books]: each entity's closed
trial balance as it was handed on
deviations:
chase-late-tasks -> open-calendar [date-moves]: a task cannot be done by
its day, so the calendar is re-dated at a new version and every task
behind it moves too
correct-errors -> reconcile-accounts [correction-touches-account]: a
correction posts to an account already reconciled, so that account is
reconciled again and signed off again
review-close -> chase-late-tasks [task-not-done]: the controller finds a
task not done or not reviewed, so it is chased with its owner before
the close returns
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the controller, each sub-ledger
owner, each account owner, the accrual reviewer, the journal
approvers and the reconciliation reviewers>
systems: the general ledger (write), the close calendar (write), the
ERP (read), the payroll system (read), the billing system
(read), the asset and lease register (read), the notification
channel (write)
data: <your close calendar> <version> , <your reconciliation list>
<version> , <your threshold for movements> <version> , <your
close policy> <version>
policy:
every task on the calendar has one owner and one day, and a day moves
only with <your controller role> 's agreement, recorded with the reason
no journal posts in the close without an approval by a named person who
did not prepare it
no reconciliation counts toward the close until a named reviewer who
did not prepare it has signed it off
every movement above <your threshold> is explained in writing by its
owner before the controller signs off
the controller signs off the close in writing, and no agent signs off a
close or closes a period
a closed period is reopened only by <your controller role> in writing,
with the reason and the entries it lets in, and it is closed again
with a new sign-off
each entity closes under <your accounting framework> and the local
rules that apply to it, and its calendar names any task they add
measures:
cycle time: <working days> from the month end to the sign-off
on time: <target> share of calendar tasks done by their day
volume: <tasks per close>
quality gate: every close signed off has every task done and reviewed,
every reconciliation signed off and every large movement
explained
Copy
Take it somewhere
Use this process in LangGraph
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current LangGraph documentation, then writes two files: the graph, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
312 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable LangGraph graph:
one Python file with a TypedDict state, a StateGraph, nodes, edges,
conditional edges and a checkpointer.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.langchain.com/oss/python/langgraph/interrupts
interrupt() and Command(resume=), which is how a gate stops a run
https://reference.langchain.com/python/langgraph/graph/state/StateGraph
StateGraph, add_edge, add_conditional_edges, defer
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN LANGGRAPH
11. A phase is a node added with `add_node`, under the phase's own name.
12. The state is a TypedDict. Each handoff key is one field on it.
13. A join is the trap. `add_edge(["a", "b"], "c")` looks right and releases
once: when a backward edge re-enters ONE arm, the joined node never runs
again, and the run ends early reporting success rather than raising. Mark the
joined node `defer=True` and re-check inside it that both inbound handoffs
exist.
14. A gate is `interrupt()` inside the node, resumed with `Command(resume=...)`.
The platform lets anything at all call resume, so require the resumed value to
name a person and a date and refuse anything else. Say in the fidelity note
that this proves only that whoever resumed typed a name, because
`Command(resume=True)` from a scheduled job is indistinguishable from a person
signing.
15. A deviation is `add_conditional_edges` with a routing function named after
the key in brackets.
16. Pass a durable checkpointer rather than taking the in-memory default. The
gates wait days, and the default loses every paused run on restart.
17. Leave every phase body unimplemented, raising until somebody registers an
implementation. The automation level is a blank, so writing a body would
answer on the adopter's behalf whether an agent may do that work.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: close the month id: <team>/close-the-month v1
from: ref/fin/close-the-month v1
owner: <who> effective: <date>
trigger: a month of an entity reaches its end on <your close calendar>
watch: record=<accounting period> system=<your close calendar>
change=<the month end passes>
concurrency: runs may overlap across entities - one month of one entity
is one run, an entity has one close open at a time, and the
next month's close starts only once this one is signed off
goal: every task on the close calendar for <the month> done by its owner
and reviewed, every reconciliation signed off, every movement above
<your threshold> explained, and the close signed off by <your
controller role> within <days> of the month end
phases:
open-calendar - system: the close calendar opened at its version
with every task, one owner and one day on each,
and the quarter and year tasks where they apply,
as <your controller role> confirms it
owner: close-plan-keeper after: trigger
automation: <level>
announce-cutoffs - system: the last day for entries from each
sub-ledger and each team announced to every task
owner, with the calendar at its version
owner: close-plan-keeper
after: open-calendar automation: <level>
close-sub-ledgers - human: each <your sub-ledger owner role> closes the
payables, receivables, asset, lease, payroll or
revenue sub-ledger by its day, and its totals
agree to the ledger
owner: <your sub-ledger owner role>
after: announce-cutoffs by: <days>
automation: never
book-accruals - system: the period's accruals worked out,
reviewed and posted through
ref/fin/book-the-period-end-accruals by their day
on the calendar
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
post-close-journals - system: the allocations, reclassifications and
corrections the calendar names, each prepared and
posted through ref/fin/post-a-manual-journal-entry
once a named approver has approved it
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
reconcile-accounts - system: every account on <your reconciliation
list> reconciled through
ref/fin/reconcile-a-balance-sheet-account and
signed off by its reviewer by its day
owner: account-reconciler
after: book-accruals + post-close-journals
automation: <level>
chase-late-tasks - runs roll-call: each task past its day chased with
its owner, and either done the same day or re-dated
with <your controller role>, with every task
behind it re-dated too
owner: close-plan-keeper
after: announce-cutoffs automation: <level>
compare-periods - runs assessment: each account in each entity's
trial balance set beside the last period, and
each movement above <your threshold> with no
explanation flagged
owner: reporting-accountant
after: reconcile-accounts + chase-late-tasks
automation: <level>
explain-movements - human: each <your account owner role> explains
each flagged movement in writing with the
evidence behind it, or names it as an error
owner: <your account owner role>
after: compare-periods by: <days>
automation: never
correct-errors - system: each error found corrected by an entry
prepared and posted through
ref/fin/post-a-manual-journal-entry once a named
approver has approved it
owner: ledger-accountant
after: explain-movements, when a movement is an
error automation: <level>
review-close - convenes assessment: <your controller role> reads
the calendar, the signed reconciliations, the
journals and the explained movements, and names
anything not done or not reviewed
owner: <your controller role>
after: explain-movements, and correct-errors
when it ran by: <days>
automation: never
sign-off-close - convenes approval: <your controller role> signs
off the close at its version and closes the
period to entries in <your general ledger>
owner: <your controller role>
after: review-close by: <days>
automation: never
record-sign-off - system: the version of the close signed off, who
signed it and when, kept with the calendar and
every reconciliation and journal it covers
owner: reporting-accountant
after: sign-off-close automation: <level>
hand-on-books - system: each entity's closed trial balance handed
to ref/fin/consolidate-the-group-accounts and
ref/fin/report-the-monthly-results, with the
figures the tax provision and the covenant tests
read
owner: reporting-accountant
after: record-sign-off automation: <level>
record-learning - convenes debrief: which tasks slipped and why,
the day each part of the close finished, the
corrections found late, and what next month's
calendar changes
owner: close-plan-keeper
after: hand-on-books automation: <level>
run-scoped:
calendar - runs roll-call owner: close-plan-keeper
every: <cadence>
from: open-calendar until: sign-off-close
handoffs:
open-calendar -> announce-cutoffs [close-calendar]: every task with its
owner and its day, at the calendar's version
announce-cutoffs -> close-sub-ledgers / chase-late-tasks [cutoffs]: the
last day for entries from each sub-ledger and team
close-sub-ledgers -> book-accruals / post-close-journals
[closed-sub-ledgers]: each sub-ledger closed, with its totals agreed
to the ledger
book-accruals -> reconcile-accounts [posted-accruals]: the accrual
schedule and the posted journals
post-close-journals -> reconcile-accounts [posted-close-journals]: each
close journal as posted, with its approval
reconcile-accounts -> compare-periods [signed-reconciliations]: every
reconciliation on the list, signed off by its reviewer
chase-late-tasks -> compare-periods [task-status]: every task done or
re-dated, with the reason for each new date
compare-periods -> explain-movements [flagged-movements]: each movement
above the threshold with no explanation
explain-movements -> correct-errors / review-close
[explained-movements]: each movement explained with evidence, or named
as an error
correct-errors -> review-close [corrections]: each correcting entry as
posted, with its approval
review-close -> sign-off-close [reviewed-close]: the close as the
controller read it, with nothing left open
sign-off-close -> record-sign-off [signed-off-close]: the close signed
off at its version and the period closed to entries
record-sign-off -> hand-on-books [sign-off-record]: who signed, what
version and when
hand-on-books -> record-learning [closed-books]: each entity's closed
trial balance as it was handed on
deviations:
chase-late-tasks -> open-calendar [date-moves]: a task cannot be done by
its day, so the calendar is re-dated at a new version and every task
behind it moves too
correct-errors -> reconcile-accounts [correction-touches-account]: a
correction posts to an account already reconciled, so that account is
reconciled again and signed off again
review-close -> chase-late-tasks [task-not-done]: the controller finds a
task not done or not reviewed, so it is chased with its owner before
the close returns
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the controller, each sub-ledger
owner, each account owner, the accrual reviewer, the journal
approvers and the reconciliation reviewers>
systems: the general ledger (write), the close calendar (write), the
ERP (read), the payroll system (read), the billing system
(read), the asset and lease register (read), the notification
channel (write)
data: <your close calendar> <version>, <your reconciliation list>
<version>, <your threshold for movements> <version>, <your
close policy> <version>
policy:
every task on the calendar has one owner and one day, and a day moves
only with <your controller role>'s agreement, recorded with the reason
no journal posts in the close without an approval by a named person who
did not prepare it
no reconciliation counts toward the close until a named reviewer who
did not prepare it has signed it off
every movement above <your threshold> is explained in writing by its
owner before the controller signs off
the controller signs off the close in writing, and no agent signs off a
close or closes a period
a closed period is reopened only by <your controller role> in writing,
with the reason and the entries it lets in, and it is closed again
with a new sign-off
each entity closes under <your accounting framework> and the local
rules that apply to it, and its calendar names any task they add
measures:
cycle time: <working days> from the month end to the sign-off
on time: <target> share of calendar tasks done by their day
volume: <tasks per close>
quality gate: every close signed off has every task done and reviewed,
every reconciliation signed off and every large movement
explained
```
Take it somewhere
Use this process in Microsoft Agent Framework
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current Agent Framework documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
367 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Microsoft Agent Framework workflow:
one Python file with Executor classes, a WorkflowBuilder, typed edges,
request_info gates and durable checkpoint storage.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://learn.microsoft.com/en-us/agent-framework/workflows/human-in-the-loop
ctx.request_info, @response_handler, and answering a parked run later
https://learn.microsoft.com/en-us/agent-framework/workflows/checkpoints
what a checkpoint holds, and allowed_checkpoint_types
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/edges
add_edge with condition, add_fan_in_edges, add_switch_case_edge_group
https://learn.microsoft.com/en-us/agent-framework/concepts/workflows/state
ctx.set_state and ctx.get_state as they actually are today
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN MICROSOFT AGENT FRAMEWORK
11. Write for Python, and read those pages before writing a line. This API has
moved: `set_shared_state`, `RequestInfoExecutor`, `RequestInfoMessage` and
`send_responses_streaming` are all in the training data and none of them exist
any more. The .NET workflow API differs in kind rather than in spelling, so a
file written for one does not port by renaming.
12. A phase is a class deriving from `Executor` whose `super().__init__(id=...)`
takes the phase name verbatim. The id is not cosmetic: a checkpoint stores a
signature over the topology and the executor ids, so an id built from a run, a
timestamp or a counter cannot be resumed into.
13. Give each phase a `@handler` method and move work on with
`await ctx.send_message(...)`. A handler that returns without sending is a dead
end: the branch stops, the run converges, and it reports success. So a phase
you are deliberately leaving unimplemented must still send a placeholder
onward. Do not stub with `raise NotImplementedError`, which fails the run
instead of leaving it runnable.
14. `after: a` is `builder.add_edge(a, b)`. `after: a + b` is
`builder.add_fan_in_edges([a, b], target)`, and the target's handler must be
annotated `list[T]`, because a fan-in delivers one aggregated list rather than
the separate messages. A handler typed for the single value is dropped as a
mismatch with nothing raised.
15. The join is the trap here, and it is the opposite of LangGraph's. The
barrier re-arms: it clears its buffer when it fires and then demands a fresh
message from every source. So a deviation that re-enters ONE arm parks the
run forever waiting for an arm that will not run again, and the workflow ends
IDLE reporting success. Wherever a deviation re-enters one arm of a join,
replace the barrier with an ordinary edge from each arm into a small executor
that records each arrival with `ctx.set_state` and only forwards when every
expected key is present, and say in a comment that putting `add_fan_in_edges`
back reintroduces the stall.
16. A phase that is both a join target and a deviation target needs two
handlers, one annotated `list[T]` for the barrier and one annotated `T` for the
backward message. Write only the list handler and every backward edge into it
is discarded as a type mismatch, silently.
17. `automation: never` is `await ctx.request_info(request_data=...,
response_type=...)` inside the phase, answered by a `@response_handler` on the
same executor whose annotations match those exact types. The run parks at
`IDLE_WITH_PENDING_REQUESTS` and the host answers with
`workflow.run(stream=True, responses={request_id: value})`. If no handler
matches the pair, the framework logs a warning and parks anyway, so the gate
reads as working right up until somebody asks why the approval did not take.
18. A gate is only a gate if the wait survives a restart, so pass
`checkpoint_storage=FileCheckpointStorage(...)` to the builder. Checkpointing
is off by default and `InMemoryCheckpointStorage` reads as configured while
persisting nothing. Register every handoff payload type in
`allowed_checkpoint_types`, or the first restore raises. Anything an executor
keeps as an instance attribute is absent after a restore unless you export it
from `on_checkpoint_save` and read it back in `on_checkpoint_restore`, and it
comes back empty rather than missing.
19. Each line under `deviations:` is `builder.add_edge(source, earlier,
condition=fn)` with `fn` named after the key. Cycles are legal and unchecked,
but raise `max_iterations` well above its default of 100, because several live
cycles will exhaust a budget sized for a straight line and fail with a message
about convergence that reads like a broken graph. Keep the ordinary forward
edge unconditional and add each deviation beside it: a condition that returns
false is dropped with no event, so a forward path expressed as a condition
dies silently on every normal run, which is most of them.
20. Handoff values go in `ctx.set_state(key, value)` and come back from
`ctx.get_state(key)`, untyped and unchecked. A write is visible to its writer
at once and to everyone else only in the next superstep, and two writers of one
key in a superstep keep the last write. Never read a key in the same superstep
another phase wrote it.
21. There are no timers, no deadlines and no scheduled wakes. Nothing in
`run-scoped:` becomes an executor and `by:` has no expression at all, so write
them as comments naming where they start and stop, and say plainly in the
fidelity note that a run can close over an unfinished run-scoped line. Do not
fake a deadline with a sleep inside a handler, which blocks the whole superstep
barrier, and never let an expiring wait release a gate.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: close the month id: <team>/close-the-month v1
from: ref/fin/close-the-month v1
owner: <who> effective: <date>
trigger: a month of an entity reaches its end on <your close calendar>
watch: record=<accounting period> system=<your close calendar>
change=<the month end passes>
concurrency: runs may overlap across entities - one month of one entity
is one run, an entity has one close open at a time, and the
next month's close starts only once this one is signed off
goal: every task on the close calendar for <the month> done by its owner
and reviewed, every reconciliation signed off, every movement above
<your threshold> explained, and the close signed off by <your
controller role> within <days> of the month end
phases:
open-calendar - system: the close calendar opened at its version
with every task, one owner and one day on each,
and the quarter and year tasks where they apply,
as <your controller role> confirms it
owner: close-plan-keeper after: trigger
automation: <level>
announce-cutoffs - system: the last day for entries from each
sub-ledger and each team announced to every task
owner, with the calendar at its version
owner: close-plan-keeper
after: open-calendar automation: <level>
close-sub-ledgers - human: each <your sub-ledger owner role> closes the
payables, receivables, asset, lease, payroll or
revenue sub-ledger by its day, and its totals
agree to the ledger
owner: <your sub-ledger owner role>
after: announce-cutoffs by: <days>
automation: never
book-accruals - system: the period's accruals worked out,
reviewed and posted through
ref/fin/book-the-period-end-accruals by their day
on the calendar
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
post-close-journals - system: the allocations, reclassifications and
corrections the calendar names, each prepared and
posted through ref/fin/post-a-manual-journal-entry
once a named approver has approved it
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
reconcile-accounts - system: every account on <your reconciliation
list> reconciled through
ref/fin/reconcile-a-balance-sheet-account and
signed off by its reviewer by its day
owner: account-reconciler
after: book-accruals + post-close-journals
automation: <level>
chase-late-tasks - runs roll-call: each task past its day chased with
its owner, and either done the same day or re-dated
with <your controller role>, with every task
behind it re-dated too
owner: close-plan-keeper
after: announce-cutoffs automation: <level>
compare-periods - runs assessment: each account in each entity's
trial balance set beside the last period, and
each movement above <your threshold> with no
explanation flagged
owner: reporting-accountant
after: reconcile-accounts + chase-late-tasks
automation: <level>
explain-movements - human: each <your account owner role> explains
each flagged movement in writing with the
evidence behind it, or names it as an error
owner: <your account owner role>
after: compare-periods by: <days>
automation: never
correct-errors - system: each error found corrected by an entry
prepared and posted through
ref/fin/post-a-manual-journal-entry once a named
approver has approved it
owner: ledger-accountant
after: explain-movements, when a movement is an
error automation: <level>
review-close - convenes assessment: <your controller role> reads
the calendar, the signed reconciliations, the
journals and the explained movements, and names
anything not done or not reviewed
owner: <your controller role>
after: explain-movements, and correct-errors
when it ran by: <days>
automation: never
sign-off-close - convenes approval: <your controller role> signs
off the close at its version and closes the
period to entries in <your general ledger>
owner: <your controller role>
after: review-close by: <days>
automation: never
record-sign-off - system: the version of the close signed off, who
signed it and when, kept with the calendar and
every reconciliation and journal it covers
owner: reporting-accountant
after: sign-off-close automation: <level>
hand-on-books - system: each entity's closed trial balance handed
to ref/fin/consolidate-the-group-accounts and
ref/fin/report-the-monthly-results, with the
figures the tax provision and the covenant tests
read
owner: reporting-accountant
after: record-sign-off automation: <level>
record-learning - convenes debrief: which tasks slipped and why,
the day each part of the close finished, the
corrections found late, and what next month's
calendar changes
owner: close-plan-keeper
after: hand-on-books automation: <level>
run-scoped:
calendar - runs roll-call owner: close-plan-keeper
every: <cadence>
from: open-calendar until: sign-off-close
handoffs:
open-calendar -> announce-cutoffs [close-calendar]: every task with its
owner and its day, at the calendar's version
announce-cutoffs -> close-sub-ledgers / chase-late-tasks [cutoffs]: the
last day for entries from each sub-ledger and team
close-sub-ledgers -> book-accruals / post-close-journals
[closed-sub-ledgers]: each sub-ledger closed, with its totals agreed
to the ledger
book-accruals -> reconcile-accounts [posted-accruals]: the accrual
schedule and the posted journals
post-close-journals -> reconcile-accounts [posted-close-journals]: each
close journal as posted, with its approval
reconcile-accounts -> compare-periods [signed-reconciliations]: every
reconciliation on the list, signed off by its reviewer
chase-late-tasks -> compare-periods [task-status]: every task done or
re-dated, with the reason for each new date
compare-periods -> explain-movements [flagged-movements]: each movement
above the threshold with no explanation
explain-movements -> correct-errors / review-close
[explained-movements]: each movement explained with evidence, or named
as an error
correct-errors -> review-close [corrections]: each correcting entry as
posted, with its approval
review-close -> sign-off-close [reviewed-close]: the close as the
controller read it, with nothing left open
sign-off-close -> record-sign-off [signed-off-close]: the close signed
off at its version and the period closed to entries
record-sign-off -> hand-on-books [sign-off-record]: who signed, what
version and when
hand-on-books -> record-learning [closed-books]: each entity's closed
trial balance as it was handed on
deviations:
chase-late-tasks -> open-calendar [date-moves]: a task cannot be done by
its day, so the calendar is re-dated at a new version and every task
behind it moves too
correct-errors -> reconcile-accounts [correction-touches-account]: a
correction posts to an account already reconciled, so that account is
reconciled again and signed off again
review-close -> chase-late-tasks [task-not-done]: the controller finds a
task not done or not reviewed, so it is chased with its owner before
the close returns
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the controller, each sub-ledger
owner, each account owner, the accrual reviewer, the journal
approvers and the reconciliation reviewers>
systems: the general ledger (write), the close calendar (write), the
ERP (read), the payroll system (read), the billing system
(read), the asset and lease register (read), the notification
channel (write)
data: <your close calendar> <version>, <your reconciliation list>
<version>, <your threshold for movements> <version>, <your
close policy> <version>
policy:
every task on the calendar has one owner and one day, and a day moves
only with <your controller role>'s agreement, recorded with the reason
no journal posts in the close without an approval by a named person who
did not prepare it
no reconciliation counts toward the close until a named reviewer who
did not prepare it has signed it off
every movement above <your threshold> is explained in writing by its
owner before the controller signs off
the controller signs off the close in writing, and no agent signs off a
close or closes a period
a closed period is reopened only by <your controller role> in writing,
with the reason and the entries it lets in, and it is closed again
with a new sign-off
each entity closes under <your accounting framework> and the local
rules that apply to it, and its calendar names any task they add
measures:
cycle time: <working days> from the month end to the sign-off
on time: <target> share of calendar tasks done by their day
volume: <tasks per close>
quality gate: every close signed off has every task done and reviewed,
every reconciliation signed off and every large movement
explained
```
Take it somewhere
Use this process in CrewAI Flows
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current CrewAI documentation, then writes two files: the flow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
372 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable CrewAI Flow:
one Python file with a Pydantic state model, one Flow subclass, @start,
@listen, @router and a durable human feedback provider.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://docs.crewai.com/en/concepts/flows
Flow, @start, @listen, @router, and_, or_, state, kickoff, plot
https://docs.crewai.com/en/learn/human-feedback-in-flows
@human_feedback, the provider protocol, from_pending and resume
https://docs.crewai.com/en/guides/flows/mastering-flow-state
@persist and what persistence actually promises, which is less than it sounds
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN CREWAI FLOWS
11. Build a Flow, not a Crew. A Crew is a team of roles with no graph, no join,
no persistence handle and no gate, and cannot express this document at all.
Each phase is one method on a single `Flow` subclass, keeping its name with
hyphens turned into underscores. A phase that genuinely needs role-based agents
builds its own Crew inside its own method body, and the Flow stays the graph.
12. Declare the state as a Pydantic model bound as the type parameter,
`class NegotiateTheAgreement(Flow[NegotiationState])`, and read and write
`self.state.field`. Never use the untyped dict form: the handoff keys are this
process's memory, and an untyped dict turns a misspelt key into a handoff that
is silently absent. Keep the auto-injected `id` field, which is what every
resume depends on.
13. `after: a` is `@listen(a)`. `after: a + b` is `@listen(and_(a, b))`. Never
write `or_` where the document writes `+`.
14. Check every inbound handoff at the top of the method and raise if one is
missing. `@listen` says when a method may run and says nothing about what is
in hand when it does.
15. The join is the trap, and it is proven rather than theoretical. `and_()`
empties its accumulator the moment it fires, so re-entering BOTH arms works
forever, and re-entering ONE arm after it has fired leaves it holding a single
trigger and waiting for the other for good. The cascade drains, CrewAI prints
that the flow completed, and `kickoff()` returns normally. So for any joining
phase that a deviation can send work back into, do not use `and_()` at all:
make the join a `@router` that both arms trigger, which reads the state fields
and emits its label only when every inbound handoff is present. A router is
re-evaluated against durable state every time and is never suppressed by the
once-fired set.
16. Do not write a phase as `@listen(or_(and_(a, b), "some_label"))`. There is
one accumulator per listener, shared across every branch of its condition and
wiped when any branch satisfies, so the label firing while the join is half
full erases the arm that had already arrived.
17. `automation: never` is `@human_feedback(message=..., provider=...)` stacked
under the method's `@listen`, with a provider whose `request_feedback` raises
`HumanFeedbackPending`. The run then persists, returns that object from
`kickoff()`, and a different process answers later with `from_pending(flow_id,
persistence)` and `resume(text)`. Do not take the default `ConsoleProvider`,
which calls `input()`: that gate exists only while somebody is watching a
terminal, and a run started by a scheduler either hangs or takes an empty
string.
18. Silence must not approve, and the platform's default is that it does. With
`emit=[...]` set, an empty resume collapses to `default_outcome`, or to the
first label when that is unset, with no model consulted and nobody named. Treat
an empty or unrecognised answer as a refusal in your own router. And write the
approver's name and the time onto the state yourself, because
`HumanFeedbackResult` carries the text, the outcome and a timestamp but has no
field for the person, which the specification requires.
19. Each line under `deviations:` is a `@router` named after the key, returning
a label named after the same key, with the target subscribing as
`@listen(or_(normal_trigger, "the_label"))`. Route rather than listen
directly, because a router is re-evaluated on every cycle while a top-level
`or_` listener is suppressed after it first fires.
20. An exception edge is a `try` and `except` around the failing phase's body,
recording the failure on the state and emitting an exception label from a
router. Wiring it as `@listen(or_(x, y))` fires when those phases SUCCEED, so
the clearing phase would run on every healthy run.
21. An unimplemented phase is a method with the document's own sentence as its
docstring and a bare `pass`, which is safe because listeners still fire on a
`None` return. An unimplemented `@router` is not safe: returning `None` emits
no label, every phase below it disappears from the run including the gates, and
the flow reports success. A stub router must return a hard-coded label with a
TODO beside it, or raise.
22. Turn persistence on with `@persist(SQLiteFlowPersistence(...))`, then treat
every phase that performs a real act as something that will run twice.
Persistence saves the state fields and nothing else, so a restart rehydrates
the data and runs the graph again from `@start`: a flow that had already sent a
written refusal sends a second one. Guard each acting phase with a state field
it checks and sets.
23. There are no timers, no deadlines and no cadences, and `run-scoped:` has no
counterpart at all. Put each `by:` value as a named constant, name the
run-scoped lines in the module docstring as unimplemented obligations, and say
in the fidelity note that no deadline in this document is enforced by anything.
These absences produce no diagnostic whatsoever, which is exactly why they have
to be written down.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: close the month id: <team>/close-the-month v1
from: ref/fin/close-the-month v1
owner: <who> effective: <date>
trigger: a month of an entity reaches its end on <your close calendar>
watch: record=<accounting period> system=<your close calendar>
change=<the month end passes>
concurrency: runs may overlap across entities - one month of one entity
is one run, an entity has one close open at a time, and the
next month's close starts only once this one is signed off
goal: every task on the close calendar for <the month> done by its owner
and reviewed, every reconciliation signed off, every movement above
<your threshold> explained, and the close signed off by <your
controller role> within <days> of the month end
phases:
open-calendar - system: the close calendar opened at its version
with every task, one owner and one day on each,
and the quarter and year tasks where they apply,
as <your controller role> confirms it
owner: close-plan-keeper after: trigger
automation: <level>
announce-cutoffs - system: the last day for entries from each
sub-ledger and each team announced to every task
owner, with the calendar at its version
owner: close-plan-keeper
after: open-calendar automation: <level>
close-sub-ledgers - human: each <your sub-ledger owner role> closes the
payables, receivables, asset, lease, payroll or
revenue sub-ledger by its day, and its totals
agree to the ledger
owner: <your sub-ledger owner role>
after: announce-cutoffs by: <days>
automation: never
book-accruals - system: the period's accruals worked out,
reviewed and posted through
ref/fin/book-the-period-end-accruals by their day
on the calendar
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
post-close-journals - system: the allocations, reclassifications and
corrections the calendar names, each prepared and
posted through ref/fin/post-a-manual-journal-entry
once a named approver has approved it
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
reconcile-accounts - system: every account on <your reconciliation
list> reconciled through
ref/fin/reconcile-a-balance-sheet-account and
signed off by its reviewer by its day
owner: account-reconciler
after: book-accruals + post-close-journals
automation: <level>
chase-late-tasks - runs roll-call: each task past its day chased with
its owner, and either done the same day or re-dated
with <your controller role>, with every task
behind it re-dated too
owner: close-plan-keeper
after: announce-cutoffs automation: <level>
compare-periods - runs assessment: each account in each entity's
trial balance set beside the last period, and
each movement above <your threshold> with no
explanation flagged
owner: reporting-accountant
after: reconcile-accounts + chase-late-tasks
automation: <level>
explain-movements - human: each <your account owner role> explains
each flagged movement in writing with the
evidence behind it, or names it as an error
owner: <your account owner role>
after: compare-periods by: <days>
automation: never
correct-errors - system: each error found corrected by an entry
prepared and posted through
ref/fin/post-a-manual-journal-entry once a named
approver has approved it
owner: ledger-accountant
after: explain-movements, when a movement is an
error automation: <level>
review-close - convenes assessment: <your controller role> reads
the calendar, the signed reconciliations, the
journals and the explained movements, and names
anything not done or not reviewed
owner: <your controller role>
after: explain-movements, and correct-errors
when it ran by: <days>
automation: never
sign-off-close - convenes approval: <your controller role> signs
off the close at its version and closes the
period to entries in <your general ledger>
owner: <your controller role>
after: review-close by: <days>
automation: never
record-sign-off - system: the version of the close signed off, who
signed it and when, kept with the calendar and
every reconciliation and journal it covers
owner: reporting-accountant
after: sign-off-close automation: <level>
hand-on-books - system: each entity's closed trial balance handed
to ref/fin/consolidate-the-group-accounts and
ref/fin/report-the-monthly-results, with the
figures the tax provision and the covenant tests
read
owner: reporting-accountant
after: record-sign-off automation: <level>
record-learning - convenes debrief: which tasks slipped and why,
the day each part of the close finished, the
corrections found late, and what next month's
calendar changes
owner: close-plan-keeper
after: hand-on-books automation: <level>
run-scoped:
calendar - runs roll-call owner: close-plan-keeper
every: <cadence>
from: open-calendar until: sign-off-close
handoffs:
open-calendar -> announce-cutoffs [close-calendar]: every task with its
owner and its day, at the calendar's version
announce-cutoffs -> close-sub-ledgers / chase-late-tasks [cutoffs]: the
last day for entries from each sub-ledger and team
close-sub-ledgers -> book-accruals / post-close-journals
[closed-sub-ledgers]: each sub-ledger closed, with its totals agreed
to the ledger
book-accruals -> reconcile-accounts [posted-accruals]: the accrual
schedule and the posted journals
post-close-journals -> reconcile-accounts [posted-close-journals]: each
close journal as posted, with its approval
reconcile-accounts -> compare-periods [signed-reconciliations]: every
reconciliation on the list, signed off by its reviewer
chase-late-tasks -> compare-periods [task-status]: every task done or
re-dated, with the reason for each new date
compare-periods -> explain-movements [flagged-movements]: each movement
above the threshold with no explanation
explain-movements -> correct-errors / review-close
[explained-movements]: each movement explained with evidence, or named
as an error
correct-errors -> review-close [corrections]: each correcting entry as
posted, with its approval
review-close -> sign-off-close [reviewed-close]: the close as the
controller read it, with nothing left open
sign-off-close -> record-sign-off [signed-off-close]: the close signed
off at its version and the period closed to entries
record-sign-off -> hand-on-books [sign-off-record]: who signed, what
version and when
hand-on-books -> record-learning [closed-books]: each entity's closed
trial balance as it was handed on
deviations:
chase-late-tasks -> open-calendar [date-moves]: a task cannot be done by
its day, so the calendar is re-dated at a new version and every task
behind it moves too
correct-errors -> reconcile-accounts [correction-touches-account]: a
correction posts to an account already reconciled, so that account is
reconciled again and signed off again
review-close -> chase-late-tasks [task-not-done]: the controller finds a
task not done or not reviewed, so it is chased with its owner before
the close returns
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the controller, each sub-ledger
owner, each account owner, the accrual reviewer, the journal
approvers and the reconciliation reviewers>
systems: the general ledger (write), the close calendar (write), the
ERP (read), the payroll system (read), the billing system
(read), the asset and lease register (read), the notification
channel (write)
data: <your close calendar> <version>, <your reconciliation list>
<version>, <your threshold for movements> <version>, <your
close policy> <version>
policy:
every task on the calendar has one owner and one day, and a day moves
only with <your controller role>'s agreement, recorded with the reason
no journal posts in the close without an approval by a named person who
did not prepare it
no reconciliation counts toward the close until a named reviewer who
did not prepare it has signed it off
every movement above <your threshold> is explained in writing by its
owner before the controller signs off
the controller signs off the close in writing, and no agent signs off a
close or closes a period
a closed period is reopened only by <your controller role> in writing,
with the reason and the entries it lets in, and it is closed again
with a new sign-off
each entity closes under <your accounting framework> and the local
rules that apply to it, and its calendar names any task they add
measures:
cycle time: <working days> from the month end to the sign-off
on time: <target> share of calendar tasks done by their day
volume: <tasks per close>
quality gate: every close signed off has every task done and reviewed,
every reconciliation signed off and every large movement
explained
```
Take it somewhere
Use this process in Google ADK
close
Paste this into an assistant that can read the web, such as Claude, ChatGPT or Cursor. It reads the specification and the current ADK documentation, then writes two files: the workflow, and a note on what did not survive the translation. Read the note first. What a runtime cannot express is the part worth arguing about, and this process is a draft to argue with.
copy the prompt
363 lines · the document is inside it, so nothing else is needed
Convert the business process below into a runnable Google ADK workflow:
one Python file with a Workflow, nodes, routed edges, a JoinNode,
RequestInput gates and a persisting session service.
The document is a reference process written to the Agent Processes
specification. Read the specification before you start, because it defines
terms that look ordinary and are not:
https://agentprocesses.ai/spec.html
Sections 6 (the phase graph), 6.5.1 (exception edges), 6.7.1 (deviations),
7 (automation) and 8 (handoffs) are the ones this conversion turns on.
Then read the current documentation for the primitives you will need, rather
than relying on what you remember of the API:
https://adk.dev/graphs/routes/
nodes, tuple chains, Event(route=), JoinNode, back-edges
https://adk.dev/graphs/human-input/
RequestInput and the rerun_on_resume handoff
https://adk.dev/runtime/resume/
ResumabilityConfig, resuming by invocation id, at-least-once tools
https://adk.dev/graphs/data-handling/
Event.output against state, and the selector syntax in instructions
WHAT THE DOCUMENT ASKS FOR
These hold wherever the process lands, and they matter more than style.
1. Each phase under `phases:` becomes one step, and keeps its name.
2. `after:` gives the edges. `after: a + b` is a join and waits for BOTH.
Reading it as "either" is the defect the specification calls out by name.
3. Every handoff carries a key in square brackets. Each key becomes one field
on the run's state, named exactly as the key with hyphens turned into
underscores, and the sentence beside it becomes that field's comment. The key
is the stable name; the sentence is prose that may be rewritten.
4. A phase MUST NOT begin before its inbound handoff exists. Where that is
checkable, check it in the step rather than assuming it.
5. `automation: never` is a gate a person signs. The run stops there and does
not continue until a person's decision comes back. Do not turn one into a
notification, a log line, or an automatic transition, whatever the queue
looks like.
6. Each line under `deviations:` is a backward or sideways edge, returning to
the phase named on the right. The key in brackets names it, and that name
belongs in the code.
7. A phase whose `after:` reads like "X or Y, whichever could not finish" is an
exception edge: it is entered when those phases FAIL, not when they succeed.
Do not wire it as an ordinary successor.
8. Anything in angle brackets is a blank the adopting organization fills in.
Leave each one as a named constant at the top of the file with a TODO. Do not
invent a value, a threshold or a date.
9. Record the document's `from:` line at the top of the file, so it says which
reference process and which version it was generated from.
10. Run-scoped lines under `run-scoped:` are work that runs alongside the whole
process rather than at one point in it, and a run may not close while one is
unfinished. Say in the code what you did about them, including if the answer
is that the runtime has nowhere to put them.
HOW THAT LOOKS IN GOOGLE ADK
11. Build a `Workflow` from `google.adk.workflow`, and pin `google-adk>=2.0` in
a comment. Do not use `SequentialAgent`, `ParallelAgent` or `LoopAgent`: they
are deprecated in favour of the graph, and they carry their own defects around
state and control flow. The documentation moved to adk.dev, and anything you
remember about nesting agents rather than drawing a graph is out of date.
12. Each phase is one node keeping its name. Take the node kind from how the
phase resolves rather than from taste: a `human:` or `system:` phase is a plain
Python function node, and a `runs` or `convenes` phase is an `Agent`.
13. `after:` gives the edges, written as tuple chains in `edges=[...]`, and the
trigger is the `"START"` keyword. Take the order only from `after:` lines and
never from the order the phases are listed in.
14. `after: a + b` is a `JoinNode`, and it must be guarded, because this is the
worst trap of any runtime here. The join fires when every static predecessor is
marked COMPLETED, nothing ever un-completes a node, and stored outputs are
never cleared. So after a deviation re-runs one arm, the join fires the instant
that arm finishes and hands the next phase LAST PASS'S value for every arm that
did not re-run. It does not stall, it proceeds with stale data, and nothing
logs. Stamp each arm's output with a pass counter or a content hash, and have
the phase after the join compare the stamps and refuse to run when they
disagree.
15. Each line under `deviations:` is a routed back-edge: a router after the
phase on the left returning `Event(route=...)`, named after the key in
brackets, with one arm going back to the phase on the right and one going
forward. An unconditional cycle raises at construction, which is the one place
this model checks your work. Nothing budgets a routed cycle, so add your own
count and stop rather than looping forever.
16. Give every router an explicit `DEFAULT_ROUTE` arm, and route it to a phase
that stops and asks a person. A route value matching no key writes a log
warning, ends that branch, and lets the run finish reporting success with the
rest of the process never having happened.
17. `automation: never` is a `RequestInput` node of its own, never an `Agent`
asking a question. Decorate it `@node(rerun_on_resume=False)` and yield
`RequestInput(message=..., payload=..., response_schema=...)`, so the run
stops, persists, and delivers the person's answer to the node's successor as
its typed input. A resumed workflow runs its tools at least once, so any
irreversible act needs its own duplicate guard.
18. Make the gates durable or say plainly that they are not. Wrap the graph in
`App(..., resumability_config=ResumabilityConfig(is_resumable=True))` and pass
a persisting session service, never the in-memory one. Note in the file that
the command line and the web UI cannot resume a run, so whoever releases these
gates needs an operator surface that somebody has to write.
19. Every `Agent` in the graph gets `mode="single_turn"` and no `sub_agents`.
A non-empty `sub_agents` list silently adds a transfer tool, and a model that
uses it runs a different agent in this node's place while the graph's outgoing
edge fires on schedule regardless: the topology is honoured perfectly and the
work belongs to somebody else.
20. Model failure as a route, not as an exception. A node that raises does not
propagate: the failure is caught, recorded, and shuts the workflow down without
raising to the caller. So a phase that can fail catches its own failure and
returns `Event(route="could-not-finish")`, and the exception phase hangs off
that arm.
21. Keep every blank as a named module-level constant and never interpolate one
into an `instruction=` string. Angle brackets and curly braces are ADK's own
data selector syntax inside instructions, so a blank pasted verbatim stops
being a blank and becomes a selector.
22. `by:` and `not-before:` have no expression, and `@node(timeout=)` is not
one: it is an in-process wall clock that cancels the node and, because failures
are swallowed, ends the run silently rather than recording a missed deadline.
Nothing in `run-scoped:` has an expression either, and it must not be faked as
an ordinary node, because a node has to be reached and has to finish before
anything downstream starts, which is the opposite of what those lines mean.
Leave both out of the graph and name them in the fidelity note.
Produce a second file alongside it, `FIDELITY.md`, and treat it as the more
important of the two. The code is for whoever builds this. The fidelity note
is for whoever has to decide whether this platform suits the process at all,
and that is usually a different person who will never read the code.
It has three parts.
**What came across.** Briefly: how many phases became steps, how many handoff
keys became state fields, which gates stop the run, which deviations became
edges. Counts and names, not reassurance.
**What did not, and what was done instead.** One entry per gap. For each one,
say what the document requires, what the platform can actually express, what
you did in its place, and what breaks if somebody later removes your
workaround. This last part matters most: a workaround nobody understands is a
workaround somebody deletes.
**What a person still has to decide.** The blanks are not a translation
failure, they are the point of a reference process, so list what has to be
filled in before this could run against anything real, and say which of those
choices the platform constrains.
Write it in plain English for somebody who has not read the specification, and
do not soften it. A translation of a reference process is a draft to argue
with, not a build artifact, and the honest account of what was lost is the most
useful thing you will produce.
Here is the process document.
```
PROCESS: close the month id: <team>/close-the-month v1
from: ref/fin/close-the-month v1
owner: <who> effective: <date>
trigger: a month of an entity reaches its end on <your close calendar>
watch: record=<accounting period> system=<your close calendar>
change=<the month end passes>
concurrency: runs may overlap across entities - one month of one entity
is one run, an entity has one close open at a time, and the
next month's close starts only once this one is signed off
goal: every task on the close calendar for <the month> done by its owner
and reviewed, every reconciliation signed off, every movement above
<your threshold> explained, and the close signed off by <your
controller role> within <days> of the month end
phases:
open-calendar - system: the close calendar opened at its version
with every task, one owner and one day on each,
and the quarter and year tasks where they apply,
as <your controller role> confirms it
owner: close-plan-keeper after: trigger
automation: <level>
announce-cutoffs - system: the last day for entries from each
sub-ledger and each team announced to every task
owner, with the calendar at its version
owner: close-plan-keeper
after: open-calendar automation: <level>
close-sub-ledgers - human: each <your sub-ledger owner role> closes the
payables, receivables, asset, lease, payroll or
revenue sub-ledger by its day, and its totals
agree to the ledger
owner: <your sub-ledger owner role>
after: announce-cutoffs by: <days>
automation: never
book-accruals - system: the period's accruals worked out,
reviewed and posted through
ref/fin/book-the-period-end-accruals by their day
on the calendar
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
post-close-journals - system: the allocations, reclassifications and
corrections the calendar names, each prepared and
posted through ref/fin/post-a-manual-journal-entry
once a named approver has approved it
owner: ledger-accountant
after: close-sub-ledgers automation: <level>
reconcile-accounts - system: every account on <your reconciliation
list> reconciled through
ref/fin/reconcile-a-balance-sheet-account and
signed off by its reviewer by its day
owner: account-reconciler
after: book-accruals + post-close-journals
automation: <level>
chase-late-tasks - runs roll-call: each task past its day chased with
its owner, and either done the same day or re-dated
with <your controller role>, with every task
behind it re-dated too
owner: close-plan-keeper
after: announce-cutoffs automation: <level>
compare-periods - runs assessment: each account in each entity's
trial balance set beside the last period, and
each movement above <your threshold> with no
explanation flagged
owner: reporting-accountant
after: reconcile-accounts + chase-late-tasks
automation: <level>
explain-movements - human: each <your account owner role> explains
each flagged movement in writing with the
evidence behind it, or names it as an error
owner: <your account owner role>
after: compare-periods by: <days>
automation: never
correct-errors - system: each error found corrected by an entry
prepared and posted through
ref/fin/post-a-manual-journal-entry once a named
approver has approved it
owner: ledger-accountant
after: explain-movements, when a movement is an
error automation: <level>
review-close - convenes assessment: <your controller role> reads
the calendar, the signed reconciliations, the
journals and the explained movements, and names
anything not done or not reviewed
owner: <your controller role>
after: explain-movements, and correct-errors
when it ran by: <days>
automation: never
sign-off-close - convenes approval: <your controller role> signs
off the close at its version and closes the
period to entries in <your general ledger>
owner: <your controller role>
after: review-close by: <days>
automation: never
record-sign-off - system: the version of the close signed off, who
signed it and when, kept with the calendar and
every reconciliation and journal it covers
owner: reporting-accountant
after: sign-off-close automation: <level>
hand-on-books - system: each entity's closed trial balance handed
to ref/fin/consolidate-the-group-accounts and
ref/fin/report-the-monthly-results, with the
figures the tax provision and the covenant tests
read
owner: reporting-accountant
after: record-sign-off automation: <level>
record-learning - convenes debrief: which tasks slipped and why,
the day each part of the close finished, the
corrections found late, and what next month's
calendar changes
owner: close-plan-keeper
after: hand-on-books automation: <level>
run-scoped:
calendar - runs roll-call owner: close-plan-keeper
every: <cadence>
from: open-calendar until: sign-off-close
handoffs:
open-calendar -> announce-cutoffs [close-calendar]: every task with its
owner and its day, at the calendar's version
announce-cutoffs -> close-sub-ledgers / chase-late-tasks [cutoffs]: the
last day for entries from each sub-ledger and team
close-sub-ledgers -> book-accruals / post-close-journals
[closed-sub-ledgers]: each sub-ledger closed, with its totals agreed
to the ledger
book-accruals -> reconcile-accounts [posted-accruals]: the accrual
schedule and the posted journals
post-close-journals -> reconcile-accounts [posted-close-journals]: each
close journal as posted, with its approval
reconcile-accounts -> compare-periods [signed-reconciliations]: every
reconciliation on the list, signed off by its reviewer
chase-late-tasks -> compare-periods [task-status]: every task done or
re-dated, with the reason for each new date
compare-periods -> explain-movements [flagged-movements]: each movement
above the threshold with no explanation
explain-movements -> correct-errors / review-close
[explained-movements]: each movement explained with evidence, or named
as an error
correct-errors -> review-close [corrections]: each correcting entry as
posted, with its approval
review-close -> sign-off-close [reviewed-close]: the close as the
controller read it, with nothing left open
sign-off-close -> record-sign-off [signed-off-close]: the close signed
off at its version and the period closed to entries
record-sign-off -> hand-on-books [sign-off-record]: who signed, what
version and when
hand-on-books -> record-learning [closed-books]: each entity's closed
trial balance as it was handed on
deviations:
chase-late-tasks -> open-calendar [date-moves]: a task cannot be done by
its day, so the calendar is re-dated at a new version and every task
behind it moves too
correct-errors -> reconcile-accounts [correction-touches-account]: a
correction posts to an account already reconciled, so that account is
reconciled again and signed off again
review-close -> chase-late-tasks [task-not-done]: the controller finds a
task not done or not reviewed, so it is chased with its owner before
the close returns
bindings:
roster: <who holds each role - agents claiming the abstract agents
above, and named people for the controller, each sub-ledger
owner, each account owner, the accrual reviewer, the journal
approvers and the reconciliation reviewers>
systems: the general ledger (write), the close calendar (write), the
ERP (read), the payroll system (read), the billing system
(read), the asset and lease register (read), the notification
channel (write)
data: <your close calendar> <version>, <your reconciliation list>
<version>, <your threshold for movements> <version>, <your
close policy> <version>
policy:
every task on the calendar has one owner and one day, and a day moves
only with <your controller role>'s agreement, recorded with the reason
no journal posts in the close without an approval by a named person who
did not prepare it
no reconciliation counts toward the close until a named reviewer who
did not prepare it has signed it off
every movement above <your threshold> is explained in writing by its
owner before the controller signs off
the controller signs off the close in writing, and no agent signs off a
close or closes a period
a closed period is reopened only by <your controller role> in writing,
with the reason and the entries it lets in, and it is closed again
with a new sign-off
each entity closes under <your accounting framework> and the local
rules that apply to it, and its calendar names any task they add
measures:
cycle time: <working days> from the month end to the sign-off
on time: <target> share of calendar tasks done by their day
volume: <tasks per close>
quality gate: every close signed off has every task done and reviewed,
every reconciliation signed off and every large movement
explained
```
One run
A simulation of one run
The activities are on the left, whoever is doing the active one is on the right, and the record of the run builds up as it goes.
This run is built from the same rows as the diagram above: the left column is the activity list, the captions are the activity lines, the cast is the roster, and the labels on the wires are what the handoffs say actually passes.
Adoption
What you fill in
52 blanks to fill. Everything else is the process.
this process
from: ref/fin/close-the-month v1
Copy this line into your own document. It never claims this process is running anywhere; it records which draft yours started from, and it is what lets the catalog tell you when this one changes.
The header. Your own id, an owner, and the date it takes effect. One line records where it came from, and that line is what lets the catalog tell you when this reference process changes.
The roster. Which agent takes each activity, and which person takes each of the human ones. The process already names what it needs, so this is a lookup rather than a design exercise.
The numbers. Dates, budgets, cadences, and the targets in the measures block. Nothing here can be a reference value, because a target nobody chose is a target nobody meets.